Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG11 : Reunión 2004-03-01 : Documentos Temporales  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG11  TD (2004-03-01) 

UIT-T SG11

Requisitos y protocolos de señalización

Periodo de estudios 2001

Reunión  del 2004-03-01 al 2004-03-12

Lugar : Suiza [Ginebra]

Otras reuniones : [ 2004-03-01 ]  2003-09-01  2002-11-11  2002-02-18  2001-07-02  2001-05-14  2001-03-21  2000-11-27 

Documentos Temporales  (GEN)  [ AI/Cuestión: Q8/11 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 73-GEN ]  
 
Discussions of WP 2/11 plenary session     WP2/11 Chairman (G. Ratta)   Q9/11, Q8/11, Q7/11, Q6/11   2004-03-09
[ 62-GEN ]  
(Rev.1) 
Draft Discussion summary of Q8/11 meetings on 4-5 March 2004     WP2/11 Chairman (G. Ratta)   Q8/11   2004-03-08
[ 59-GEN ]  
 
TRQ.IPQOS.SIG.CS1 (Editing Output)     Editor (T. Tsou)   Q8/11   2004-03-05
[ 50-GEN ]  
 
Editors proposal for TECHNICAL REPORT TRQ.BICC/ISUPSIP Set 2 of Requirements for Interworking BICC/ISUP Network with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol     Temporary Editor (R. Jesske)   Q12/11, Q16/11, Q11/11, Q10/11, Q9/11, Q8/11, Q7/11, Q6/11   2004-03-04
[ 49-GEN ]  
 
TECHNICAL REPORT TRQ.DSS1SIP Requirements for Interworking DSS1 with Originating/Destination Networks based on Session Initiation Protocol and Session Description Protocol     Temporary Editor (R. Jesske)   Q16/11, Q12/11, Q11/11, Q10/11, Q9/11, Q8/11, Q7/11, Q6/11   2004-03-04
Documentos presentados : 5 de un total de 14  relacionaron a este reunión (vea más...)  

 
Documentos Temporales  (PLEN)  [ AI/Cuestión: Q8/11 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 30-PLEN ]  
 
WP2/11 Document Roadmap for SG 11 Plenary     WP2/11 Chairman (G. Ratta)   Q9/11, Q8/11, Q7/11, Q6/11   2004-03-10
[ 29-PLEN ]  
(Rev.1-2) 
WP2/11 PART I Report     WP2/11 Chairman (G. Ratta)   Q9/11, Q8/11, Q7/11, Q6/11   2004-03-10
[ 18-PLEN ]  
(Rev.1-3) 
Terms of Reference for Interim Meeting on IP QoS Signalling Requirements     WP2/11 Chairman (G. Ratta)   Q8/11   2004-03-08
[ 8-PLEN ]  
 
Roadmap for documents associated with discussions of Questions assigned to WP2/11     WP2/11 Chairman (G. Ratta)   Q9/11, Q8/11, Q7/11, Q6/11   2004-02-29
 

 
Documentos Temporales  (WP2)  [ AI/Cuestión: Q8/11 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 26-WP2 ]  
 
Draft discussion summary of Q8/11 meetings on 4-5 March 2004     WP 2/11 Chairman (G. Ratta)   Q8/11   2004-03-05
[ 19-WP2 ]  
 
Proposed Agenda for Q8/11 Discussions     WP2/11 Chairman (G. Ratta)   Q8/11   2004-02-29
[ 15-WP2 ]  
 
Reply to Proposal on control plane interworking between FR and MPLS     SG 17 (GVA, 10-19 Sept. 2003)   Q5/17, Q8/11   2003-10-07
[ 14-WP2 ]  
(Rev.1) 
Draft Technical Report TRQ.IPQoS.Sig.CS1 - Signalling Requirements for IP-QoS     Editor pro tem (G. Ratta)   Q9/11, Q8/11, Q7/11   2004-02-23
[ 13-WP2 ]  
(Rev.1) 
WP 2/11 Work Programme     WP2/11 Vice-Chairman (D. Knight)   Q9/11, Q8/11, Q7/11, Q6/11   2004-02-21
Documentos presentados : 5 de un total de 11  relacionaron a este reunión (vea más...)  

 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2025-7-29