Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG11 : Reunión 2004-03-01 : Documentos Temporales  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG11  TD-WP2 (2004-03-01) 

UIT-T SG11

Requisitos y protocolos de señalización

Periodo de estudios 2001

Reunión  del 2004-03-01 al 2004-03-12

Lugar : Suiza [Ginebra]

Otras reuniones : [ 2004-03-01 ]  2003-09-01  2002-11-11  2002-02-18  2001-07-02  2001-05-14  2001-03-21  2000-11-27 

Resultados :26 documentos
Documentos Temporales  (WP2)   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 26-WP2 ]  
 
Draft discussion summary of Q8/11 meetings on 4-5 March 2004     WP 2/11 Chairman (G. Ratta)   Q8/11   2004-03-05
[ 25-WP2 ]  
 
BICC CS3 Overall Requirements (Restructured)     Editor (D. Knight)   Q9/11   2004-03-04
[ 24-WP2 ]  
 
Draft BICC CS3 Requirement Flows (Draft TRQ.BICC.CS3.flows)     Editor (I. Rytina)   Q9/11   2004-03-03
[ 23-WP2 ]  
 
BICC CS3 overall Requirements (output)     Editor (D. Knight)   Q9/11   2004-03-03
[ 22-WP2 ]  
 
Q9/11 meeting report     Rapporteur (L. Graf)   Q9/11   2004-03-02
[ 21-WP2 ]  
(Rev.1) 
Draft Signalling Requirements to support IP telephony (INPUT)     Rapporteur (K. Kenyoshi)   Q7/11   2004-03-01
[ 20-WP2 ]  
 
Proposed Agenda of Q.7/11 (SWP2-2)     Rapporteur (K. Kenyoshi)   Q7/11   2004-03-01
[ 19-WP2 ]  
 
Proposed Agenda for Q8/11 Discussions     WP2/11 Chairman (G. Ratta)   Q8/11   2004-02-29
[ 18-WP2 ]  
(Rev.1) 
Meeting agenda, document allocation and schedule.     Rapporteur (L. Graf)   Q9/11   2004-02-26
[ 17-WP2 ]  
(Rev.1) 
Q6/11 Agenda     Q6/11 Rapporteur (K. Mainwaring)   Q6/11   2004-02-25
[ 16-WP2 ]  
(Rev.1-2) 
Technical Report TRQ.NSIP Syntax Requirements For Carrying Narrowband Signalling Information Within IP-Based Signalling Systems     Editor (T. Fu)   Q6/11   2004-02-24
[ 15-WP2 ]  
 
Reply to Proposal on control plane interworking between FR and MPLS     SG 17 (GVA, 10-19 Sept. 2003)   Q5/17, Q8/11   2003-10-07
[ 14-WP2 ]  
(Rev.1) 
Draft Technical Report TRQ.IPQoS.Sig.CS1 - Signalling Requirements for IP-QoS     Editor pro tem (G. Ratta)   Q9/11, Q8/11, Q7/11   2004-02-23
[ 13-WP2 ]  
(Rev.1) 
WP 2/11 Work Programme     WP2/11 Vice-Chairman (D. Knight)   Q9/11, Q8/11, Q7/11, Q6/11   2004-02-21
[ 12-WP2 ]  
 
BICC CS3 Overall Requirements (input)     Editor, TRQ.BICC.CS3.GEN (D. Knight)   Q9/11   2004-02-19
[ 11-WP2 ]  
 
Editors proposal for TECHNICAL REPORT TRQ.BICC/ISUPSIP Set 2 of Requirements for Interworking BICC/ISUP Network with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol     Editor (R. Jesske)   Q9/11, Q6/11   2004-02-18
[ 10-WP2 ]  
 
TECHNICAL REPORT TRQ.DSS1SIP Requirements for Interworking DSS1 with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol     Editor (R. Jesske)   Q9/11, Q6/11   2004-02-18
[ 9-WP2 ]  
(Rev.1) 
Draft new Recommendation Y.e2eqos on an end-to-end QoS architecture for IP networks evolving into the NGN  
R1 submitted by SG13 on 20.02.04 in replacement of TD 9-2/11
 
SG13 (GVA 3-12 February 2004)   Q16/13, Q8/11   2004-02-17
[ 8-WP2 ]  
 
Liaison Statement - QoS signalling requirements pertaining to the draft new Recommendation Y.123.qos on a Qos architecture for Ethernet-based access networks     SG13 (GVA 3-12 February 2004)   Q16/13, Q8/11   2004-02-17
[ 7-WP2 ]  
 
Reply LS to SG 11 on Signalling Requirements for IP-QoS     SG 16 ( GVA 20-30 January 2004)   QF/16, Q8/11   2004-02-05
[ 6-WP2 ]  
 
Liaison Reply to ITU-T SG 11 on Signalling Requirements to support IP Telephony     SG 9 (Honolulu, 15-21 January 2004)   Q13/9, Q12/9, Q10/9, Q7/11   2004-02-04
[ 5-WP2 ]  
 
Liaison Statement - Update on QoS Lead Study Group activities     SG12 (GVA 30.09.03)   Q15/12, Q8/11   2003-10-10
[ 4-WP2 ]  
 
Liaison Statement - Response to liaison on Draft Signalling Requirements to Support "IP Telephony"     ETSI TISPAN (TIPHON) 1-5 Dec. 2003   Q7/11   2003-12-11
[ 3-WP2 ]  
 
Liaison Statement - Revised Recommendation G.114     SG12 (GVA 30.09.03)   Q10/12, Q8/11   2003-10-10
[ 2-WP2 ]  
 
List of WP2/11 Series Temporary Documents     TSB   Q9/11, Q8/11, Q7/11, Q6/11   2004-02-27
[ 1-WP2 ]  
 
Agenda - WP2/11 Plenary Sessions  
To be provided
 
N/A (no se aplica)     N/A
Resultados :26 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2025-10-11