Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 11 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 11  C 

UIT-T SG 11

Protocols and test specifications

Periodo de estudios 2013

Resultados :12 documentos
Contribuciones  [ Origen: Huawei Technologies Co. Ltd. ]  [ AI/Cuestión: Q5/11 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 136 ]  
 
Propose to correct some typos in the TD document 335 (Q.SBNG)     China , China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2014-06-24
[ 135 ]  
 
Propose to add signalling procedures of services configuration on the BNG for the Q.SBNG     China , China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2014-06-24
[ 134 ]  
(Rev.1) 
"Propose to advance draft Q.SBNG. and add procedures and message definitions for service route path, service combination and orchestration"     China , China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2014-06-24
[ 103 ]  
 
Propose to add signalling procedures of BNG's status and event notifications to the service platform for the Q.SBNG  
This document is also posted in Q5/11 exchange area
 
China , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2014-01-28
[ 67 ]  
 
Consideration on signalling requirements of control policy distribution related to service/user awareness and control in Q.SBNG     China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2013-10-21
[ 66 ]  
 
Consideration on signalling requirements of user information report related to service/user awareness and control in Q.SBNG     China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2013-10-21
[ 65 ]  
 
Consideration on signalling requirements of service/user awareness and control in Q.SBNG     China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2013-10-21
[ 64 ]  
 
Propose to add an Annex B to cover the scenarios and requirements of network services' configuration to the BNG to Q.SBNG     Huawei Technologies Co. Ltd.   Q5/11   2013-10-21
[ 63 ]  
 
Propose to add Annex C to cover the scenarios and requirements of BNG's event and status notification to the service platform     Huawei Technologies Co. Ltd.   Q5/11   2013-10-21
[ 62 ]  
 
Propose to add the scenarios and requirements for Services' configuration on BNG     China , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2013-10-21
[ 61 ]  
 
Propose to add the scenarios for Service route path, service combination for the Q.SBNG     China , China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2013-10-21
[ 3 ]  
(Rev.1) 
Propose a new work item on signalling requirements for flexible network service combination on BNG (Broadband Network Gateway)     China , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd.   Q5/11   2013-01-26
Resultados :12 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-9-23