Contribuciones
[ AI/Cuestión: Q4/15 ] |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 1402 ]
|
G.gen: G.hn: G.vdsl: RF Ingress above 30 MHz - For Information
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1393 ]
|
G.INP: VDSL2 will require retransmission upstream
|
BT
|
Q4/15
|
2011-02-01 |
|
[ 1390 ]
|
G.vdsl: Operator control of transitions out of showtime (Reinit policies)
|
Swisscom
|
Q4/15
|
2011-02-01 |
|
[ 1381 ]
|
Proposed Working Text for Time-of-Day Transport in VDSL2 per Agreements Reached at the January 17-20, 2011 interim Q4/15 meeting
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-02-01 |
|
[ 1380 ]
|
Time of Day transport over VDSL2 link
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-02-01 |
|
[ 1379 ]
|
GPLOAM: LOSS-L, LOSS-LFE and UAS
|
France Telecom Orange
|
Q4/15
|
2011-02-01 |
|
[ 1363 ]
|
G:hn : Proposed new appendix to G.hn-MIMO Draft Recommendation
|
Panasonic
|
Q4/15
|
2011-02-01 |
|
[ 1359 ]
(Rev.1) |
Enhancements of the supported G.inp rates for VDSL2 lines operating in conjunction with vectoring
|
Telecom Italia
,
France Telecom Orange
,
Swisscom
,
TNO
|
Q4/15
|
2011-02-01 |
|
[ 1338 ]
|
Proposals for eoc transport of timing data for ToD clock recovery at the CPE
|
Lantiq
|
Q4/15
|
2011-02-01 |
|
[ 1278 ]
|
G.vdsl: Support for text proposal for Attainable Net Data rate
|
Swisscom
|
Q4/15
|
2011-01-31 |
|
[ 1276 ]
|
G.vdsl: Support for text proposal for Short Interruption Monitoring
|
Swisscom
|
Q4/15
|
2011-01-31 |
|
[ 1274 ]
|
G.vdsl: Support for Alternative Electrical Length Estimation Method
|
Swisscom
|
Q4/15
|
2011-01-31 |
|
[ 1251 ]
|
G.gen: New Recommendations for Next-Generation DSL Technologies
|
MIIT China
,
China Unicom
|
Q4/15
|
2011-01-31 |
|
[ 1242 ]
|
G.gen, G.vdsl: An Introduction to Advances in Multi-Wire Transmission Technologies
|
Huawei
|
Q4/15
|
2011-01-31 |
|
[ 1241 ]
|
G.vdsl: Updated Working Text for Distribution of Time-of-Day over VDSL2 Links
|
Huawei
,
China MIIT
|
Q4/15
|
2011-01-31 |
|
[ 1240 ]
|
G.vector: A Comment on G.993.5 (04/2010)
|
Huawei
|
Q4/15
|
2011-01-31 |
|
[ 1229 ]
|
G.hn: Proposal for neighbour domain co-ordination
|
Metanoia Technologies
|
Q4/15
|
2011-01-31 |
|
[ 1228 ]
|
G.inp: Proposed clarification to retransmission return channel
|
Metanoia Technologies
|
Q4/15
|
2011-01-31 |
|
[ 1157 ]
|
G.ploam: Proposed Text for Upstream Xlog Test Parameter
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1156 ]
|
G.vector: Proposal for Upstream Xlog Test Parameter for G.vector
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1155 ]
|
G.hnem: G.hnem management
|
ASSIA
,
AT&T
,
Aware
,
Maxim Integrated Product
,
Texas Instruments
|
Q4/15
|
2011-01-31 |
|
[ 1154 ]
|
G.Gen, G.hx, G.cx: G.hn and G.cx management
|
ASSIA
,
AT&T
,
Aware
,
Marvell Semiconductor
|
Q4/15
|
2011-01-31 |
|
[ 1153 ]
|
G.hn: Time-Varying Broadband Powerline (BPL) Interference into VDSL2
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1152 ]
|
G.hn: Broadband Powerline (BPL) Interference into VDSL2 on Drop Lines: Measurements and Analyses
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1150 ]
|
G.inp: Update to G.inp working text on OLR transition time with VDSL2
|
Ikanos
|
Q4/15
|
2011-01-30 |
|
[ 1149 ]
|
G.INP: Proposed messages for SRA in ADSL mode
|
Broadcom
,
Ikanos
|
Q4/15
|
2011-01-30 |
|
[ 1148 ]
|
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"
|
AT&T
|
Q4/15
|
2011-01-30 |
|
[ 1147 ]
(Rev.1) |
G.vdsl: Framework for sending t1t4 timestamp messages in eoc for ToD phase synchronization
|
Ikanos
|
Q4/15
|
2011-01-30 |
Resultados :78 documentos Resultados :
Anterior -
1 -
2
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):