Contribuciones
[ Origen: British Telecommunications Public Ltd. Co. (BT Plc) ] |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 2211 ]
|
Average power, ER and OMA proposals in NG-PON2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2016-09-06 |
|
[ 2210 ]
|
G.fast: Maximal Ratio Transmission over FEXT channels
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2209 ]
|
G.fast: On mixed sampling frequency G.fast vector groups
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2208 ]
|
G.fast: Zero Forcing Pre-coder optimisation
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2189 ]
|
Equipment reflections in NG-PON2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2016-09-06 |
|
[ 2186 ]
|
xPON Access HRMs and Performance for LTE and CA Applications
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15, Q13/15
|
2016-09-06 |
|
[ 2185 ]
|
GPON Time Error Transfer performance for a loaded Access System
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2016-09-06 |
|
[ 2184 ]
|
GPON Time Error increase when adding more ONUs
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2016-09-06 |
|
[ 2182 ]
|
VDSL: Long Reach VDSL2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2170 ]
|
G.fast: Mobile backhaul use cases
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2146 ]
(Rev.1) |
G.fast: A framework for seamless reconfiguration
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Intel Corporation
|
Q4/15
|
2016-09-06 |
|
[ 2000 ]
|
Wavelength Plan Proposal for G.metro
|
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
Telefon AB - LM Ericsson
|
Q6/15
|
2016-09-05 |
|
[ 1943 ]
|
Parameters for pilot tones and message channel for G.metro
|
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Unicom
,
Telefon AB - LM Ericsson
|
Q6/15
|
2016-09-02 |
|
[ 1942 ]
|
Appendix on Principles of Operation for G.metro
|
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Unicom
,
Telefon AB - LM Ericsson
|
Q6/15
|
2016-09-02 |
|
[ 1829 ]
|
GPON Time Error Transfer performance and interface mapping
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2016-02-02 |
|
[ 1828 ]
|
Transport / Access Time Phase HRM
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2016-02-02 |
|
[ 1815 ]
|
OOC-PSD mask in NG-PON2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2016-02-02 |
|
[ 1806 ]
|
Future work on G.fast recommendations
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1805 ]
|
G.fast, Editorial Correction to Figure Z-2.1
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1791 ]
|
G.fast: On data rate reporting
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1783 ]
|
G.fast: Upstream Hlog reporting
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1782 ]
|
G.ploam, Capability reporting in G.997.1 and G.997.2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1774 ]
|
On G.fast based solution for Coax application
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-02-02 |
|
[ 1729 ]
|
Dual-rate support in XGS-PON
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Telecommunications Corporation
,
China Unicom
,
FiberHome Technologies Group
,
Futurewei Technologies US R&D Center
,
Huawei Technologies Co., Ltd.
,
Orange
,
ZTE Corporation
|
Q2/15
|
2016-02-02 |
|
[ 1663 ]
|
Communication channel in G.metro
|
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Unicom
,
Deutsche Telekom AG
,
Telefon AB - LM Ericsson
|
Q14/15
|
2016-02-01 |
|
[ 1499 ]
|
Release of BT cable (20 pair) NEXT measurements for use in simulations
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-12-10 |
|
[ 1490 ]
|
Annex C in 989.2 Amd1
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2015-06-09 |
|
[ 1475 ]
|
Loose ONU Calibration in NGPON2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2015-06-09 |
|
[ 1474 ]
|
10G symmetric, single-channel PON system
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2015-06-09 |
|
[ 1468 ]
|
ITU-T G.8271 Network Reference Model Extension
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2015-06-09 |
|
[ 1467 ]
|
Access Budget (Optical/Copper Media) within E2E Time/phase HRM
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2015-06-09 |
|
[ 1466 ]
|
ITU-T G.8271 Access HRM Model Extension
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2015-06-09 |
|
[ 1465 ]
|
ITU-T G.8271 Network Reference Model Extension
No file provided
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
|
2015-06-09 |
|
[ 1458 ]
|
G.fast changes to G.9701 (2014) to support Cross-Layer Low Power Mode Control Annex
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1448 ]
|
G.fast Cross-Layer Low Power Mode Control Annex in Draft Amendment 1 to Recommendation ITU-T G.9701 (2014)
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1422 ]
+Add.1 |
G.fast: Release of BT cable (100 pair) measurements for use in simulations
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1420 ]
|
G.997.1/G.998.4 Retransmission Counters
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1413 ]
|
G.fast Amendment 2 Priorities
|
AT&T, Inc.
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
CenturyLink
,
Deutsche Telekom AG
,
Orange
,
Swisscom SA
,
Telecom Italia S.p.A.
|
Q4/15
|
2015-06-09 |
|
[ 1385 ]
|
G.fast Low power Mode Control Managed Objects for G.997.2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1210 ]
|
Proposals to address issues 1, 2 & 3 in G.Suppl.51 LL (TD 543/WP1)
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2015-06-05 |
|
[ 1208 ]
|
TWDM-PON Protection time flow charts
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2015-06-05 |
|
[ 1206 ]
|
G.8031/Y.1342 - 1:1 Bidirectional Ethernet Protection Switching to Support Dual Parenting PON Protection
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Huawei Technologies Co., Ltd.
|
Q9/15
|
2015-06-05 |
|
[ 1181 ]
|
Proposals to address issues 4&5 in G.Suppl.51 LL (TD 543/WP1)
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2015-06-03 |
|
[ 1143 ]
|
Clause 14: Monitoring, Supervision, and Defects
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Verizon Communication Corporation
|
Q2/15
|
2014-11-11 |
|
[ 1124 ]
|
Downstream WNE-PSD in NGPON2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2014-11-11 |
|
[ 1123 ]
|
PMD Parameters for Low Loss Budget ODNs
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2014-11-11 |
|
[ 1121 ]
|
8 Channel TWDM in NGPON2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2014-11-11 |
|
[ 1116 ]
|
Upstream wavelength plan in NGPON2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2014-11-11 |
|
[ 1110 ]
|
G.9700 Out of band noise requirements
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-11-11 |
|
[ 1108 ]
|
G.VDSL: Immunity of VDSL2 to out of band interference from G.fast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-11-11 |
Resultados :76 documentos Resultados :
1 -
2
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):