Contribuciones
[ Origen: ZTE Corporation ]  |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 1841 ]
|
Proposal of RS422 1PPS time/phase as a time measurement interface
|
China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q13/15
|
2011-11-22 |
|
[ 1802 ]
(Rev.1) |
Progress on ICCP extension for the MSP application
|
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1800 ]
(Rev.1) |
Propose to improve the throughput measurement defined in Y.1731
|
China Mobile Communications Corporation
,
China Unicom
,
ZTE Corporation
|
Q10/15
|
2011-11-22 |
|
[ 1799 ]
(Rev.1) |
Comments and proposals on G.8131.1 text
|
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1797 ]
(Rev.1) |
Proposals on the conditions for dLOC and dUNP defined in G.8021
|
China
,
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1777 ]
(Rev.1) |
Suggestion to improve existing CBTS back-off rules
|
ZTE Corporation
|
Q4/15
|
2011-11-22 |
|
[ 1766 ]
(Rev.1) |
Proposed RFID tag experience for ODN in China
|
ZTE Corporation
|
Q17/15
|
2011-11-22 |
|
[ 1765 ]
(Rev.1) |
G.fast: Reverse powering over twisted pair
|
ZTE Corporation
|
Q4/15
|
2011-11-22 |
|
[ 1764 ]
(Rev.1) |
A protection switching method by re-using EqD values in GPON or XG-PON1
|
ZTE Corporation
|
Q2/15
|
2011-11-22 |
|
[ 1763 ]
(Rev.1) |
Consideration on the use of a new Ethertype for MPLS-TP
|
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1762 ]
(Rev.1) |
OTN SMP
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1761 ]
(Rev.1) |
Consideration on scope of OTN SMP
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1760 ]
(Rev.1) |
One service with multiple protection paths in SMP
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1759 ]
(Rev.1) |
Race conditions in G.smp
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1758 ]
(Rev.1) |
Automatic switch in G.smp
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1757 ]
(Rev.1) |
Consideration on the adaptation of OTU5 over multichannel parallel interfaces
|
China Unicom
,
ZTE Corporation
|
Q11/15
|
2011-11-22 |
|
[ 1754 ]
(Rev.1) |
Proposal of new recommendation on multi layer converged transport network (G.mlctn)
|
ZTE Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
|
2011-11-22 |
|
[ 1753 ]
(Rev.1) |
Draft of multi layer converged network informative document
|
ZTE Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
|
2011-11-22 |
|
[ 1748 ]
(Rev.1) |
Consideration on the node numbers and transmission distance of OTN SRP
|
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1747 ]
(Rev.1) |
Proposed text for the description of Extra Traffic in Draft Rec. G.873.2
|
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1745 ]
(Rev.1) |
Parameter Definitions of delay line interferometer of DQPSK in G.671
|
ZTE Corporation
|
Q7/15
|
2011-11-22 |
|
[ 1744 ]
(Rev.1) |
Requirement for communication latency, latency variation and loss as traffic engineering performance metrics in ASON
|
ZTE Corporation
|
Q14/15, Q12/15
|
2011-11-22 |
|
[ 1743 ]
(Rev.1-2) |
Considerations on beyond 100G transmission for G.Sup 39
|
China Unicom
,
ZTE Corporation
|
Q6/15
|
2011-11-22 |
|
[ 1742 ]
(Rev.1) |
Proposal for studying constellation in G.Sup39
|
ZTE Corporation
|
Q6/15
|
2011-11-22 |
|
[ 1741 ]
(Rev.1) |
Considerations on EVM in G.698.2
|
ZTE Corporation
|
Q6/15
|
2011-11-22 |
|
[ 1690 ]
(Rev.1) |
Proposal to study the convergence of PON and transport network in the next study period
|
ZTE Corporation
|
Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1689 ]
(Rev.1) |
Proposal to study the convergence of optical and packet in the next study period
|
ZTE Corporation
|
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2011-11-21 |
|
[ 1688 ]
(Rev.1) |
Proposal for joint discussion about flexible grid network
|
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2011-11-21 |
|
[ 1676 ]
(Rev.1) |
Noises Introduced by Boundary Clocks
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1674 ]
(Rev.1) |
G.8265 and G.8265.1 Editorial change
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1673 ]
(Rev.1) |
Time transient build out and time offset response
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1672 ]
(Rev.1) |
The mixed SSM_PTP application for frequency synchronization
|
China
,
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1667 ]
(Rev.1) |
Proposal of the combination of jumping and sliding window
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1662 ]
(Rev.1) |
Comments on G.8260 latest draft
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1660 ]
(Rev.1) |
Proposal of 1pps as an external interface of PEC
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1659 ]
(Rev.1) |
Proposals on the validation of the PTP master
|
China
,
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1657 ]
(Rev.1) |
Proposals on the factors used for the master selection of time/phase sync
|
China
,
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1655 ]
(Rev.1) |
Analysis of selection window and oscillator
|
China
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1654 ]
(Rev.1) |
Analysis about timestamp process of PTP event packet
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1620 ]
(Rev.1) |
Proposal on the 1588v2 over OTN by OSC
|
FiberHome Technologies Group
,
ZTE Corporation
|
Q13/15, Q11/15
|
2011-11-19 |
|
[ 1617 ]
|
Withdrawn: Duplicate of C-1620
Withdrawn
|
FiberHome Technologies Group
,
ZTE Corporation
|
Q13/15, Q11/15
|
2011-11-19 |
|
[ 1562 ]
(Rev.1-2) |
Proposed OAM management added to the new draft recommendation G.8152
|
ZTE Corporation
|
Q14/15
|
2011-11-18 |
|
[ 1559 ]
(Rev.1) |
Proposed text about alarm management added to the new draft recommendation G.8152
|
ZTE Corporation
|
Q14/15
|
2011-11-18 |
|
[ 1558 ]
(Rev.1) |
Proposed text about performance management added to the new draft recommendation G.8152
|
ZTE Corporation
|
Q14/15
|
2011-11-18 |
|
[ 1557 ]
(Rev.1) |
Proposed text about the pseudo-wire(PW) added to the new draft recommendation G8152
|
ZTE Corporation
|
Q14/15
|
2011-11-18 |
|
[ 1549 ]
(Rev.1) |
The support of XGPON for serial devices in the smart grid
|
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q2/15
|
2011-11-18 |
|
[ 1548 ]
|
Withdrawn, duplicate of C-1549
Withdrawn
|
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q2/15
|
2011-11-18 |
Resultados :47 documentos
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):