Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Resultados :26 documentos
Contribuciones  [ Origen: Huawei ]  [ AI/Cuestión: Q6/15 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 2165 ]  
 
Further results of an alternative method for measuring in-band OSNR in G.697     China Unicom , Huawei Technologies Co. Ltd.   Q6/15   2012-08-27
[ 2164 ]  
 
Proposal for modulation format for 100 Gbit/s applications in G.698.2     Huawei Technologies Co. Ltd.   Q6/15   2012-08-27
[ 2157 ]  
(Rev.1) 
Considerations on next steps beyond 100 Gbit/s applications     China Unicom , Huawei Technologies Co. Ltd.   Q6/15, Q12/15, Q11/15   2012-08-27
[ 1900 ]  
 
Proposal for maintaining Optical Duo Binary as modulation format for 40G applications in G.698.2     China , China Mobile Communications Corporation , China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1828 ]  
(Rev.1) 
G.sdapp ongrid frequencies up&down on decision 2 of G.sdapp decision tree     Gemfire Europe Limited , Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1827 ]  
(Rev.1) 
Proposal for refining the OSNR calculation with the impact of channel-dependent variation     Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1826 ]  
(Rev.1) 
Proposal for ODB parameter values for 40G applications in G.698.2     Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1825 ]  
(Rev.1) 
Proposal for modifying wording on Flexible Grid in revised G.694.1     Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1824 ]  
(Rev.1) 
Proposal for modifying definition of OSNR in G.Sup39     Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1823 ]  
(Rev.1) 
Proposal for eye mask related criteria for DQPSK time domain skew detection in G.698.2     Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1819 ]  
(Rev.1) 
G.sdapp offgrid frequencies proposal on decision 3 of G.sdapp decision tree     Alphion Corporation , Gemfire Europe Limited , Huawei Technologies Co. Ltd. , Juniper Networks   Q6/15   2011-11-22
[ 1818 ]  
(Rev.1) 
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics     Huawei Technologies Co. Ltd.   Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15   2011-11-22
[ 1738 ]  
(Rev.1) 
On-grid frequencies up & down proposal in Decision 2 of Decision Tree     Gemfire Europe Limited , Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1502 ]  
 
Functional description and transfer parameters of multi-degree reconfigurable OADM in G.680     Huawei   Q6/15   2011-02-02
[ 1501 ]  
 
Consideration of optical non-linear limitations in G.696.1     Huawei   Q6/15   2011-02-02
[ 1374 ]  
 
Proposed Wavelength allocation and standard structure of G.sdapp     Huawei   Q6/15   2011-02-01
[ 1056 ]  
 
Proposal to include PDM-BPSK into 40G modulation formats in G.sup39     CATR , Huawei   Q6/15   2010-05-21
[ 1050 ]  
 
Proposal of suggestions on procedures to build physical impairments models for signal quality evaluation in G.680     Huawei   Q6/15   2010-05-20
[ 1049 ]  
 
Propose to add the monitoring time requirement based on application scenarios in G.697     Huawei   Q6/15   2010-05-20
[ 1047 ]  
 
Proposal on considerations of interactions of PMD and filtering effects with nonlinear effects in optical transmissions in G.680     Huawei   Q6/15   2010-05-20
[ 692 ]  
 
Proposal for OSNR parameter values at point RS for 10G/50GHz application codes in G.698.2     Huawei Technologies   Q6/15   2009-09-20
[ 691 ]  
 
Proposal for new sub-clauses into G.696.1 about mixed 10G/40G/100G transmission     Huawei Technologies   Q6/15   2009-09-20
[ 327 ]  
 
Comments on P-DPSK according to the test data     Huawei Technologies Co., Ltd.   Q6/15   2008-11-26
[ 326 ]  
 
Proposal for Optical Interface Diagnostic Monitoring for Optical Transmission System     Huawei Technologies Co., Ltd.   Q6/15   2008-11-26
[ 325 ]  
 
Optically identified wavelength in performance monitoring     Huawei Technologies Co., Ltd.   Q6/15   2008-11-26
[ 324 ]  
 
About P-DPSK receiver performance dependence on optical filter characteristics     Huawei Technologies Co., Ltd.   Q6/15   2008-11-26
Resultados :26 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-5-27