Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Reunión 2010-05-31 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C (2010-05-31) 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Reunión  del 2010-05-31 al 2010-06-11

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Resultados :352 documentos
Resultados :  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1099 ]  
 
Proposal to specify an transport Ethernet NNI in G.8012     Deutsche Telekom   Q10/15   2010-05-24
[ 1098 ]  
 
Optional metro FEC for OTU4     Deutsche Telekom   Q11/15   2010-05-24
[ 1097 ]  
 
ODUflex resizing and multi-carrier applications     Deutsche Telekom   Q12/15, Q11/15   2010-05-24
[ 1096 ]  
 
VDSL: Time of Day and Analog Channel Delay     ASSIA   Q4/15   2010-05-24
[ 1095 ]  
 
OMCI for Configuring ATM and Ethernet pseudowire     Huawei   Q2/15   2010-05-21
[ 1094 ]  
 
The revised edition of proposed applications in G.959.1     China Unicom Network Communications Group Company   Q6/15   2010-05-21
[ 1093 ]  
 
Revised draft of Recommendation L.teib "Optical cabling shared with multiple operators in buildings"     France Télécom   Q16/15   2010-05-21
[ 1092 ]  
 
Proposal of PTN Equipment Types     CMCC , Huawei   Q9/15   2010-05-21
[ 1091 ]  
 
Proposal on state transition in G.8031     Huawei   Q9/15   2010-05-21
[ 1090 ]  
 
SD triggered protection switching in G.8031     CATR , Huawei   Q9/15   2010-05-21
[ 1089 ]  
 
Proposal on linear protection in G.ptneq     Huawei   Q9/15   2010-05-21
[ 1088 ]  
 
Example of ACL-SNCG/I application in adaptive bandwidth network scenario     Huawei   Q9/15   2010-05-21
[ 1087 ]  
 
Proposed work items on adaptive bandwidth in G.8031     Huawei   Q9/15   2010-05-21
[ 1086 ]  
 
Proposal text on ACL-SNCG/I for adaptive bandwidth in G.808.1     Huawei   Q9/15   2010-05-21
[ 1085 ]  
 
Proposed text for Shared Mesh Protection     Telefonica Investigacion y Desarrollo , Huawei   Q9/15   2010-05-21
[ 1084 ]  
 
Discussion on the state machine model for gsmp     Telefonica Investigacion y Desarrollo , Huawei   Q9/15   2010-05-21
[ 1083 ]  
 
Proposal of the architecture of gsmp     Telefonica Investigacion y Desarrollo , China Unicom , Huawei   Q9/15   2010-05-21
[ 1082 ]  
 
Discussion on APS of Shared Mesh Protection     Telefonica Investigacion y Desarrollo , China Unicom , Huawei   Q9/15   2010-05-21
[ 1081 ]  
 
The proposal of deep sleep mode for G.987.3: ONU discontinuous reception     FiberHome   Q2/15   2010-05-21
[ 1080 ]  
 
TC layer modification for XGPON OLT communication with GPON ONU     FiberHome   Q2/15   2010-05-21
[ 1079 ]  
 
Route Query as used by RC federations with Multi-RC     FiberHome   Q14/15   2010-05-21
[ 1078 ]  
 
Revise the misleading expression of "end-to-end path"     FiberHome   Q14/15   2010-05-21
[ 1077 ]  
 
Proposals about PM Thresholds and Traffic Management in G.8151/Y.1374     Fiberhome   Q14/15   2010-05-21
[ 1076 ]  
 
Proposals about Management of Ethernet Service OAM for G.8152/Y.1375     Fiberhome   Q14/15   2010-05-21
[ 1075 ]  
 
Policy-management interface in route query operation     FiberHome   Q14/15   2010-05-21
[ 1074 ]  
 
Considerations on Doze mode of power saving for G.987.3     FiberHome   Q2/15   2010-05-21
[ 1073 ]  
 
Chinese experience for L.cda optical fibre cables for drop applications     Fiberhome , MIIT   Q16/15   2010-05-21
[ 1072 ]  
 
Backward Recursive Routing using Route Query Interface     FiberHome   Q14/15   2010-05-21
[ 1071 ]  
 
A new Migration mode from GPON to XG-PON     FiberHome   Q2/15   2010-05-21
[ 1070 ]  
 
1588v2 transmission by OSC over OTN     FiberHome , CATR , ZTE   Q13/15, Q11/15   2010-05-21
[ 1069 ]  
 
The proposal of deep sleep mode for G.987.3: Random Access Channel     FiberHome   Q2/15   2010-05-21
[ 1068 ]  
 
Synchronization Requirement in OTN     CMCC   Q13/15, Q11/15   2010-05-21
[ 1067 ]  
 
GPS timing receiver characterization     Symmetricom , CATR , CMCC   Q13/15, Q11/15   2010-05-21
[ 1066 ]  
 
Analysis of time synchronization performance using PTP in hybrid transport network     CMCC , CATR , ZTE   Q13/15, Q11/15   2010-05-21
[ 1065 ]  
 
Proposal of accelerating MTIE and TDEV mask study for time synchronization     CMCC , CATR , Huawei , ZTE   Q13/15   2010-05-21
[ 1064 ]  
 
Proposal of research on link asymmetry compensation for PTP     CMCC, ZTE, CATR   Q13/15   2010-05-21
[ 1063 ]  
 
Network limits reference model for time sync accuracy     CMCC , ZTE   Q13/15   2010-05-21
[ 1062 ]  
 
Requirements for practical test setup and procedures specification for Measuring Arrangement to assess the degree of unbalance about earth     CATR   Q15/15   2010-05-21
[ 1061 ]  
 
Proposal of revising for SSM message delay description in G.8264     CATR   Q13/15   2010-05-21
[ 1060 ]  
 
Objectives and Requirements for G.827x Recommendations     CATR , Huawei   Q13/15   2010-05-21
[ 1059 ]  
 
Functionality proposals about MPLS-TP OAM toolsets in G.tpoam     CATR   Q10/15   2010-05-21
[ 1058 ]  
 
Proposals about MPLS-TP OAM mechanisms     MIIT   Q10/15   2010-05-21
[ 1057 ]  
 
Some consideration with 40G intra-office interface parameters     CATR   Q6/15   2010-05-21
[ 1056 ]  
 
Proposal to include PDM-BPSK into 40G modulation formats in G.sup39     CATR , Huawei   Q6/15   2010-05-21
[ 1055 ]  
 
40G application code for G.698.2     CATR   Q6/15   2010-05-21
[ 1054 ]  
 
Proposal of adding new TR-069 Management Server ME to G.988     MIIT   Q2/15   2010-05-21
[ 1053 ]  
 
Comments in response to NTT&CLPAJ contributions to revise G.650.1     MIIT   Q5/15   2010-05-21
[ 1052 ]  
 
Comments in response to Draka contributions to revise G.650.1     MIIT   Q5/15   2010-05-21
[ 1051 ]  
 
Proposal on adding bandwidth degradation message in Y.1731     Huawei   Q10/15   2010-05-20
[ 1050 ]  
 
Proposal of suggestions on procedures to build physical impairments models for signal quality evaluation in G.680     Huawei   Q6/15   2010-05-20
Resultados :352 documentos
Resultados :  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-4-27