Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : R23-WP4A : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R R23-WP4A  C 

UIT-R R23-WP4A

Utilización Eficaz de la Orbita y del Espectro para el SFS y el SRS

Resultados :63 documentos
Resultados :  1 - 2  - Siguiente Next
Contribuciones  [ AI/Cuestión: AI1.2 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 809 ]  
 
Studies for inclusion in the working document on WRC-27 agenda item 1.2 - Update to working document on WRC-27 agenda item 1.2     Sweden   AI1.2   2025-10-15
[ 806 ]  
 
Proposed revisions to working document on WRC-27 agenda item 1.2 Part 5: sharing between the FSS and the SRS     United States   AI1.2   2025-10-15
[ 787 ]  
 
Proposed revisions to working document on WRC-27 agenda item 1.2 - Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     United States   AI1.2   2025-10-15
[ 783 ]  
 
Sharing and compatibility study of FSS systems with SRS operating in the 13.75-14 GHz frequency range     United States   AI1.2   2025-10-15
[ 782 ]  
 
Sharing and compatibility study of FSS systems with maritime RLS operating in the 13.75-14 GHz frequency range     United States   AI1.2   2025-10-15
[ 781 ]  
 
Working document towards draft CPM text for WRC-27 agenda item 1.2     United States   AI1.2   2025-10-15
[ 780 ]  
 
Working document on WRC-27 agenda item 1.2 (Part 3) - operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     United States   AI1.2   2025-10-15
[ 779 ]  
 
Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     United States   AI1.2   2025-10-15
[ 754 ]  
 
Elements towards a working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     France   AI1.2   2025-10-15
[ 753 ]  
 
Proposed updates on working document on WRC-27 agenda item 1.2     France   AI1.2   2025-10-15
[ 748 ]  
 
Proposed draft CPM text for WRC-27 agenda item 1.2     Indonesia   AI1.2   2025-10-15
[ 747 ]  
 
Studies for inclusion in the working document on WRC-27 agenda item 1.2     Papua New Guinea , Singapore   AI1.2   2025-10-15
[ 746 ]  
 
Update to working document towards draft CPM text on WRC-27 agenda item 1.2     Papua New Guinea , Singapore   AI1.2   2025-10-15
[ 745 ]  
 
Update to aggregate GSO study in Part 3 Annex 3 of 4A/567 for inclusion in the working document on WRC-27 agenda item 1.2     Papua New Guinea , China , India , Indonesia , Singapore , Thailand   AI1.2   2025-10-15
[ 733 ]  
 
Questions related to the technical evolution of the FSS for sharing of the band 13.75-14 GHz under WRC-27 agenda item 1.2     Canada   AI1.2   2025-10-14
[ 732 ]  
 
Study related to WRC-23 agenda item 1.2 - Impact of small antennas on radiolocation service     Canada   AI1.2   2025-10-14
[ 731 ]  
 
Modeling FSS deployment for WRC-27 agenda item 1.2 coexistence studies     Canada   AI1.2   2025-10-14
[ 721 ]  
 
Proposal updates on the studies under WRC-27 agenda item 1.2     China   AI1.2   2025-10-14
[ 713 ]  
 
Update to study on interference analysis from FSS into aeronautical RLS for inclusion in the working document on WRC-27 agenda item 1.2     Singapore , Papua New Guinea   AI1.2   2025-10-14
[ 694 ]  
 
Studies for inclusion in the working document on WRC-27 agenda item 1.2 (update to Part 3 Annex 3 of Document 4A/567)     African Telecommunications Union   AI1.2   2025-10-14
[ 693 ]  
 
Update to working document towards draft CPM text on WRC-27 agenda item 1.2     African Telecommunications Union   AI1.2   2025-10-14
[ 671 ]  
 
Proposed modifications to working document on WRC-27 agenda item 1.2 (Part 3) - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     Korea (Rep. of)   AI1.2   2025-10-14
[ 670 ]  
 
Proposed modifications to the working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     Korea (Rep. of)   AI1.2   2025-10-14
[ 634 ]  
 
FSS deployment models for GSO and non-GSO systems to be used for WRC-27 agenda item 1.2 studies     Brazil   AI1.2   2025-10-07
[ 607 ]  
 
