Contribuciones Tardías |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 623 ]
|
Limiting jitter & wander production - SyncEth Network Clock
|
BT
|
Q13/15
|
2006-01-27 |
|
[ 622 ]
|
Enhancements to G.pactiming Appendix VIII
|
BT
|
Q13/15
|
2006-01-27 |
|
[ 621 ]
|
Proposed New Draft Recommendation G.PBT
|
BT
|
Q12/15
|
2006-01-27 |
|
[ 620 ]
|
Simulation and Test Configurations for Clock Synchronization over Packet Networks
|
Nortel Networks (Canada)
|
Q13/15
|
2006-01-27 |
|
[ 619 ]
|
VDSL2: DPBO specifications of G.993.2 Annex C; the revised version of MG-031
|
NTT
,
SoftbankBB
,
NEC
,
Fujitsu
,
ACCA
|
Q4/15
|
2006-01-27 |
|
[ 618 ]
|
Topics for a Liaison Statement to IEC on restart conditions after APR (G.664)
|
Deutsche Telekom
|
Q6/15
|
2006-01-27 |
|
[ 617 ]
|
Unified Functional Model
|
Ciena
|
Q12/15
|
2006-01-27 |
|
[ 616 ]
|
Comments on G.7718.1 UML
|
Ciena
|
Q14/15
|
2006-01-27 |
|
[ 615 ]
|
Role of ITU-T work on Ethernet Equipment
|
Ciena
|
Q9/15
|
2006-01-27 |
|
[ 614 ]
|
GFP MTU sizes for the GFP-F Payload
|
Deutsche Telekom
|
Q11/15
|
2006-01-27 |
|
[ 613 ]
|
Incorporation of Provide Bridge issues in Recommendation G.8012
|
Deutsche Telekom
|
Q11/15
|
2006-01-27 |
|
[ 612 ]
|
Deletion of length encapsulation from subclause 6.1.2/G.8012
|
Deutsche Telekom
|
Q11/15
|
2006-01-27 |
|
[ 611 ]
|
Proposal for application codes using EDC for 80km 10 Gb/s applications in G.959.1 and supporting data
|
AMCC
|
Q6/15
|
2006-01-27 |
|
[ 610 ]
|
Considerations on unified model
|
Siemens
|
Q12/15
|
2006-01-27 |
|
[ 609 ]
|
Proposed extended definition of transport entity
|
Alcatel
|
Q12/15
|
2006-01-27 |
|
[ 608 ]
|
Proposal for G.652 compliant G.smx fibres
|
Italy
|
Q5/15, Q10/15
|
2006-01-27 |
|
[ 607 ]
|
Comments on the proposal for the new Recommendation G.650.3
|
Telecom Italia
|
Q5/15
|
2006-01-27 |
|
[ 606 ]
|
Values of PXC transfer parameters for G.otf
|
Telecom Italia
|
Q7/15, Q6/15
|
2006-01-27 |
|
[ 605 ]
|
Values of OADM transfer parameters for G.otf
|
Telecom Italia
|
Q7/15, Q6/15
|
2006-01-27 |
|
[ 604 ]
|
Proposals for the new Recommendation G.dapp.2
|
Telecom Italia
|
Q6/15
|
2006-01-27 |
|
[ 603 ]
(Rev.1) |
Support for consenting Transport MPLS Recommendations
|
Italy
,
France
|
Q12/15, Q11/15, Q9/15
|
2006-01-27 |
|
[ 602 ]
|
Improvements proposals for the G.pactiming
|
Ericsson
|
Q13/15
|
2006-01-27 |
|
[ 601 ]
|
Proposals for improvements of Figure 2 in G.pactiming
|
Ericsson
|
Q13/15
|
2006-01-27 |
|
[ 600 ]
|
Proposals on Study Point 20 in G.pactiming Living List
|
Ericsson
|
Q13/15
|
2006-01-27 |
|
[ 599 ]
|
