Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 527 ]
|
Number of categories in Rec. ITU-T G.652
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2014-03-09 |
|
[ 526 ]
|
Information and comment on zero-dispersion wavelength of G.652 fibre
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q5/15
|
2014-03-09 |
|
[ 525 ]
|
G.8261 Synchronous Ethernet Network Jitter Specification beyond 10GE
|
Deutsche Telekom AG
|
Q13/15
|
2014-03-08 |
|
[ 524 ]
|
G.8262 Synchronous Ethernet Equipment Jitter Specification beyond 10GE
|
Deutsche Telekom AG
|
Q13/15
|
2014-03-08 |
|
[ 523 ]
|
Withdrawn by submitter
Reposted as TD193/PLEN, "Draft revised Recommendation ITU-T G.976 (for Consent, 4 April 2014)"
|
N/A (no se aplica)
|
|
2014-03-08 |
|
[ 522 ]
|
Proposal to discuss optical cables for low-cost sustainable telecommunication infrastructure for remote areas in developing countries
|
The ITU Association of Japan
|
Q16/15
|
2014-03-08 |
|
[ 521 ]
|
G.8152 v0.05 Data Dictionary clauses 1.7 - 1.11
|
Alcatel-Lucent USA Inc.
|
Q14/15
|
2014-03-08 |
|
[ 520 ]
|
Proposal Work Areas for updating G.8052
|
Alcatel-Lucent USA Inc.
|
Q14/15
|
2014-03-08 |
|
[ 519 ]
|
Updates in the G.8271.1
|
Telefon AB - LM Ericsson
|
Q13/15
|
2014-03-08 |
|
[ 518 ]
(Rev.1) |
Proposal for the Multiplexing of ODU clients into OTUCn
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-03-08 |
|
[ 517 ]
|
Cyclically Interleaved BCH "Swizzle" FEC for B100G IrDI or MV-IaDI
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-03-08 |
|
[ 516 ]
|
Timing Distribution with PTP-over-OTN Overhead Proposal
|
PMC-Sierra, Inc.
|
Q13/15, Q11/15
|
2014-03-08 |
|
[ 515 ]
|
OTUCn Overhead Byte proposal
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-03-08 |
|
[ 514 ]
|
Proposal for a scalable OTUCn frame structure
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-03-08 |
|
[ 513 ]
|
Overview summary of B100G frame format and 400GE client mapping proposals
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-03-08 |
|
[ 512 ]
|
400GbE client mapping proposals
|
PMC-Sierra, Inc.
|
Q11/15
|
2014-03-08 |
|
[ 511 ]
|
G.inp: Comparison of L2.1 power reduction methods
|
TQ DELTA. LLC
|
Q4/15
|
2014-03-07 |
|
[ 510 ]
|
Super-Product BCH (SP-BCH) Code for 100G and Beyond Networking
|
Broadcom Corporation
|
Q11/15
|
2014-03-07 |
|
[ 509 ]
|
G.hn, G.vdsl, G.fast : Objectives and Tools for PLC to DSL Interference Mitigation
|
Metanoia Technologies, Inc.
|
Q4/15, Q18/15
|
2014-03-07 |
|
[ 508 ]
|
G.hn: Using ACE symbols with precoding to save memory and complexity in Receiver
|
Metanoia Technologies, Inc.
|
Q18/15
|
2014-03-07 |
|
[ 507 ]
|
G.hn: Proposal to add SNR and throughput measurement tools in G.hn
|
Metanoia Technologies, Inc.
|
Q18/15
|
2014-03-07 |
|
[ 506 ]
|
G.hn: Special TXOP for IDCC / IDSW
|
Metanoia Technologies, Inc.
|
Q18/15
|
2014-03-07 |
|
[ 505 ]
|
G.hn: Comparison of the two options for Inter-Medium Bridging
|
Metanoia Technologies, Inc.
|
Q18/15
|
2014-03-07 |
|
[ 504 ]
|
Example Alternative B100G ODU Frame Format
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2014-03-07 |
|
[ 503 ]
|
Thoughts on FEC for 400G IrDI
|
Alcatel-Lucent USA Inc.
