Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 5 : Reunión 2019-09-16 : Documentos Temporales  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 5  TD (2019-09-16) 

UIT-T SG 5

Environment, climate change and circular economy

Periodo de estudios 2017

Reunión  del 2019-09-16 al 2019-09-20

Lugar : Suiza [Ginebra]

Otras reuniones : 2021-11-30  2021-05-11  2020-10-19  2020-05-11  [ 2019-09-16 ]  2019-05-13  2018-09-11  2018-05-21  2018-03-05  2017-11-13  2017-05-15 

Resultados :20 documentos
Documentos Temporales  (GEN)  [ AI/Cuestión: Q4/5 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1171-GEN ]  
(Rev.1) 
A.1 justification for Proposed new ITU-T Supplement on K.Sup.5G.EMC     Co-rapporteur Q4/5   Q4/5   2019-09-18
[ 1165-GEN ]  
 
Revision of K.114 "Electromagnetic compatibility requirements and measurement methods for digital cellular mobile communication base station equipment"     Co-rapporteur Q4/5   Q4/5   2019-09-18
[ 1151-GEN ]  
(Rev.1) 
Draft LS/o/r on EMC Standards and Limits - Further cooperation on reducing EMI and RF noise to (ITU-R WP1A-Document 1A/TEMP/198 , ITU-R WP1A-Document 1A/TEMP/175) [ITU-R WP1A] (answer to TD1043 and TD1044)     ITU-T Study Group 5   Q4/5   2019-09-17
[ 1150-GEN ]  
 
2nd draft of draft Recommendation ITU-T K.pim Passive intermodulation test methods of array antenna systems in mobile communication systems     Co-rapporteurs Q4/5   Q4/5   2019-09-17
[ 1149-GEN ]  
 
Revision of K.34 "Classification of electromagnetic environmental conditions for telecommunication equipment - Basic EMC Recommendation"     Co-rapporteurs Q4/5   Q4/5   2019-09-17
[ 1148-GEN ]  
 
Revision of Q4/5 description     Co-rapporteurs Q4/5   Q4/5   2019-09-17
[ 1147-GEN ]  
 
Revision of K.136 "Electromagnetic compatibility requirements for radio telecommunication equipment"     Co-rapporteurs Q4/5   Q4/5   2019-09-17
[ 1146-GEN ]  
 
Revision of K.137 "Electromagnetic compatibility requirements and measurement methods for wireline telecommunication network equipment"     Co-rapporteurs Q4/5   Q4/5   2019-09-17
[ 1145-GEN ]  
 
Revision of K.123 "Electromagnetic compatibility requirements for electrical equipment in telecommunication facilities"     Co-rapporteurs Q4/5   Q4/5   2019-09-17
[ 1131-GEN ]  
 
"EMC test method guide for integrated or combined equipment with radio function module"     Co-rapporteur Q4/5   Q4/5   2019-09-16
[ 1130-GEN ]  
 
Application information on draft Recommendation ITU-T K.PLC.EMC "Electromagnetic compatibility requirements and measurement methods for outdoor equipment using power line communication technology"     Co-rapporteur Q4/5   Q4/5   2019-09-16
[ 1118-GEN ]  
(Rev.1-5) 
Proposed revision of the wording of the Questions under WP1/5 responsibility     ITU-T SG5 Management Team   QALL/5, Q5/5, Q4/5, Q3/5, Q2/5, Q1/5   2019-09-13
[ 1106-GEN ]  
 
Report of ACEC meeting held on 10-11 June 2019 in Tagajo (Sendai), Japan     Liaison Rapporteur to ACEC   Q5/5, Q4/5, Q3/5, Q2/5, Q1/5   2019-09-11
[ 1098-GEN ]  
 
Conformity Assessment Steering Committee (CASC) Activity     Liaison rapporteur to CASC   Q8/5, Q5/5, Q4/5, Q3/5, Q2/5, Q1/5   2019-09-09
[ 1083-GEN ]  
(Rev.1) 
Draft Report of Question 4/5 (Geneva, 16-20 September 2019)     Co-rapporteurs Q4/5   Q4/5   2019-08-28
[ 1078-GEN ]  
(Rev.1-4) 
Draft Report of Working Party 1/5 (Geneva, 16-20 September 2019)     Chairman WP1/5   Q5/5, Q4/5, Q3/5, Q2/5, Q1/5   2019-08-28
[ 1060-GEN ]  
(Rev.1) 
Draft agenda for Question 4/5 meeting (Geneva, 16-20 September 2019)     Co-rapporteurs Q4/5   Q4/5   2019-08-28
[ 1055-GEN ]  
(Rev.1) 
Draft agenda for Working Party 1/5 meeting (Geneva, 16-20 September 2019)     Chairman WP1/5   Q5/5, Q4/5, Q3/5, Q2/5, Q1/5   2019-08-28
[ 1044-GEN ]  
 
LS/i on EMC Standards and Limits [from ITU-R WP1A]     ITU-R Working Party 1A   Q4/5   2019-08-06
[ 1043-GEN ]  
 
LS/i on EMC Standards and Limits - Further cooperation on reducing EMI and RF noise [from ITU-R WP1A]     ITU-R Working Party 1A   Q4/5   2019-08-06
Resultados :20 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-6-16