Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP5D : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP5D  C 

UIT-R WP5D

Sistemas IMT

Resultados :1223 documentos
Resultados :  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1223 ]  
 
Request for updating Recommendation ITU-R M.1457 to Revision 15     European Telecommunications Standards Institute     2019-06-26
[ 1222 ]  
 
Update on activities in Region 2     Region 2 Rapporteur     2019-06-25
[ 1221 ]  
 
Liaison statement to Working Parties 1B, 5A, 5B and 5D on activities on wireless power transmission via radio frequency beam     WP 1A     2019-06-24
[ 1220 ]  
 
Reply liaison statement to ITU-R Working Parties 5A and 5D and ITU-T Study Group 15 and 3GPP TSG RAN (copy to ITU-R Working Parties 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Working document towards a preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems     WP 1A     2019-06-21
[ 1219 ]  
 
Reply liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A, 6B, 7A, 7B and 7D) - Liaison acitvities on the G.mgfast and G.fast - Power Spectral Density specifications     WP 1A     2019-06-21
[ 1218 ]  
 
Correspondence received regarding the update of Recommendation ITU-R M.2012 to Revision 3 ("Certification C")     Director, BR     2019-06-20
[ 1217 ]  
 
3GPP 5G candidate for inclusion in IMT-2020: Submission 2 for IMT-2020 (RIT)     Alliance for Telecommunications Industry Solutions     2019-06-17
[ 1216 ]  
 
3GPP 5G candidate for inclusion in IMT-2020: Submission 1 (SRIT)     Alliance for Telecommunications Industry Solutions     2019-06-17
[ 1215 ]  
 
3GPP final technology submission - Overview of 3GPP 5G solutions for IMT-2020     Alliance for Telecommunications Industry Solutions     2019-06-17
[ 1214 ]  
 
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Liaison between ITU-R and CISPR ont the protection of radio services in the 6-40 GHz frequency range     WP 1A     2019-06-18
[ 1213 ]  
 
Liaison statement to CISPR on EMC standards and limits (copy to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reducing EMI and RF noise     WP 1A     2019-06-18
[ 1212 ]  
 
Reply liaison statement to CISPR on EMC standards and limits (copy for information to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reproted cases of interference     WP 1A     2019-06-18
[ 1211 ]  
 
Draft new Report ITU-R M.[IMT.EXPERIENCES]     United States of America , Canada , Mexico     2019-06-18
[ 1210 ]  
 
Liaison statement on 3GPP activities in the frequency range above 52.6 GHz     Director, BR     2019-06-14
[ 1209 ]  
 
Liaison statement on working being carried out under study in ITU-T Study Group 5 Question 3/5     ITU-T SG 5     2019-06-14
[ 1208 ]  
 
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations     WP 1A     2019-06-14
[ 1207 ]  
 
Liaison statement to Working Party 5D (copy to Working Party 1A) - Test methods for over-the-air TRP measurements of IMT radio equipment utilizing active antennas     WP 1C     2019-06-13
[ 1206 ]  
 
Reply liaison statement to ITU-T Study Group 3 (copy to the Director of the Radiocommunication Bureau for communication to the Director of the Telecomunication Standardization Bureau) (also copy to ITU-R Working Parties 5A and 5D for information) - Comments on draft new Recommendation ITU-T D.264 (D.SpectrumShare)     SG 1     2019-06-12
[ 1205 ]  
 
Liaison statement to Working Party 5D - Determination of coordination zones around EESS and SRS earth stations     WP 7B     2019-06-11
[ 1204 ]  
 
Transposition references for draft Revision 4 of Recommendation ITU-R M.2012 (TSDSI)     Director, BR     2019-05-30
[ 1203 ]  
 
Liaison statement to Working Party 5D - Working document towards a preliminary draft new Report on possible coordination and protection measures for stations of the radio astronomy service from IMT Systems operating in shared and adjacent bands within 42.5 to 43.5 GHz     WP 7D     2019-05-31
[ 1202 ]  
 
Liaison statement ceoncerning document ITU-R SM.2351-2 and the work of ITU-T Q18/15 in smart grid networks     ITU-T SG 15     2019-05-30
[ 1201 ]  
 
Transposition references for draft Revision 4 of Recommendation ITU-R M.2012     European Telecommunications Standards Institute     2019-05-29
[ 1200 ]  
 
Transposition references for draft Revision 4 of Recommendation ITU-R M.2012 (TTC)     Director, BR     2019-05-28
[ 1199 ]  
 
