Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG11 : Reunión 2003-09-01 : Documentos Temporales  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG11  TD-PLEN (2003-09-01) 

UIT-T SG11

Requisitos y protocolos de señalización

Periodo de estudios 2001

Reunión  del 2003-09-01 al 2003-09-12

Lugar : Suiza [Ginebra]

Otras reuniones : 2004-03-01  [ 2003-09-01 ]  2002-11-11  2002-02-18  2001-07-02  2001-05-14  2001-03-21  2000-11-27 

Resultados :34 documentos
Documentos Temporales  (PLEN)  [ AI/Cuestión: QALL/11 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 44-PLEN ]  
(Rev.1) 
WP3/11 Liaisons External to Study Group 11     WP3/11 Chairman (A. Le Roux)   QALL/11   2003-09-12
[ 43-PLEN ]  
(Rev.1) 
A.5 documentation for approval of Q.1912.SIP     Associate Rapporteur (T. Taylor)   QALL/11   2003-09-12
[ 42-PLEN ]  
(Rev.1) 
Draft Q.1912.SIP     Acting Editor (C. Hogg)   Q11/11, QALL/11   2003-09-11
[ 39-PLEN ]  
 
Draft New Recommendation Q.2920     Editor (G. Koleyni)   Q12/11, Q8/11, QALL/11   2003-09-11
[ 38-PLEN ]  
 
Deletion of Q.10xx-series recommendations     SG 11   QALL/11   2003-09-11
[ 37-PLEN ]  
 
Proposed texts for new Questions N1, N2 and N3/11     SG 11   QALL/11   2003-09-11
[ 36-PLEN ]  
 
Draft Report of the SG11 Plenary     SG 11 Chairman (Y. Hiramatsu)   QALL/11   2003-09-11
[ 35-PLEN ]  
 
WP2/11 Work Programme (output)     WP2/11 Vice-Chairman   QALL/11   2003-09-11
[ 34-PLEN ]  
 
WP1/11 part I Report     WP1/11 Vice Chairman (J. Humphrey)   QALL/11   2003-09-11
[ 33-PLEN ]  
(Rev.1) 
WP1/11 Work Programme Output     WP1/11 Vice Chairman   QALL/11   2003-09-11
[ 32-PLEN ]  
(Rev.1) 
WP1/11 Liaisons Exteranl to Study Group 11     WP1/11 Vice Chairman (J. Humphrey)   QALL/11   2003-09-11
[ 28-PLEN ]  
(Rev.1) 
Proposed Workplan for SG11 Meeting in March 2004     SG11 Vice Chairperson   QALL/11   2003-09-11
[ 26-PLEN ]  
 
Draft new ITU-T Recommendation Q.2630.3 AAL type 2 Signalling Protocol (Capability Set 3)     Editor (P. Schicker)   Q15/11, QALL/11   2003-09-11
[ 25-PLEN ]  
 
Technical report TRQ.2000:Roadmap for the TRQ.2xxx-series technical reports     SG11 Vice Chairman   QALL/11   2003-09-11
[ 24-PLEN ]  
 
Draft Supplement 46     Editor (G. Koleyni)   Q12/11, Q8/11, QALL/11   2003-09-11
[ 23-PLEN ]  
 
REQUIREMENTS FOR SPECIFYING INTERWORKING BETWEEN BICC/ISUP PEER-TO-PEER PROTOCOL AND SIP/SDP AT "NNI."     Temporary Editor (D. Knight)   QALL/11   2003-09-11
[ 19-PLEN ]  
 
Draft ITU-T Recommendation Q.2631.1     Editor (I. Rytina)   Q15/11, QALL/11   2003-09-10
[ 18-PLEN ]  
 
Draft New ITU-T Recommendation Q.2632.1     Editor (B. Pfeil)   Q15/11, QALL/11   2003-09-10
[ 17-PLEN ]  
 
Draft TRQ.2415     Editor (L. Graf)   Q9/11, QALL/11   2003-09-10
[ 16-PLEN ]  
 
Draft TRQ.2402     Editor (L. Graf)   Q9/11, QALL/11   2003-09-10
[ 15-PLEN ]  
 
Draft New Technical Report TRQ.2800     Editor (B. Pfeil)   Q9/11, QALL/11   2003-09-10
[ 14-PLEN ]  
 
Proposed Output Liaisons Originated by SG11 Coordination Sessions     SG11 Vice Chairman   QALL/11   2003-09-10
[ 13-PLEN ]  
 
Discussion Report of the SG 11 Coordination Session Held 8 September 2003 (Draft)     SG 11 Vice-Chairperson   QALL/11   2003-09-09
[ 11-PLEN ]  
(Rev.1) 
Draft NCAP/NGN Session Report     NCAP/NGN Sess. Chairs (A. Le Roux, J. Dobrowolski)   QALL/11   2003-09-04
[ 10-PLEN ]  
 
TSB Director's 2003 Informal Forum Summit -Output and list of participants     TSB   QALL/11   2003-08-05
[ 9-PLEN ]  
 
Liaison Statement - Correspondence Group on 'Time-E'     TSAG (GVA. 24-28 February 2003)   QALL/11   2003-03-25
[ 8-PLEN ]  
 
Liaison on Regional Balance to ITU-T meetings     TSAG (GVA. 24-28 February 2003)   QALL/11   2003-03-25
[ 7-PLEN ]  
 
Liaison on use of mandatory terms such as "shall" or "must" in ITU-T Recommendations     TSAG (GVA 24-28 February 2003)   QALL/11   2003-03-25
[ 6-PLEN ]  
 
Liaison on Procedures for Study Group Questions     TSAG (GVA 24-28 February 2003)   QALL/11   2003-03-25
[ 5-PLEN ]  
 
Liaison Statement - ToR and action plan for the "ITU-T SGs Restructuring" Group     TSAG (24-28 February 2003)   QALL/11   2003-03-25
[ 4-PLEN ]  
 
Liaison Statement - SG 9 Reply to TSAG on Restructuring of Study Groups (LS02-TSAG)     SG9 (April 2003)   QALL/11, QALL/9   2003-04-08
[ 3-PLEN ]  
 
Hard and Soft copies to tbe handed to TSB secretariat before leaving; guidelines for preparing Recommendation texts, Liaisons/Transmittal and SG11 Work Programme     TSB   QALL/11   2003-08-08
[ 2-PLEN ]  
(Rev.1-2) 
List of PL/11 Series Temporary Documents  
Rev. 1 - updated list (05.09.03) Rev. 2 - updated list (11.09.03), available only electronically
 
TSB   QALL/11   2003-09-01
[ 1-PLEN ]  
(Rev.1) 
Proposed Draft Agenda     TSB   QALL/11   2003-09-01
Resultados :34 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2025-7-16