Contribuciones  |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 2390 ]
|
Optic Fiber networks in Burundi
|
Burundi
|
QALL/15
|
2012-08-29 |
|
[ 2389 ]
|
Implementation of L2.bis modes in ADSL2Plus
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4A/15
|
2012-08-29 |
|
[ 2388 ]
|
Proposal of study items for multi-layer/multi-technology converged transport networks
|
NTT
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2012-08-29 |
|
[ 2387 ]
|
Proposal of clarification of requirements for MPLS-TP p2mp transport path
|
NTT
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2012-08-29 |
|
[ 2386 ]
|
10 G signal transmission in seeded DWDM system
|
LG-Ericsson
|
Q6/15
|
2012-08-29 |
|
[ 2385 ]
|
Comparison of proposed low cost DWDM system
|
LG-Ericsson
|
Q6/15
|
2012-08-29 |
|
[ 2384 ]
(Rev.1) |
Boundary clock in networks and simulations
|
Tellabs Oy
|
Q13/15
|
2012-08-28 |
|
[ 2383 ]
(Rev.1) |
Boundary clock simulation model
|
Tellabs Oy
|
Q13/15
|
2012-08-28 |
|
[ 2382 ]
|
Not used
Duplicate of C-2383
|
N/A (no se aplica)
|
|
2012-08-28 |
|
[ 2381 ]
(Rev.1) |
G.8265.1 supported duration of negotiated service
|
Tellabs Oy
|
Q13/15
|
2012-08-28 |
|
[ 2380 ]
|
G.fast: Minimum Duration of Transmission Opportunity
|
Huawei Technologies Co. Ltd.
|
Q4A/15
|
2012-08-28 |
|
[ 2379 ]
|
G.hn: Adding pre-defined BATs with bit loading up to 30MHz for an Amendment to G.9960
|
Sigma Designs Israel S.D.I Ltd.
|
Q4B/15
|
2012-08-28 |
|
[ 2378 ]
|
Reversion fails at simultaneous clear SFs in PSC based MPLS-TP linear protection
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2012-08-28 |
|
[ 2377 ]
|
G.fast: Per-Frame MAP
|
Sckipio Technologies S.I. Ltd.
|
Q4A/15
|
2012-08-28 |
|
[ 2376 ]
|
Proposal for determined Amendment 1 of G.9955 main body : EVM Evaluation
|
Yitran Communications Ltd.
|
Q4C/15
|
2012-08-28 |
|
[ 2375 ]
|
Cooperation of G.781 and BMCA in telecom profile for time
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2012-08-28 |
|
[ 2374 ]
|
PDV test pattern for G.8263
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2012-08-28 |
|
[ 2373 ]
|
Proposal for G.epon specific managed entities
|
Mitsubishi Electric Corporation
,
OKI Electric Industry Company Ltd. (OKI)
|
Q2/15
|
2012-08-28 |
|
[ 2372 ]
|
Proposal for G.epon related managed entities
|
Mitsubishi Electric Corporation
,
OKI Electric Industry Company Ltd. (OKI)
|
Q2/15
|
2012-08-28 |
|
[ 2371 ]
|
Incorporation of agreed changes in G.8121.2
|
Cisco Systems, Inc.
|
Q9/15
|
2012-08-28 |
|
[ 2370 ]
|
Comparison of protection interworking architectures using distributed G.8031
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2012-08-28 |
|
[ 2369 ]
|
Coordination of G.698.2-related work within SG15
|
Deutsche Telekom AG
|
Q6/15
|
2012-08-28 |
|
[ 2368 ]
|
Low-complexity DWDM system with self-seeded optical transceivers
|
Futurewei Technologies US R&D Center
|
Q6/15, Q2/15, Q12/15
|
2012-08-28 |
|
[ 2367 ]
|
Proposal of inter-OLT communication in G.multi
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2012-08-28 |
|
[ 2366 ]
|
Definition of the "Tx power difference between polarizations" for G.698.2
|
Deutsche Telekom AG
|
Q6/15
|
2012-08-28 |
|
[ 2365 ]
|
Discussion on G.poc upstream transmission
|
Futurewei Technologies US R&D Center
|
Q4A/15, Q2/15, Q1/15
|
2012-08-28 |
|
[ 2364 ]
|
Comments on draft revised Recommendation G.872
|
Deutsche Telekom AG
|
Q12/15
|
2012-08-28 |
|
[ 2363 ]
|
2.5G upstream GPON discussion
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2012-08-28 |
|
[ 2362 ]
|
Scope of G.8275.1
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2361 ]
|
Review of G.8272 latest draft
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2360 ]
|
G.8272: New Appendix describing possible PRTC locations
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2359 ]
|
Results of PDV tolerance testing using sinusoidal patterns as defined in G.8263-Testing
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2358 ]
|
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2357 ]
|
Development of a new Appendix of G.8261.1 on PDV generation testing
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2356 ]
|
G.fast: Dynamic BW allocation
|
Sckipio Technologies S.I. Ltd.
|
Q4A/15
|
2012-08-28 |
|
[ 2355 ]
|
G.fast: Low Complexity FFT/IFFT Scheme
|
Telefon AB - LM Ericsson
|
Q4A/15
|
2012-08-28 |
|
[ 2354 ]
|
G.fast: New cable model for wiring type B05a, CAD55
|
Telefon AB - LM Ericsson
|
Q4A/15
|
2012-08-28 |
|
[ 2353 ]
|
G.fast: Are you willing to give up 6dB of performance gain???
|
Sckipio Technologies S.I. Ltd.
|
Q4A/15
|
2012-08-28 |
|
[ 2352 ]
|
G.fast: Updated measurements and modelling of CAD55 cable
|
Telefon AB - LM Ericsson
|
Q4A/15
|
2012-08-28 |
|
[ 2351 ]
|
Scope of Q2, as applies to access vs. OTN
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q2/15, Q12/15
|
2012-08-28 |
|
[ 2350 ]
|
G.fast: On the adaptation of the G.998.4 DTU format to G.fast
|
Sckipio Technologies S.I. Ltd.
|
Q4A/15
|
2012-08-28 |
|
[ 2349 ]
(Rev.1) |
Modulation format for 100G in G.698.2
|
Deutsche Telekom AG
|
Q6/15
|
2012-08-28 |
|
[ 2348 ]
|
G.fast: Principle Operations Of Layered Modulation
|
Alcatel-Lucent Bell N.V.
|
Q4A/15
|
2012-08-28 |
|
[ 2347 ]
|
G.gen: VDSL: G.ploam: Corrigendum on "INPMIN-ROC"
|
Alcatel-Lucent Bell N.V.
|
Q4A/15
|
2012-08-28 |
|
[ 2346 ]
|
VDSL: Amendment of Receiver Initiated SRA following an SOS procedure
|
Alcatel-Lucent Bell N.V.
|
Q4A/15
|
2012-08-28 |
|
[ 2345 ]
|
G.gen: VDSL: G.ploam: Reporting parameter "Actual AELE-MODE"
|
Alcatel-Lucent Bell N.V.
|
Q4A/15
|
2012-08-28 |
|
[ 2344 ]
|
Consequence of floor delay changes under tight PLL bandwidth
|
RAD Data Communications, Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2343 ]
|
The TVL of Signaling message
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2342 ]
|
Proposal to finalize a Recommendation specifying APS based MPLS-TP linear protection for PTN applications
|
Italy
|
Q9/15, Q14/15, Q10/15
|
2012-08-28 |
|
[ 2341 ]
|
The effect of MAC control pause operation for PTP synchronization
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
Resultados :2390 documentos Resultados :
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
- Siguiente

|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):