Contribuciones
[ Origen: NTT ]  |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 2388 ]
|
Proposal of study items for multi-layer/multi-technology converged transport networks
|
NTT
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2012-08-29 |
|
[ 2387 ]
|
Proposal of clarification of requirements for MPLS-TP p2mp transport path
|
NTT
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2012-08-29 |
|
[ 2351 ]
|
Scope of Q2, as applies to access vs. OTN
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q2/15, Q12/15
|
2012-08-28 |
|
[ 2181 ]
|
Proposal of optical connector endface visual specifications requirement for cost effective network operation of optical systems
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q7/15
|
2012-08-27 |
|
[ 2176 ]
|
Living List of G.epon
Withdrawn: Reposted as TD817/WP1
|
Mitsubishi Electric Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q2/15
|
2012-08-27 |
|
[ 2173 ]
|
Draft document of G.epon
Withdrawn: Reposted as TD817/WP1
|
Mitsubishi Electric Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
OKI Electric Industry Company Ltd. (OKI)
|
Q2/15
|
2012-08-27 |
|
[ 2130 ]
|
Proposal for ONU registration and wavelength tuning functions required in MW-PONs with wavelength-splitter-based ODN
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q2/15
|
2012-08-27 |
|
[ 2107 ]
|
OAM configuration examples for G.supplement for G.8032
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15
|
2012-08-27 |
|
[ 2013 ]
(Rev.1) |
OLT cooperation in PON
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q2/15
|
2012-08-24 |
|
[ 2009 ]
|
Proposed appendix for L.omtl, "Information about test access module for trunk line monitoring"
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2012-08-24 |
|
[ 2008 ]
|
Proposal on draft text of Appendix II of L.dmosp
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2012-08-24 |
|
[ 2007 ]
|
Comment on proposed draft of L.dmosp
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2012-08-24 |
|
[ 2006 ]
|
Proposed modification to the draft text of Appendix in G.650.1
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2012-08-24 |
|
[ 1993 ]
|
Proposal of in-band OSNR measurement technique for polarizatio division multiplexed signal using high-speed Stokes polarimeter in G.697
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15
|
2012-08-23 |
|
[ 1964 ]
|
Proposed modification to existing Flyer "Optical Fibre and Cable"
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2012-08-20 |
|
[ 1902 ]
(Rev.1) |
Draft "multi-layer converged transport networks" and some discussion points
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q12/15
|
2011-11-22 |
|
[ 1901 ]
(Rev.1) |
Proposal of reconsideration for future planning of standardization for MPLS-TP related Recommendations
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1897 ]
(Rev.1) |
Consideration of approval of both MPLS-TP OAM Recommendations(G.8113.1 based on Ethernet and G.8113.2 based on MPLS)
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1751 ]
(Rev.1) |
Draft document of G.epon
|
Mitsubishi Electric Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
OKI Electric Industry Company Ltd. (OKI)
|
Q2/15
|
2011-11-22 |
|
[ 1718 ]
(Rev.1) |
Comments on the draft text of revised L.64
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2011-11-21 |
|
[ 1715 ]
(Rev.1) |
Proposed study plan of Question 17/15 for next study period
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2011-11-21 |
|
[ 1686 ]
(Rev.1) |
Comments and proposal on revision of G.654
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q8/15, Q5/15
|
2011-11-21 |
