Contribuciones
[ Origen: China ]  |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 523 ]
|
Proposal on structure and contents of L.performance
|
China
|
Q19/5
|
2012-09-27 |
|
[ 522 ]
|
Proposal on write into the efficiency and no-load power requirements of China in L.UPA draft on Appendix II
|
China
|
Q21/5
|
2012-09-27 |
|
[ 521 ]
|
Contribution of Basic Configuration, Voltage/Current definition, Ripple and Ripple Noise Voltage measurement to the draft
|
China
|
Q21/5
|
2012-09-27 |
|
[ 429 ]
|
Uncertainty calculator--version update and examples
|
China Mobile Communications Corporation
|
Q3/5
|
2012-03-29 |
|
[ 421 ]
|
Proposed structure of study report of lithium battery and proposal for a new work recommendation
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q21/5
|
2012-03-29 |
|
[ 415 ]
|
No Load Power and Ripple Voltage Test and Analysis for L.adapterPhase2
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q21/5
|
2012-03-29 |
|
[ 398 ]
(Rev.1) |
Safety Analysis for DC Remote Power-Feeding System in RRU.
|
China Telecommunications Corporation
|
Q5/5, Q11/5
|
2012-03-28 |
|
[ 397 ]
(Rev.1-2) |
Guidance on how to evaluate EM-environment in home networking for the drafting of K.henv.
|
China Telecommunications Corporation
|
Q8/5
|
2012-03-28 |
|
[ 349 ]
|
Proposal on Uncertainty calculation for K.guide
|
China Mobile Comms Corp
|
Q3/5
|
2011-09-09 |
|
[ 334 ]
|
Considerations of universal battery solution
|
China
|
Q21/5
|
2011-09-09 |
|
[ 333 ]
|
Survey and Proposal on L.adapter Phase2 draft
|
China
|
Q21/5
|
2011-09-09 |
|
[ 304 ]
|
Study and Proposals for the drafting of K.dbs
|
China Telecoms Corp.
|
Q5/5
|
2011-09-06 |
|
[ 230 ]
|
The specifications of 240V direct current power supply system for telecommunications
|
China
|
Q19/5
|
2011-04-15 |
|
[ 229 ]
|
The specification of DC power feeding system interface
|
China
|
Q19/5
|
2011-04-15 |
|
[ 228 ]
|
Study and proposal for the drafting of K.henv
|
China
|
Q8/5, Q16/5, Q12/5
|
2011-04-15 |
|
[ 227 ]
|
L.1000 research results on Chinese market for mobile phone
|
China
|
Q21/5
|
2011-04-15 |
|
[ 226 ]
|
Comments to L.1000 revision draft
|
China
|
Q21/5
|
2011-04-15 |
|
[ 213 ]
|
Proposed draft new Recommendation on "Energy efficiency metric for base stations"
|
China
|
Q17/5
|
2011-03-14 |
|
[ 212 ]
|
Proposed draft new Recommendation on "Component-level energy efficiency metrics for base stations"
|
China
|
Q17/5
|
2011-03-14 |
|
[ 171 ]
|
Appendix IV for L.adapterPhase2 draft
|
China
|
Q21/5
|
2010-11-11 |
|
[ 170 ]
|
EMC and Safety study and proposal for L.adapterPhase2 draft
|
China
|
Q21/5
|
2010-11-11 |
|
[ 169 ]
|
Proposal on output power range classification for L.adapterPhase2 draft
|
China
|
Q21/5
|
2010-11-11 |
|
[ 168 ]
|
Proposal to establish a new work item on Universal Li-ion battery solution for mobile phone and other ICT device
|
China
|
Q21/5
|
2010-11-11 |
|
[ 167 ]
|
Proposed structure for recommendation L.metrics (energy efficiency metrics for telecommunication equipment)
|
China
|
Q17/5
|
2010-11-11 |
|
[ 166 ]
|
Propose a new Recommendation on telecommunication terminal equipment EMC
|
China
|
Q16/5
|
2010-11-11 |
|
[ 165 ]
|
Mutual-disturbance Test Requirements for Performance Degradation Evaluation of Converged Terminal Devices
|
China
|
Q16/5
|
2010-11-11 |
|
[ 154 ]
|
Measurement and analysis of electromagnetic disturbance from in-house BPL
|
China Telecom Corp.
|
Q8/5
|
2010-11-04 |
|
[ 115 ]
|
Additional supplement of smart antennas calculation for K.guide
|
China Mobile Communications Corporation
|
Q3/5
|
2010-03-30 |
|
[ 95 ]
|
Output current proposal for L.1000 (L.adapter)
|
China
|
Q21/5
|
2010-01-11 |
|
[ 48 ]
|
Proposal on drafting the key technical points of L.adapter
|
China
|
Q21/5
|
2009-10-01 |
|
[ 41 ]
|
Equipment testing and evaluating methods for the QOE of broadband customer premises equipments within Multi-interference factors
|
China Telecoms Corp.
|
Q8/5, Q12/5
|
2009-09-10 |
|
[ 40 ]
|
Test methods for Resistibility of xDSL modem related to lightning protection
|
China Telecoms Corp.
|
Q4/5
|
2009-09-10 |
|
[ 22 ]
|
Proposal for Recommendation K.guide: Calculation and measurements for exposure assessment of adaptive antennas
|
China Mobile Communications Corp.
|
Q3/5
|
2009-05-14 |
|
[ 21 ]
|
Conducted electromagnetic environment research in home networking
|
MIIT, China
|
Q8/5
|
2009-05-14 |
Resultados :34 documentos
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):