Proposals on Network Limits (clause 7) in G.pactiming
|
Ericsson
|
Q13/15
|
2006-01-27 |
|
[ 598 ]
|
Proposals on Measurement Guidelines Appendix in the G.pactiming (SP23)
|
Ericsson
|
Q13/15
|
2006-01-27 |
|
[ 597 ]
|
Proposals for Clause 12, IWF Requirements in G.pactiming (SP25 and SP7)
|
Ericsson
|
Q13/15
|
2006-01-27 |
|
[ 596 ]
|
Proposed Entity Definitions for the Unified Model
|
BT
|
Q12/15
|
2006-01-27 |
|
[ 595 ]
|
Timing Diagrams for TDM transport over Packet Switched Networks
|
Israel
|
Q13/15
|
2006-01-27 |
|
[ 594 ]
|
Proposal to define pseudowire over GFP encapsulation
|
Israel
|
Q11/15
|
2006-01-27 |
|
[ 593 ]
|
Clarifications regarding Figures 4,5, and 7 of G.pactiming
|
Israel
|
Q13/15
|
2006-01-27 |
|
[ 592 ]
|
Additional text for Appendix VI/G.pactiming
|
Israel
|
Q13/15
|
2006-01-27 |
|
[ 591 ]
|
Proposed changes to clause 9/G.pactiming
|
Israel
|
Q13/15
|
2006-01-27 |
|
[ 590 ]
|
Clarifications concerning Table 2/G.pactiming
|
Israel
|
Q13/15
|
2006-01-27 |
|
[ 589 ]
|
Effect of packet loss/packet mis-order on timing recovery (High BW PLL)
|
Israel
|
Q13/15
|
2006-01-27 |
|
[ 588 ]
|
Reference timing source noise model for simulation of the differential clock recovery method
|
Israel
|
Q13/15
|
2006-01-27 |
|
[ 587 ]
|
Draft text proposal for clause 6 in new Rec. G.subcab
|
France Telecom
|
Q8/15
|
2006-01-26 |
|
[ 586 ]
|
Proposal for G653/G655 fiber Ultra long-haul applications with FEC in G.959.1
|
Huawei
|
Q6/15
|
2006-01-26 |
|
[ 585 ]
|
TTL process of the transport MPLS
|
Huawei
|
Q9/15, Q12/15
|
2006-01-26 |
|
[ 584 ]
|
Summary of the issues on interlayer aspects in G.8080 draft
|
Huawei
,
China Mobile
|
Q14/15, Q12/15
|
2006-01-26 |
|
[ 583 ]
|
Status migration between power shedding and normal status
|
Huawei
|
Q2/15
|
2006-01-27 |
|
[ 582 ]
|
Several Comments of G.OTF
|
Huawei
|
Q6/15
|
2006-01-27 |
|
[ 581 ]
|
Proposed Text Annex x. Automode
|
Huawei
|
Q4/15
|
2006-01-27 |
|
[ 580 ]
|
Proposal to current G.hs carrier set designation
|
Huawei
|
Q4/15
|
2006-01-27 |
|
[ 579 ]
|
Proposal to criteria of automode
|
Huawei
|
Q4/15
|
2006-01-27 |
|
[ 578 ]
|
Proposal of GPON in support of 802.1ad
|
Huawei
|
Q2/15
|
2006-01-27 |
|
[ 577 ]
|
Proposal for APS protocol phase in Y.1720
|
Huawei
|
Q9/15
|
2006-01-27 |
|
[ 576 ]
|
Proactive advertisement of MAC address in MAC-in-MAC networks
|
Huawei
|
Q12/15
|
2006-01-27 |
|
[ 575 ]
|
New requirement for Power Shed on ONT
|
Huawei
|
Q2/15
|
2006-01-27 |
|
[ 574 ]
|
G.783 corrections intended for new revision
|
Huawei
|
Q11/15
|
2006-01-27 |
Resultados :217 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):