Contribuciones
[ AI/Cuestión: Q4/15 ] |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 775 ]
(Rev.1) |
G.fast: BT TAP comments on G.9700 (ex G.fast-PSD)
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-11 |
|
[ 774 ]
|
Parameterization of L2.1 multi-step entry procedure
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2014-03-11 |
|
[ 773 ]
|
G.997.1: On extending G.997.1 to support PMA functionality
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-11 |
|
[ 772 ]
|
G.fast: On Reverse Power Feeding system noise requirements
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-11 |
|
[ 767 ]
|
G.vdsl2, G.inp: Stability issues and mitigation of non-stationary noise in LPM
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2014-03-11 |
|
[ 766 ]
|
G.fast: Additional requirements to address specifics of RPF noise
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2014-03-11 |
|
[ 764 ]
|
G.vdsl: New 998ADE17 Band Plan for VDSL2
|
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q4/15
|
2014-03-11 |
|
[ 763 ]
|
G.fast: Means for Transmission of Sync Symbols and RMC Symbols in L2.2
|
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q4/15
|
2014-03-11 |
|
[ 762 ]
|
G.fast: On TIGA and SRA
|
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q4/15
|
2014-03-11 |
|
[ 756 ]
|
Proposal of a new study item: "Plant solutions for FTTdp (Fiber To The distribution point) architecture"
|
Italy
|
Q4/15, Q16/15
|
2014-03-11 |
|
[ 751 ]
|
G.fast: Proposed Liaison to ETSI TM6 on RPF Noise
|
Alcatel-Lucent France
|
Q4/15
|
2014-03-11 |
|
[ 750 ]
(Rev.1) |
VDSL2 and G.FAST need a flexible protection mechanism against time varying noise.
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-11 |
|
[ 749 ]
|
G.fast: Data rate impact and requirements of Reverse Power Feeding systems
|
Alcatel-Lucent France
|
Q4/15
|
2014-03-11 |
|
[ 748 ]
|
G.inp: G.vdsl: VDSL2 Low Power Mode: Mandatory support of Virtual Noise
|
Alcatel-Lucent France
|
Q4/15
|
2014-03-11 |
|
[ 746 ]
|
G.fast: DTU's mapping and ACK bit-map structure (section 9.5)
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2014-03-11 |
|
[ 745 ]
|
G.fast: Alcatel-Lucent TAP comments on G.9700 (ex G.fast-PSD)
|
Alcatel-Lucent France
|
Q4/15
|
2014-03-11 |
|
[ 665 ]
|
G.fast: On the scope of G.fast Amendment 1
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-10 |
|
[ 664 ]
|
G.fast: On standardisation of advanced UPBO methods for vectored G.fast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2014-03-10 |
|
[ 607 ]
|
IPR statement.
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2014-03-10 |
|
[ 578 ]
|
G.fast: Comments on link-state transition
|
ZTE Corporation
|
Q4/15
|
2014-03-10 |
|
[ 511 ]
|
G.inp: Comparison of L2.1 power reduction methods
|
TQ DELTA. LLC
|
Q4/15
|
2014-03-07 |
|
[ 509 ]
|
G.hn, G.vdsl, G.fast : Objectives and Tools for PLC to DSL Interference Mitigation
|
Metanoia Technologies, Inc.
|
Q4/15, Q18/15
|
2014-03-07 |
|
[ 490 ]
|
IPR: Ikanos Communications on IPR declarations on G.9700 and G.9701.
|
Ikanos Communications
|
Q4/15
|
2014-03-07 |
|
[ 480 ]
|
G.inp: Proposed edits to help complete the VDSL LPM Amendment
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
Ikanos Communications
|
Q4/15
|
2014-03-07 |
|
[ 466 ]
|
Considerations on DS/US adjustment for the VDSL2
|
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q4/15
|
2014-03-07 |
Resultados :25 documentos
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):