Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG13 : Reunión 2008-09-12 : Documentos Temporales  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG13  TD (2008-09-12) 

UIT-T SG13

Gestión y coordinación de proyectos; Arquitecturas y principios de interfuncionamiento; Redes y mecanismos multiprotocolo; Calidad de funcionamiento de la red y gestión de los recursos

Periodo de estudios 2005

Reunión  del 2008-09-12 al 2008-09-12

Lugar : Suiza [Ginebra]

Otras reuniones : 2009-09-01  2009-01-12  [ 2008-09-12 ]  2008-05-22  2008-01-14  2007-09-21  2007-04-16  2006-11-03  2006-07-17  2006-01-16  2005-08-29  2005-04-25  2004-12-07 

Documentos Temporales  (GEN)  [ AI/Cuestión: Q1/13 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 349-GEN ]  
 
Comparison table between TRY.NGN-R2-scope and Y.NGN-R2-reqts (NGN-GSI event, Geneva, 1-11 September 2008)     Q.1/13 and Q.2/13 Rapporteurs   Q2/13, Q1/13   2008-09-12
[ 348-GEN ]  
(Rev.1) 
Report of joint Q.1/13 and Q.2/13 meeting (NGN-GSI event, Geneva, 1-11 September 2008)     Q.1/13 and Q.2/13 Rapporteurs   Q2/13, Q1/13   2008-09-12
[ 344-GEN ]  
 
Comparison table between TRY.NGN-R2-Scope and Y.NGN-R2-Reqts ? output of the joint Q.1/13 and Q.2/13 interim electronic meeting (15 July 2008)     Q.1/13 and Q.2/13 Rapporteurs   Q2/13, Q1/13   2008-08-12
[ 343-GEN ]  
 
Meeting report of July 15th joint Q.1/13 and Q.2/13 interim electronic meeting (15 July 2008)     Q.1/13 and Q.2/13 Rapporteurs   Q2/13, Q1/13   2008-08-12
[ 319-GEN ]  
 
Liaison to JCA-NID, SG 13 (Q.2&3/13) and SG 16 (Q.21&22/16) on Directory support for ID-based applications     ITU-T SG 17   Q3/13, Q1/13, Q2/17   2008-05-01
 

 
Documentos Temporales  (PLEN)  [ AI/Cuestión: Q1/13 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 403-PLEN ]  
 
Output draft Supplement NGN release 2 scope (TRY.NGN-R2-scop) (NGN-GSI event, Geneva, 1-11 September 2008)     Editors of TRY.NGN-R2-scope   Q1/13   2008-09-11
 

 
Documentos Temporales  (WP1)  [ AI/Cuestión: Q1/13 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 173-WP1 ]  
(Rev.1) 
Q.1/13 meeting report (NGN-GSI event, Geneva, 1-11 September 2008)     Q.1/13 Rapporteur   Q1/13   2008-09-11
[ 172-WP1 ]  
 
Q.1/13 Living List (NGN-GSI event, Geneva, 1-11 September 2008)     Q.1/13 Rapporteur   Q1/13   2008-09-10
[ 171-WP1 ]  
 
Draft Recommendation Y.NGN-Cap2, Description of NGN capability set 2 (NGN-GSI event, Geneva, 1-11 September 2008)     Editors of Y.NGN-Cap2   Q1/13   2008-09-10
[ 170-WP1 ]  
 
Output NGN-roadmap document (NGN-GSI event, Geneva, 1-11 September 2008)     Editors of NGN-roadmap   Q1/13   2008-09-10
[ 165-WP1 ]  
 
Output NGN-roadmap document (NGN-GSI, 1-11 September 2008)     Editor of NGN-roadmap   Q1/13   2008-09-03
Documentos presentados : 5 de un total de 7  relacionaron a este reunión (vea más...)  

 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-4-26