Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Reunión 2009-09-28 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C (2009-09-28) 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Reunión  del 2009-09-28 al 2009-10-09

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-05-15  2008-12-01 

Resultados :38 documentos
Contribuciones  [ AI/Cuestión: Q11/15 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 625 ]  
 
OTU4 FEC for metro distance     Deutsche Telekom   Q6/15, Q11/15   2009-09-20
[ 624 ]  
 
Naming of OTN interfaces in G.709     Deutsche Telekom   Q6/15, Q11/15   2009-09-20
[ 623 ]  
 
Network requirement of G.709 interfaces used for Black Link applications.     Deutsche Telekom   Q6/15, Q11/15   2009-09-20
[ 622 ]  
 
Experimental demonstration of black-link applications     Deutsche Telekom   Q6/15, Q11/15   2009-09-20
[ 621 ]  
 
Consideration on ODUflex resizing     Deutsche Telekom   Q11/15   2009-09-20
[ 618 ]  
 
Proposal for mapping of client signals over LO OPU4     ETRI   Q11/15   2009-09-20
[ 617 ]  
 
Comments on OTM-0.mvn in draft revised G.709 v3.4     ETRI   Q11/15   2009-09-20
[ 589 ]  
 
Proposal of Additional PT     ZTE Corporation   Q11/15   2009-09-18
[ 586 ]  
 
Consideration on ODUflex resizing     ZTE Corporation   Q14/15, Q12/15, Q11/15   2009-09-18
[ 585 ]  
 
Consideration on fast OPUk Client Signal Fail (CSF)     ZTE Corporation , CMCC , NSN   Q11/15   2009-09-18
[ 577 ]  
 
OTUk (k=3, 4) multi-channel parallel transport considering FEC     NTT   Q11/15   2009-09-18
[ 572 ]  
 
ODUflex hitless resizing method     Huawei Technologies , China Mobile Communications Corp   Q9/15, Q11/15   2009-09-18
[ 517 ]  
 
Applications requiring 2 stages of ODU multiplexing     Tellabs Oy   Q11/15   2009-09-18
[ 515 ]  
 
Clarification of external ODU in clause 7/G.709     Tellabs Oy   Q11/15   2009-09-18
[ 513 ]  
 
Proposed clarification regarding GFP-F mappings for 10G Ethernet     Tellabs Oy   Q11/15   2009-09-18
[ 505 ]  
 
Initial Analysis of STM-1 Client Jitter and Wander Accumulation over OTN Islands     Huawei Technologies   Q13/15, Q11/15   2009-09-17
[ 504 ]  
 
Initial Analysis of CPRI Client Jitter and Wander Accumulation over OTN islands     Huawei Technologies   Q13/15, Q11/15   2009-09-17
[ 502 ]  
 
1 Gbit/s Ethernet Client Wander Accumulation in the Presence of Input Noise and Wide-band Jitter Accumulation, over OTN Islands     Huawei Technologies   Q13/15, Q11/15   2009-09-17
[ 501 ]  
 
Initial Development of Ethernet and SDH Input Noise Models for OTN Transport Jitter and Wander Accumulation Analyses     Huawei Technologies   Q13/15, Q11/15   2009-09-17
[ 472 ]  
 
Requirement of Embedded Latency Measurement in OTN Networks     China Telecom , CATR , China Unicom , CMCC   Q11/15   2009-09-16
[ 471 ]  
 
CPRI over OTN requirement     China Telecom , Huawei   Q11/15   2009-09-16
[ 465 ]  
 
Comments on Draft revised G.709 (TD95/Plen)     Fujitsu   Q11/15   2009-09-16
[ 464 ]  
 
Proposed further clarification on Draft revised G.709 (TD95/Plen)     Fujitsu   Q11/15   2009-09-16
[ 452 ]  
 
Transfer delay for FC over OTN     Huawei Technologies   Q11/15   2009-09-16
[ 441 ]  
 
GPON over OTN mapping     Huawei Technologies , China Mobile Communications Corporation , PMC-Sierra   Q2/15, Q11/15   2009-09-16
[ 438 ]  
 
Proposal to specify OCh/OTUkV_A with OTUk_CP     Huawei Technologies   Q9/15, Q11/15   2009-09-16
[ 437 ]  
 
Multi-vendor demarcation in the OTN     Huawei Technologies   Q9/15, Q11/15   2009-09-16
[ 436 ]  
 
LO and HO ODU view points and NNIs     Huawei Technologies   Q9/15, Q11/15   2009-09-16
[ 433 ]  
 
Multi-lane STM-256     AT&T   Q11/15   2009-09-16
[ 431 ]  
 
G.709 "Black Link" OTM-1r.m Interface as IrDI     AT&T   Q6/15, Q12/15, Q11/15   2009-09-16
[ 430 ]  
 
G.709 OTN domains     AT&T   Q11/15   2009-09-16
[ 412 ]  
(Rev.1) 
Latency Measurements in the Optical Transport Network Using G.709 Overhead     Verizon , AT&T , BT , Nokia Siemens Networks   Q9/15, Q11/15   2009-09-15
[ 407 ]  
 
Mapping of 100GBASE-R into OPU4     Alcatel-Lucent   Q11/15   2009-09-15
[ 406 ]  
 
BIP-8 handling in adaptation of 40GBASE-R into OPU3 and 100GBASE-R into OPU4     Alcatel-Lucent   Q9/15, Q11/15   2009-09-15
[ 405 ]  
 
Adaptation of STM-256 over multichannel parallel interfaces     Alcatel-Lucent , Cisco , Finisar , Juniper   Q9/15, Q11/15   2009-09-15
[ 395 ]  
 
Further thoughts on the GMP CnD encoding     PMC-Sierra   Q11/15   2009-09-14
[ 361 ]  
 
Considerations and Proposal for Using OTN for GPON Reach Extension     PMC-Sierra   Q2/15, Q11/15   2009-09-08
[ 360 ]  
 
Proposal Amendment to G.8011.1 for the recent OTN Ethernet mappings     PMC-Sierra   Q11/15, Q10/15   2009-09-08
Resultados :38 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-5-21