|
[ 1626 ]
(Rev.1) |
Proposal on draft text of Appendix I of L.dwpg
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q18/15
|
2011-11-21 |
|
[ 1625 ]
(Rev.1) |
Proposal on draft text of Appendix I of L.dmosp
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2011-11-21 |
|
[ 1560 ]
(Rev.1) |
Proposal of study point for optical submarine cable system in the next Study Period
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q8/15
|
2011-11-18 |
|
[ 1556 ]
(Rev.1) |
Information and proposal on MPI measurement
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2011-11-18 |
|
[ 1547 ]
(Rev.1) |
Proposal on Questions of Q5/15 for next study period
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2011-11-18 |
|
[ 1546 ]
(Rev.1) |
Comments and proposal on revision of G.657
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2011-11-18 |
|
[ 1532 ]
|
Cost estimation of type X and proposal of new N:1 PON protection scheme
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q2/15
|
2011-11-17 |
|
[ 1449 ]
|
Further consideration of requirements for on-demand segment monitoring in MPLS-TP
|
NTT
,
Telecom Italia
|
Q12/15, Q10/15
|
2011-02-02 |
|
[ 1448 ]
|
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP
|
NTT
|
Q12/15, Q10/15
|
2011-02-02 |
|
[ 1447 ]
|
Proposal for additional delay measurement functions in MPLS-TP OAM
|
NTT
|
Q9/15, Q14/15, Q10/15
|
2011-02-02 |
|
[ 1446 ]
|
Proposal of adding topic of Timing and Synchronization Aspects of Packet Networks in OTNT SWP
|
NTT
|
Q3/15, Q13/15
|
2011-02-02 |
|
[ 1401 ]
|
Improvement of Annex E/G.709 (40GbE/100GbE transport over OTN)
|
NTT
|
Q9/15, Q11/15
|
2011-02-01 |
|
[ 1376 ]
|
Proposed text for defining "in-profile" frames in Y.1731
|
NTT
,
NEC
|
Q10/15
|
2011-02-01 |
|
[ 1375 ]
(Rev.1) |
R-APS channels with different MAC-DA and same VID for identifying Ring-ID in G.8032
|
NTT
,
NSN
|
Q9/15
|
2011-02-01 |
|
[ 1366 ]
|
Adding dFOP-TO to G.8032
|
NSN
,
NTT
|
Q9/15
|
2011-02-01 |
|
[ 1316 ]
|
Proposal for G.epon
|
NTT
,
Mitsubishi
|
Q2/15
|
2011-02-01 |
|
[ 1284 ]
|
Proposal of subjects to be discussed regarding flexible grids
|
NTT
|
Q6/15
|
2011-01-31 |
|
[ 1270 ]
|
Proposal for OMCI in EPON
|
Mitsubishi
,
Ericsson
,
Hitachi
,
NTT
|
Q2/15
|
2011-01-31 |
|
[ 1226 ]
|
Comments on draft Recommendation L.coi
|
NTT
|
Q16/15
|
2011-01-31 |
|
[ 1225 ]
|
Draft new Recommendation L.aid "Aerial infrastructure design for optical access network"
|
NTT
|
Q18/15
|
2011-01-31 |
|
[ 1224 ]
|
Draft new Recommendation L.omtl "An optical fibre cable maintenance support, monitoring and testing system for optical fibre cable networks for trunk lines"
|
NTT
|
Q17/15
|
2011-01-31 |
|
[ 1223 ]
|
Information on MPI characteristics under various deployment conditions
|
NTT
|
Q5/15
|
2011-01-31 |
|
[ 981 ]
|
Extension of Appendix I/G.806 to include waveband switching
|
NTT
|
Q9/15
|
2010-05-20 |
|
[ 955 ]
|
R-APS channels with different MAC-DA and same VID for identifying Ring-ID in G.8032
|
NTT
|
Q9/15
|
2010-05-19 |
|
[ 954 ]
|
Proposed mechanism with DNI for end-to-end service resiliency in G.8032
|
NTT
,
NEC
|
Q9/15
|
2010-05-19 |
|
[ 944 ]
|
Proposal of extending solution for temporal and hitless pass segment monitoring and sending liaison to IETF
|
NTT
|
Q12/15, Q10/15
|
2010-05-19 |
|
[ 943 ]
|
Analyses and proposals for promoting early consent of G.tpoam
|
NTT
|
Q10/15
|
2010-05-19 |
|
[ 942 ]
|
Proposal of modification of IPG specification in GFP-T rate adaptation of full duplex Gigabit Ethernet in G.7041
|
NTT
|
Q11/15
|
2010-05-19 |
Resultados :110 documentos Resultados :
1 -
2 -
3
- Siguiente

|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):