Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Reunión 2012-09-10 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C (2012-09-10) 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Reunión  del 2012-09-10 al 2012-09-21

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Resultados :36 documentos
Contribuciones  [ AI/Cuestión: Q2/15 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 2373 ]  
 
Proposal for G.epon specific managed entities     Mitsubishi Electric Corporation , OKI Electric Industry Company Ltd. (OKI)   Q2/15   2012-08-28
[ 2372 ]  
 
Proposal for G.epon related managed entities     Mitsubishi Electric Corporation , OKI Electric Industry Company Ltd. (OKI)   Q2/15   2012-08-28
[ 2368 ]  
 
Low-complexity DWDM system with self-seeded optical transceivers     Futurewei Technologies US R&D Center   Q6/15, Q2/15, Q12/15   2012-08-28
[ 2367 ]  
 
Proposal of inter-OLT communication in G.multi     Futurewei Technologies US R&D Center   Q2/15   2012-08-28
[ 2365 ]  
 
Discussion on G.poc upstream transmission     Futurewei Technologies US R&D Center   Q4A/15, Q2/15, Q1/15   2012-08-28
[ 2363 ]  
 
2.5G upstream GPON discussion     Futurewei Technologies US R&D Center   Q2/15   2012-08-28
[ 2351 ]  
 
Scope of Q2, as applies to access vs. OTN     British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , Futurewei Technologies US R&D Center , Nippon Telegraph and Telephone Corporation (NTT)   Q6/15, Q2/15, Q12/15   2012-08-28
[ 2334 ]  
(Rev.1) 
Proposal for inclusion of PtP WDM use cases in G.ngpon2.1     ADVA Optical Networking , Ericsson, Inc. , France Télécom Orange , Nokia Siemens Networks GmbH & Co. KG   Q2/15   2012-08-28
[ 2308 ]  
 
Proposal for inclusion of Performance Measurement Methods of Advanced Modulation Formats in G.ngpon2.2     Electronics and Telecommunications Research Institute (ETRI) , Nokia Siemens Networks GmbH & Co. KG   Q2/15   2012-08-28
[ 2305 ]  
 
Proposal for inclusion of Advanced Modulation Formats in G.ngpon2.2     Electronics and Telecommunications Research Institute (ETRI) , Nokia Siemens Networks GmbH & Co. KG   Q2/15   2012-08-28
[ 2300 ]  
 
Proposal to add fixed wavelength assignment in physical layer in G.multi     Electronics and Telecommunications Research Institute (ETRI)   Q2/15   2012-08-28
[ 2298 ]  
(Rev.1) 
Proposal to add some parameter definitions for G.ng-pon2.2     Electronics and Telecommunications Research Institute (ETRI)   Q2/15   2012-08-28
[ 2296 ]  
 
Proposal to add O-OFDM as another line code option in the Annex A of the G.ngpon2.2     Electronics and Telecommunications Research Institute (ETRI) , Nokia Siemens Networks GmbH & Co. KG   Q2/15   2012-08-28
[ 2263 ]  
 
Propose a new equipment model of converged access and transport node     ZTE Corporation   Q9/15, Q2/15, Q12/15   2012-08-28
[ 2262 ]  
(Rev.1) 
Proposal to study a converged access and transport network     ZTE Corporation   Q2/15, Q12/15   2012-08-28
[ 2248 ]  
 
Proposal for G.multi architecture     FiberHome Technologies Group   Q2/15   2012-08-28
[ 2247 ]  
(Rev.1) 
Clarification to various types of MW-PON systems in G.multi Scope     FiberHome Technologies Group   Q2/15   2012-08-28
[ 2246 ]  
+Corr.1 
Serial data acquisition by XGPON     FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q2/15   2012-08-28
[ 2227 ]  
 
General discussion on wavelength tuning for G.multi     ZTE Corporation   Q2/15   2012-08-28
[ 2226 ]  
 
General discussion on registration for G.multi     ZTE Corporation   Q2/15   2012-08-28
[ 2223 ]  
 
Proposal for NG-PON2 TC layer standardization     ZTE Corporation   Q2/15   2012-08-28
[ 2221 ]  
 
TC layer framing in TWDM PON     ZTE Corporation   Q2/15   2012-08-28
[ 2218 ]  
 
Unified Power Management for PON systems     ZTE Corporation   Q2/15   2012-08-28
[ 2176 ]  
 
Living List of G.epon  
Withdrawn: Reposted as TD817/WP1
 
Mitsubishi Electric Corporation , Nippon Telegraph and Telephone Corporation (NTT)   Q2/15   2012-08-27
[ 2173 ]  
 
Draft document of G.epon  
Withdrawn: Reposted as TD817/WP1
 
Mitsubishi Electric Corporation , Nippon Telegraph and Telephone Corporation (NTT) , OKI Electric Industry Company Ltd. (OKI)   Q2/15   2012-08-27
[ 2130 ]  
 
Proposal for ONU registration and wavelength tuning functions required in MW-PONs with wavelength-splitter-based ODN     Nippon Telegraph and Telephone Corporation (NTT)   Q2/15   2012-08-27
[ 2120 ]  
 
Transport of wavelength information via new PLOAM message for enabling ONU transfer in MW-PON system     Alcatel-Lucent Shanghai Bell   Q2/15   2012-08-27
[ 2118 ]  
(Rev.1) 
Strong Authentication and Key Management for XG-PON1     Alcatel-Lucent Shanghai Bell , China Mobile Communications Corporation , China Unicom , China   Q2/15   2012-08-27
[ 2111 ]  
+Corr.1 
Proposal to G.multi: wavelength management channel choice and announcement in Stacked-PON     FiberHome Technologies Group   Q2/15   2012-08-27
[ 2110 ]  
+Corr.1 
Proposal to G.multi: the framework of transmission convergence layer function in CO     FiberHome Technologies Group   Q2/15   2012-08-27
[ 2109 ]  
+Corr.1 
Proposal on supporting OTDR function for G.984.5     FiberHome Technologies Group   Q2/15   2012-08-27
[ 2108 ]  
+Corr.1 
Proposal on an asymmetric wavelength number physical architechture for G.ngpon2.2     FiberHome Technologies Group   Q2/15   2012-08-27
[ 2013 ]  
(Rev.1) 
OLT cooperation in PON     Nippon Telegraph and Telephone Corporation (NTT)   Q2/15   2012-08-24
[ 2012 ]  
 
Not used  
Duplicate of C-2263
 
N/A (no se aplica)   Q2/15   2012-08-24
[ 2011 ]  
 
No used  
Duplicate of C-2262
 
N/A (no se aplica)   Q2/15   2012-08-24
[ 1944 ]  
 
Proposed changes to facilitate future approval of draft new Recommendation G.9980 (according to WTSA-08 Resolution 1, Section 9.5.5)     Germany   Q4C/15, Q4B/15, Q4A/15, Q2/15, Q1/15   2012-07-13
Resultados :36 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-4-26