|
Q6/15, Q11/15
|
2014-03-07 |
|
[ 502 ]
|
Possible areas for B100G OTN Framing optimization
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2014-03-07 |
|
[ 501 ]
|
Possible 400G Ethernet PCS format and implications for B100G OTN framing
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2014-03-07 |
|
[ 500 ]
|
OTN B100G Framing Decisions
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2014-03-07 |
|
[ 499 ]
|
ODU SMP Lower Order 1-stage signalling
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2014-03-07 |
|
[ 498 ]
|
Clarification of clockClass table [G.8275.1]
|
Microsemi
|
Q13/15
|
2014-03-07 |
|
[ 497 ]
|
ODU SMP Proposal Status
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2014-03-07 |
|
[ 496 ]
|
T-TSC-P/T-BC-P/APTSC Model for partial timing support [G.8273.4]
|
Microsemi
|
Q13/15
|
2014-03-07 |
|
[ 495 ]
|
T-BC SyncE transient testing method [G.8273]
|
Microsemi
|
Q13/15
|
2014-03-07 |
|
[ 494 ]
|
T-BC SyncE Transient Requirement [G.8273.2]
|
Microsemi
|
Q13/15
|
2014-03-07 |
|
[ 493 ]
|
T-BC Model [G.8273.2]
|
Microsemi
|
Q13/15
|
2014-03-07 |
|
[ 492 ]
|
T-BC Applicable Interfaces [G.8273.2]
|
Microsemi
|
Q13/15
|
2014-03-07 |
|
[ 491 ]
|
Bench Results of SyncE (for use as IEEE1588/GNSS holdover) [G.827x]
|
Microsemi
|
Q13/15
|
2014-03-07 |
|
[ 490 ]
|
IPR: Ikanos Communications on IPR declarations on G.9700 and G.9701.
|
Ikanos Communications
|
Q4/15
|
2014-03-07 |
|
[ 489 ]
|
Definition of Clock Behaviour with Regards to clockClass Usage [G.8275.1]
|
Ciena Canada
|
Q13/15
|
2014-03-07 |
|
[ 488 ]
|
T-BC Clock Models [G.8273.2]
|
Ciena Canada
|
Q13/15
|
2014-03-07 |
|
[ 487 ]
|
Application code compatible with 40GBASE-ER4 in G.695
|
Ciena Canada
|
Q6/15
|
2014-03-07 |
|
[ 486 ]
|
Proposal for Update to G.977 considering 40G and 100G Coherent Systems
|
Ciena Canada
|
Q8/15
|
2014-03-07 |
|
[ 485 ]
|
Proposed changes to Recommendation G.977 for 40G and 100G systems
|
Ciena Canada
|
Q8/15
|
2014-03-07 |
|
[ 484 ]
|
Layers in Transport SDN
|
Ciena Canada
|
Q14/15, Q12/15
|
2014-03-07 |
|
[ 483 ]
|
MEF Mobile Backhaul
|
Ericsson Canada, Inc.
|
Q6/15, Q3/15, Q2/15, Q13/15, Q12/15, Q10/15
|
2014-03-07 |
|
[ 482 ]
|
Adoption of MEF technical specifications
|
Canada
|
Q10/15
|
2014-03-07 |
|
[ 481 ]
|
G9979
|
Canada
|
Q18/15
|
2014-03-07 |
|
[ 480 ]
|
G.inp: Proposed edits to help complete the VDSL LPM Amendment
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
Ikanos Communications
|
Q4/15
|
2014-03-07 |
|
[ 479 ]
|
Protection Architectures for G.metro
|
ADVA Optical Networking
,
Telefon AB - LM Ericsson
|
Q6/15
|
2014-03-07 |
|
[ 478 ]
(Rev.1-2) |
Reference diagrams for G.metro
|
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
Coriant GmbH & Co. KG
,
Telefon AB - LM Ericsson
|
Q6/15
|
2014-03-07 |
Resultados :337 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):