Reply liaison statement to Working Party 5D - Co-channel sharing analysis involving IMT-Advanced systems using HAPS as base stations in accordance with RR No. 5.388A     WPs 3K and 3M     2019-05-27
[ 1198 ]  
 
Transpositions references for draft revision 4 of Recommendation ITU-R M.2012 (CCSA)     Director, BR     2019-05-24
[ 1197 ]  
 
Liaison statement from 3GPP proponent regarding IMT-2020 transposition timings in step 8 of IMT-2020 process     Alliance for Telecommunications Industry Solutions     2019-05-23
[ 1196 ]  
 
Transpositions references for draft revision 4 of Recommendation ITU-R M.2012 (TTA)     Director, BR     2019-05-15
[ 1195 ]  
 
Transposition references for draft revision 4 of Recommendation ITU-R M.2012     Association of Radio Industies and Businesses     2019-05-15
[ 1194 ]  
(Rev.1) 
Transposition references for draft Revision 4 of Recommendation ITU-R M.2012     Alliance for Telecommunications Industry Solutions     2019-05-09
[ 1193 ]  
 
Reply liaison statemen to Working Party 1A (copy to ITU-T Study Group 15 and ITU-R Working Parties 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems     WP 5A     2019-05-13
[ 1192 ]  
 
Reply liaison statement to Working Party 5D - Sharing and compatibility studies between IMT systems in 3 300 3 400 MHz and radiolocation systems in 3 100-3 400 MHz     WP 5B     2019-05-09
[ 1191 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations     WP 5C     2019-05-06
[ 1190 ]  
 
Liaison statement on Establishment of new Focus Group on Network Technologies for 2030 and beyond     ITU-T SG 13     2019-04-18
[ 1189 ]  
 
Liaison statement on strategies and policies concerning human exposure to EMF     ITU-D SG 2     2019-04-11
[ 1188 ]  
 
Liaison statement to ITU-R BT.2382-1 - Description of interference into a digital television receiver     WP 6A   Q132/6   2019-02-04
[ 1187 ]  
 
Liaison statement on further information on ITU-R Working Party 5D workshop on IMT-2020 terrestrial radio interfaces evaluation     3GPP TSG RAN     2019-03-25
[ 1186 ]  
 
Liaisons statement on ITU inter-Sector coordination     ITU-T SG 11     2019-03-21
[ 1185 ]  
 
Reply to liaison statement on strategies and policies for the deployment of broadband in developing countries     AT&T, Inc. , China Telecommunications Corporation , Huawei Technologies Co. Ltd. , NEC Corporation , Qualcomm, Inc. , Rohde & Schwarz GmbH & Co. KG , Samsung Electronics Co., Ltd. , Telecom Italia S.p.A. , Telefon AB - LM Ericsson , ZTE Corporation     2019-03-06
[ 1184 ]  
+Ch.1-7 
Report on the thirty-first bis meeting of Working Party 5D (Geneva, Switzerland, 11-15 February 2019)     Chairman, WP 5D     2019-02-18
[ 1183 ]  
 
Final list of participants - Working Party 5D (Geneva, 11-15 February 2019)     Director, BR     2019-02-15
[ 1182 ]  
 
Report on the recent activities of the Wireless World Research Forum (WWRF)     WWRF Liaison Rapporteur     2019-02-12
[ 1181 ]  
 
Update on recent activities within CEPT     ITU Region 1 (CEPT) Rapporteur     2019-02-11
[ 1180 ]  
 
Update Report on CITEL PCC.II activities     CITEL Rapporteur   Q229/5   2019-02-08
[ 1179 ]  
 
Initial response to liaison statement to registered independent evaluation groups     Telecom Centres of Excellence (TCOE)     2019-02-05
[ 1178 ]  
 
Update on activities in Region 3     Region 3 Rapporteur     2019-02-05
[ 1177 ]  
 
Revision of the Recommendation ITU-R M.1036-5     France     2019-02-04
[ 1176 ]  
 
Revision of footnote 5.441B of RR Article 5     France     2019-02-04
[ 1175 ]  
 
Characteristics of IMT-Advanced, IMT-2020 and Advanced Antenna Systems for ITU-R sharing and compatibility studies in the frequency band 3 300-3 400 MHz     France     2019-02-04
[ 1174 ]  
 
Proposed updates on the working document towards a preliminary draft new Report ITU-R M.[RADAR&IMT SHARING] - In band and adjacent band coexistence and compatibility studies between IMT systems in 3 300-3 400 MHz and radiolocation systems in 3 100-3 400 MHz     Thales SA     2019-02-04
Resultados :1223 documentos
Resultados :  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2019-06-27