Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 13 : Reunión 2009-01-12 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 13  C (2009-01-12) 

UIT-T SG 13

Redes futuras, incluidas las redes móviles y las de la próxima generación

Periodo de estudios 2009

Reunión  del 2009-01-12 al 2009-01-23

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-06-04  2012-02-17  2012-02-06  2011-10-10  2011-05-20  2011-01-17  2010-09-16  2010-04-19  2010-01-29  2009-09-02  2009-05-22 

Resultados :15 documentos
Contribuciones  [ Origen: China Mobile ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 175 ]  
 
Proposed modifications to clauses 7.2.2 and 7.2.3 of Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-08
[ 138 ]  
 
Proposal for additional text on routing optimization consideration for handover     China Mobile, Huawei Technologies Co. Ltd   Q5/13   2009-01-07
[ 133 ]  
 
Some modifications to the scenarios and flows of Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 125 ]  
 
Clarifications of the role of the Proxy Mobility Location Management Function (P-MLMF) in Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 123 ]  
 
Location of mobility service profile in Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 118 ]  
 
Clarification of the role of the HDF in Y.MMCF     China Mobile, CATR, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 115 ]  
 
Proposal of New Work Item on the Scenario of Multi-connection Architecture (Q.SCEN-MCA)     Huawei, China Mobile   Q9/13   2009-01-06
[ 113 ]  
 
Proposed work item for Requirements and capabilities of ITU-T DSN     China Mobile   Q19/13   2009-01-06
[ 112 ]  
 
Proposed work item for requirement of multi-connection     China Mobile   Q9/13   2009-01-06
[ 111 ]  
 
Proposed work item for architecture of multi-connection     China Mobile   Q9/13   2009-01-06
[ 110 ]  
 
Proposed Study Roadmap for Q9 (Multi-Connection Question)     China Mobile   Q9/13   2009-01-06
[ 109 ]  
 
Proposed Study Roadmap for Q19 (DSN)     China Mobile   Q19/13   2009-01-06
[ 108 ]  
 
Proposed Scope of Multi-connection Question     China Mobile   Q9/13   2009-01-06
[ 107 ]  
 
Proposed scope of DSN     China Mobile   Q19/13   2009-01-06
[ 106 ]  
 
Proposal for information flow for IMS based handover control     China Mobile, Huawei   Q8/13   2009-01-06
Resultados :15 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2025-7-24