Sharing study between non-GSO FSS (Earth-to-space) and RLS in the 13.75-14 GHZ frequency band     Russian Federation   AI1.2   2025-10-02
[ 606 ]  
 
Sharing study of GSO FSS satellite networks with SRS systems operating in the 13.75-14 GHz frequency range under WRC-27 agenda item 1.2     Russian Federation   AI1.2   2025-10-02
[ 594 ]  
 
Reply liaison statement to Working Party 4A - WRC-27 agenda item 1.2 - Characteristics of space research service systems operating in the 13.75-14.0 GHz band     WP 7B   AI1.2   2025-09-19
[ 577 ]  
 
Liaison statement to Working Parties 4A and 5B (copy to Working Parties 5A, 5C, 7A, 7B and 7C for information) - Update on propagation modelling for WRC-27 agenda item 1.2     WP 3M   AI1.2   2025-06-09
[ 539 ]  
 
Studies for inclusion in the working document on WRC-27 agenda item 1.2 - Update to working document on WRC-27 agenda item 1.2     African Telecommunications Union   AI1.2   2025-04-23
[ 531 ]  
 
Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     France   AI1.2   2025-04-23
[ 530 ]  
 
Elements to working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     France   AI1.2   2025-04-23
[ 512 ]  
 
Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     United States   AI1.2   2025-04-23
[ 508 ]  
 
Sharing and compatibility study of FSS systems with SRS operating in the 13.75-14 GHz frequency range     United States   AI1.2   2025-04-23
[ 500 ]  
 
Proposed revisions to Working Document on WRC-27 agenda item 1.2     United States   AI1.2   2025-04-23
[ 485 ]  
 
Working document on WRC-27 agenda item 1.2 - Update to working document on WRC-27 agenda item 1.2 to include usage of 13.75-14 GHz in APT region     Papua New Guinea   AI1.2   2025-04-23
[ 484 ]  
 
Working document on WRC-27 agenda item 1.2 - Update to working document on WRC-27 agenda item 1.2     Papua New Guinea , China , Thailand   AI1.2   2025-04-23
[ 483 ]  
 
Working document on WRC-27 agenda item 1.2 - Update to working document on WRC-27 agenda item 1.2     Papua New Guinea , China , India , Indonesia , Singapore , Thailand   AI1.2   2025-04-23
[ 482 ]  
 
Studies for inclusion in the working document on WRC-27 agenda item 1.2 - Update to working document on WRC-27 agenda item 1.2     Singapore   AI1.2   2025-04-22
[ 480 ]  
 
Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     Ghana   AI1.2   2025-04-22
[ 468 ]  
 
Study related to WRC-23 agenda item 1.2 - Impact of small antennas on radiolocation service     Canada   AI1.2   2025-04-23
[ 447 ]  
 
Studies for inclusion in the working document on WRC-27 agenda item 1.2 - Update to working document on WRC-27 agenda item 1.2     Luxembourg   AI1.2   2025-04-22
[ 435 ]  
 
Proposal on the studies under WRC-27 agenda item 1.2     China   AI1.2   2025-04-22
[ 417 ]  
 
Proposals for draft liaison statement to Working Party 7B     Russian Federation   AI1.2   2025-04-21
[ 410 ]  
 
FSS deployment models for GSO and non-GSO systems to be used for WRC-27 agenda item 1.2 studies     Brazil   AI1.2   2025-04-17
[ 388 ]  
 
Proposed revisions of the working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     Korea (Rep. of)   AI1.2   2025-04-16
[ 355 ]  
 
Liaison statement to Working Party 4A - Relevant technical information to support studies under WRC-27 agenda item 1.2     WP 5A   AI1.2   2024-12-11
[ 324 ]  
 
Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     France   AI1.2   2024-10-09
[ 296 ]  
 
Proposed updates to Annex 4 to Working Party 4A Chair's Report - Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     Canada   AI1.2   2024-10-08
[ 289 ]  
 
Studies for inclusion in the working document on WRC-27 agenda item 1.2 - Update to working document on WRC-27 agenda item 1.2     Papua New Guinea , India , Indonesia , Thailand   AI1.2   2024-10-09
[ 288 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 3M, 5A, 5C, 7A, 7B and 7C)     Papua New Guinea   AI1.2   2024-10-09
Resultados :63 documentos
Resultados :  1 - 2  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2025-11-26