Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 627 ]
|
G.8263 Appendix I - Flicker/gamma equation formatting fixes
|
Microsemi
|
Q13/15
|
2014-03-10 |
|
[ 626 ]
|
G8263 Appendix I - TDEV illustrating flicker load
|
Microsemi
|
Q13/15
|
2014-03-10 |
|
[ 625 ]
|
Two-way metric Offset Max
|
Microsemi
|
Q13/15
|
2014-03-10 |
|
[ 624 ]
|
Framework for Temperature Performance
|
Microsemi
|
Q13/15
|
2014-03-10 |
|
[ 623 ]
(Rev.1) |
1-stage and 2-stage Re-definition in ODU SMP
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-03-10 |
|
[ 622 ]
|
Message Encoding Set Update for ODU SMP
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-03-10 |
|
[ 621 ]
|
1-stage ODU SMP Protocol
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-03-10 |
|
[ 620 ]
(Rev.1) |
APS Mechanisms in ODU SMP
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-03-10 |
|
[ 619 ]
|
Proposed functional models in MDSP
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-03-10 |
|
[ 618 ]
|
Interconnection solution for Ethernet linear protection in MDSP
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-03-10 |
|
[ 617 ]
|
Discussion on the scope of potential G.metro Recommendation
|
Huawei Technologies Co. Ltd.
|
Q6/15
|
2014-03-10 |
|
[ 616 ]
|
Discussion on the minimum SMSR for 100G applications in G.698.2
|
Huawei Technologies Co. Ltd.
|
Q6/15
|
2014-03-10 |
|
[ 615 ]
|
Proposal of power budget update in G.973
|
Huawei Technologies Co. Ltd.
|
Q8/15
|
2014-03-10 |
|
[ 614 ]
|
G.hn: Proposal for seamless domain merging procedure
|
Huawei Technologies Co. Ltd.
|
Q18/15
|
2014-03-10 |
|
[ 613 ]
|
G.hn: Proposal for handover procedure of SC function
|
Huawei Technologies Co. Ltd.
|
Q18/15
|
2014-03-10 |
|
[ 612 ]
|
G.hn: Text proposal for SC re-establishment procedure in G.hn
|
Huawei Technologies Co. Ltd.
|
Q18/15
|
2014-03-10 |
|
[ 611 ]
|
Spectral excursion for 100Gb/s DP-QPSK modulation format in G.698.2
|
Alcatel-Lucent France
|
Q6/15
|
2014-03-10 |
|
[ 610 ]
|
Draft New Recommendation G.8152: Protocol-neutral management information model for the MPLS-TP network element, version 0.08
|
Deutsche Telekom AG
|
Q14/15
|
2014-03-10 |
|
[ 609 ]
|
NE Phase/Time Synchronization Supply Management
|
Deutsche Telekom AG
|
Q14/15, Q13/15
|
2014-03-10 |
|
[ 608 ]
|
Comments to Recommendation G.8121 (11/2013)
|
Deutsche Telekom AG
|
Q14/15, Q10/15
|
2014-03-10 |
|
[ 607 ]
|
IPR statement.
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2014-03-10 |
|
[ 606 ]
|
Threshold Profile Management for OTN
|
Deutsche Telekom AG
|
Q14/15
|
2014-03-10 |
|
[ 605 ]
|
Proposed corrections to the performance management functions in G.874 Amd 2
|
Deutsche Telekom AG
|
Q14/15
|
2014-03-10 |
|
[ 604 ]
|
Considerations on control plane derived from G.8080 for G.ODUSMP
|
China Unicom
|
Q9/15
|
2014-03-10 |
|
[ 603 ]
|
Proposal on fundamental visor and virtualization in soft-defined transport network
|
China Unicom
|
Q14/15, Q12/15
|
2014-03-10 |
|
[ 602 ]
|
Reusing PON-ID as TWDM channel ID
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-03-10 |
|
[ 601 ]
|
T-BC Performance with/without SyncE [G.8273.2]
|
Vitesse Semiconductor Corporation
|
Q13/15
|
2014-03-10 |
|
[ 600 ]
|
Comments to Feb 2014 Q2 interim document "D33_G.989.3-Tuning-States-20140218-VZ-ZTE-HIT-MIT-OKI-NTT_r2"
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-03-10 |
|
[ 599 ]
|
G.8273.2: T-TSC Specification
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 598 ]
|
G.8273.2: 1pps Performance Requirements
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 597 ]
|
G.8273.2: Noise Generation
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 596 ]
|
G.8273 Annex A Equations
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 595 ]
|
G.8271.1: MTIE Limit for Dynamic Time Error
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 594 ]
|
G.8262: Jitter for Multilane, 40G and 100G Interfaces
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 593 ]
|
G.8260: Definitions of Dynamic Time Error and Maximum Time Error
|
Calnex Solutions Limited
|
Q13/15
|
2014-03-10 |
|
[ 592 ]
|
T-BC Time/phase noise generation [G.8273.2, G.8271.1]
|
Vitesse Semiconductor Corporation
|
Q13/15
|
2014-03-10 |
|
[ 591 ]
|
Proposal of a text of non-linear effects compensation in G.sup39
|
Fujitsu Limited
|
Q6/15
|
2014-03-10 |
|
[ 590 ]
|
Symbol Braided FEC for OTU4 & Beyond 100G Multi Vendor IaDI & Beyond 100G IrDI (Blacklink)
|
Xilinx Incorporation
|
Q6/15, Q11/15
|
2014-03-10 |
|
[ 589 ]
|
Proposed enhancements to G.671 and G.672 to accommodate flexible grid elements
|
Finisar Corporation
|
Q7/15
|
2014-03-10 |
|
[ 588 ]
|
G.hn: MPDU priority when including fragments of LLC frames
|
Marvell Semiconductor Inc.
|
Q18/15
|
2014-03-10 |
|
[ 587 ]
|
Initial measurement data for the proposed 4L1-9D1F EML application code in G.959.1
|
Finisar Corporation
|
Q6/15
|
2014-03-10 |
|
[ 586 ]
|
Proposal for time synchronization requirements
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q2/15, Q13/15
|
2014-03-10 |
|
[ 585 ]
|
Considerations of Error decorrelator for 100G and beyond FEC
|
Broadcom Corporation
,
ZTE Corporation
|
Q11/15
|
2014-03-10 |
|
[ 584 ]
|
Proposal about SMSR parameter for advanced modulation formats in ITU-T G.698.2
|
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q6/15
|
2014-03-10 |
|
[ 583 ]
|
Consideration about Spectral Excursion in G.698.2
|
ZTE Corporation
,
Ministry of Industry and Information Technology (MIIT)
|
Q6/15
|
2014-03-10 |
|
[ 582 ]
|
Proposal on B100G OTN mapping and multiplexing structure
|
KDDI Corporation
|
Q11/15
|
2014-03-10 |
|
[ 581 ]
|
Considerations about the EVM
|
China Unicom
,
ZTE Corporation
|
Q6/15
|
2014-03-10 |
|
[ 580 ]
|
Consideration about a requirement for consistency of switching action in G.mdsp
|
ZTE Corporation
|
Q9/15
|
2014-03-10 |
|
[ 579 ]
|
A proposed protection mechanism for a failure use case in G.MDSP
|
ZTE Corporation
|
Q9/15
|
2014-03-10 |
|
[ 578 ]
|
G.fast: Comments on link-state transition
|
ZTE Corporation
|
Q4/15
|
2014-03-10 |
Resultados :337 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):