Contribuciones  |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 559 ]
|
Liaison statement to Working Party 4A (copy to Study Group 4 and Working Party 4B) - Handbook on Satellite Communications
|
WP 4C
|
|
2025-05-04 |
|
[ 558 ]
|
Liaison statement to Working Party 4A (copy to Working Party 1B for information) - WRC-27 agenda item 1.5
|
WP 4C
|
AI1.5
|
2025-05-04 |
|
[ 557 ]
|
Liaison statement on the provisional approval of a new work item on cost models for provisioning satellite internet connectivity services
|
ITU-T SG3
|
|
2025-05-02 |
|
[ 556 ]
|
WRC-23 actions arising from the report of the Director to WRC-23 and the report of the Radio Regulations board to WRC-23 on Resolution 80 (Rev.WRC-07)
|
Director, BR
|
|
2025-04-28 |
|
[ 555 ]
|
Exclusion of a territory of a country from the service area of a satellite network for planned and unplanned bands
|
Director, BR
|
|
2025-04-25 |
|
[ 554 ]
|
Information on the use of Radio Regulations No. 4.4 in space services
|
Director, BR
|
|
2025-04-25 |
|
[ 553 ]
|
Information concerning Document 4A/241
|
Director, BR
|
|
2025-04-25 |
|
[ 552 ]
|
Resolution 76 (Rev.WRC-23) methodologies
|
Indonesia
|
|
2025-04-23 |
|
[ 551 ]
|
Proposed elements of working document towards draft CPM text for WRC-27 agenda item 1.5
|
Indonesia
|
AI1.5
|
2025-04-23 |
|
[ 550 ]
|
ITU-R Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services
|
Chair, WP 4A on behalf of Editor, Space Sustainability Handbook
|
|
2025-04-23 |
|
[ 549 ]
|
Issues from report of the Director to WRC-23 relevant to Appendices 30, 30A and 30B of the Radio Regulations
|
Director, BR
|
|
2025-04-24 |
|
[ 548 ]
|
Information related to WRC-27 agenda item 1.6
|
Director, BR
|
AI1.6
|
2025-04-24 |
|
[ 547 ]
|
Proposed topic under WRC-27 agenda item 7 - Proposed revision to Resolution 553 (Rev.WRC-23)
|
Angola
,
Botswana
,
Kenya
,
Mauritius
,
Niger
,
Rwanda
,
South Africa
,
South Sudan
,
Tanzania
,
Zimbabwe
|
AI7
|
2025-04-23 |
|
[ 546 ]
|
FSS potential interference in one region into BSS plans in other regions
|
Angola
,
Botswana
,
Kenya
,
Mauritius
,
Niger
,
Rwanda
,
South Africa
,
South Sudan
,
Tanzania
,
Zimbabwe
|
AI7
|
2025-04-23 |
|
[ 545 ]
|
WRC-27 agenda item 1.6
|
Angola
,
Botswana
,
Kenya
,
Mauritius
,
Niger
,
Rwanda
,
South Africa
,
South Sudan
,
Tanzania
,
Zimbabwe
|
AI1.6
|
2025-04-23 |
|
[ 544 ]
|
Reply to comments from CEPT
|
Angola
,
Botswana
,
Kenya
,
Mauritius
,
Niger
,
Rwanda
,
South Africa
,
South Sudan
,
Tanzania
,
Zimbabwe
|
AI1.6
|
2025-04-23 |
|
[ 543 ]
|
Equitable access in the Q/V bands for non-GSO FSS
|
Angola
,
Botswana
,
Kenya
,
Mauritius
,
Niger
,
Rwanda
,
South Africa
,
South Sudan
,
Tanzania
,
Zimbabwe
|
AI1.6
|
2025-04-23 |
|
[ 542 ]
|
Real-world interference measurements in support of studies on epfd limits
|
Space Exploration Technologies Corp. (SpaceX)
|
|
2025-04-23 |
|
[ 541 ]
|
Considerations on FSS non-GSO characteristics for reply liaison statement to Working Party 5D
|
Telefon AB - LM Ericsson
,
Nokia Corporation
,
Qualcomm, Inc.
|
|
2025-04-23 |
|
[ 540 ]
|
Draft reply liaison statement to Working Party 5D - Relevant technical information to support studies under WRC-27 agenda item 1.7
|
Telefon AB - LM Ericsson
,
Nokia Corporation
,
Qualcomm, Inc.
|
AI1.7
|
2025-04-23 |
|
[ 539 ]
|
Studies for inclusion in the working document on WRC-27 agenda item 1.2 - Update to working document on WRC-27 agenda item 1.2
|
African Telecommunications Union
|
AI1.2
|
2025-04-23 |
|
[ 538 ]
|
Clarification on eligibility for submissions under Resolution 170 (Rev.WRC-23)
|
Angola
,
Botswana
,
Comoros
,
Dem. Rep. of the Congo
,
Eswatini
,
Lesotho
,
Madagascar
,
Malawi
,
Mauritius
,
Mozambique
,
Namibia
,
South Africa
,
Tanzania
,
Zambia
,
Zimbabwe
|
AI7
|
2025-04-23 |
|
[ 537 ]
|
Proposed topic under WRC-27 agenda item 7 - Proposed revision to Resolution 170 (Rev.WRC-23)
|
Angola
,
Botswana
,
Comoros
,
Dem. Rep. of the Congo
,
Eswatini
,
Lesotho
,
Madagascar
,
Malawi
,
Mauritius
,
Mozambique
,
Namibia
,
Seychelles
,
South Africa
,
Tanzania
,
Zambia
,
Zimbabwe
|
AI7
|
2025-04-23 |
|
[ 536 ]
|
Update to working document on WRC-27 agenda item 1.5
|
India
|
AI1.5
|
2025-04-23 |
|
[ 535 ]
|
Amendments to draft CPM text on WRC-27 agenda item 1.3
|
India
|
AI1.3
|
2025-04-23 |
|
[ 534 ]
|
Proposals for an ITU-R handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services
|
SES
|
|
2025-04-23 |
|
[ 533 ]
|
Elements for working document on WRC-27 agenda item 1.5 - Location and termination of unauthorized earth station transmissions
|
SES
|
AI1.5
|
2025-04-23 |
|
[ 532 ]
|
Study of the FSS Ku band epfd limits in Resolution 76 to protect geostationary satellites networks from non-geostationary satellite systems
|
SES
|
|
2025-04-23 |
|
[ 531 ]
|
Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)
|
France
|
AI1.2
|
2025-04-23 |
|
[ 530 ]
|
Elements to working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)
|
France
|
AI1.2
|
2025-04-23 |
|
[ 529 ]
|
Statistics on Resolution 40 (Rev.WRC-19)
|
Director, BR
|
|
2025-04-23 |
|
[ 528 ]
|
Information related to WRC-27 agenda item 1.5
|
Director, BR
|
AI1.5
|
2025-04-23 |
|
[ 527 ]
|
Elements of working document on WRC-27 agenda item 1.4
|
Director, BR
|
AI1.4
|
2025-04-23 |
|
[ 526 ]
|
Information concerning the situation of Appendices 30 and 30A additional uses in Regions 1 and 3
|
Director, BR
|
|
2025-04-23 |
|
[ 525 ]
|
Proposed revisions to working document towards a preliminary draft handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services
|
United States
|
|
2025-04-23 |
|
[ 524 ]
|
Proposed revisions to the working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-INTO-FSS]
|
United States
|
|
2025-04-23 |
|
[ 523 ]
|
Working document towards a preliminary draft revision to Report ITU-R BO.2029 - Broadcasting-satellite service earth station antenna pattern measurements and related analyses
|
United States
|
|
2025-04-23 |
|
[ 522 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R BO.1443-3 - Reference BSS earth-station radiation patterns for use in interference assessment involving non-GSO satellites in frequency bands covered by RR Appendix 30
|
United States
|
|
2025-04-23 |
|
[ 521 ]
|
Proposed updates to working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations
|
United States
|
|
2025-04-23 |
|
[ 520 ]
|
Study on the impact of additional non-GSO operational considerations on epfd statistics versus those generated using the method in Recommendation ITU-R S.1503
|
United States
|
|
2025-04-23 |
|
[ 519 ]
|
Proposed updates to working document towards a preliminary draft revision of Recommendation ITU-R S.1503-4 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations
|
United States
|
|
2025-04-23 |
|
[ 518 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO-NGSO] - Methodology to assess average degradation in throughput and increase in unavailability for a non-geostationary system, due to the interference caused by another non-geostationary system operating co-frequency for frequency ranges between 10.7 GHz and 52.4 GHz
|
United States
|
|
2025-04-23 |
|
[ 517 ]
|
Proposed revisions to the working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO-GSO]
|
United States
|
|
2025-04-23 |
|
[ 516 ]
|
Proposed updates to technical studies in response to WRC-23 minutes on Article 22 epfd limits
|
United States
|
|
2025-04-23 |
|
[ 515 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R S.1428-1 - Reference FSS earth-station radiation patterns for use in interference assessment involving non-GSO satellites in frequency bands between 10.7 GHz and 30 GHz
|
United States
|
|
2025-04-23 |
|
[ 514 ]
|
Working document related to a preliminary new Recommendation ITU-R S.[ESIM-NCMC] - The functionalities and implementation of a network control and monitoring center for Earth stations in motion
|
United States
|
|
2025-04-23 |
|
[ 513 ]
|
Proposed updates to working documents towards a preliminary draft new Recommendation ITU-R S.[AGGREGATE EPFD KA KU] and a preliminary draft revision of Recommendation ITU-R S.1325
|
United States
|
|
2025-04-23 |
|
[ 512 ]
|
Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)
|
United States
|
AI1.2
|
2025-04-23 |
|
[ 511 ]
|
Potential WRC-27 agenda item 7 topic regarding Resolution 40, repeated BIU/BBIU, satellite hopping and capabilities defined in No. 11.44B
|
United States
|
AI7
|
2025-04-23 |
|
[ 510 ]
|
Potential WRC-27 agenda item 7 topic on measures to address possible impact from R2 FSS operations to the AP30/30A Regions 1 and 3 BSS
|
United States
|
AI7
|
2025-04-23 |
Resultados :559 documentos Resultados :
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12
- Siguiente

|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):