Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP4C : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP4C  C 

UIT-R WP4C

Utilización Eficaz de la Orbita y del Espectro para el SMS y el SRDS

Resultados :474 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 74 ]  
(Rev.1) 
Reply liaison statement to Working Party 7D (copied for information to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and Task Group 5/1) - Propagation data and predictions for coexistence and compatibility studies above 50 GHz     WPs 3K and 3M     2016-07-04
[ 73 ]  
 
Reply liaison statement to Working Party 4C (copied for information to Working Party 5D) - Studies related to coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-1 518 MHz     WP 3M     2016-07-04
[ 72 ]  
 
Reply liaison statement to Working Party 5C (copied for information to Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and TG 5/1) - Propagation data and prediction methods required for coexistence and compatibility studies for High-Altitude Platform Stations (HAPS)     WP 3M     2016-07-04
[ 71 ]  
 
Reply liaison statement to Working Party 5D (copied for information to Working Party 4C) - Propagation data and predictions for coexistence and compatibility studies between the satellite and terrestrial components of IMT systems in the 2 GHz band     WPs 3K and 3M     2016-07-01
[ 70 ]  
 
Reply liaison statement to Working Parties 5B and 7B (copied to Working Parties 4A, 4C, 5A, 5C, 5D and 7D for information) - ITU-R propagation models for use in aeronautical propagation scenarios     WPs 3K and 3M     2016-07-01
[ 69 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz     WP 3J     2016-07-01
[ 68 ]  
 
Liaison statement to Working Parties 4A & 4C - Coordination of work on anticipated draft CPM text deadlines for WRC-19 agenda items / issues where Working Party 5D is a jointly responsible group     WP 5D     2016-06-29
[ 67 ]  
 
Liaison statement to Working Parties 4A, 4C, 6A and 7B (copied to Working Parties 3J, 3K, 3M and Task Group 5/1 for information) - Modelling and simulation of IMT networks for use in sharing and compatibility studies     WP 5D     2016-06-28
[ 66 ]  
 
Reply liaison statement to Working Party 4C - Co-existence and compatibility study between mobile satellite systems and terrestrial IMT-Advanced systems in the 2 GHz band in different countries     WP 5D     2016-06-28
[ 65 ]  
 
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7     WP 5D   AI1.7   2016-06-24
[ 64 ]  
 
Liaison statement to Working Party 4C - Technical measures to ensure coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-1 518 MHz     WP 5D     2016-06-23
[ 63 ]  
 
Liaison statement to Working Party 7B (copied to Working Parties 3M, 4C, 5A, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.3     WP 5D   AI1.3   2016-06-23
[ 62 ]  
 
Liaison response to Working Party 5A (copy to Working Parties 4A, 4B, 4C and ITU-T Study Group 17) - Network security requirements for Public Protection and Disaster Relief and Emergency Communication     WP 5D     2016-06-23
[ 61 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz     WP 1A     2016-06-13
[ 60 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing...     WP 1B     2016-06-13
[ 59 ]  
 
Liaison statement to Working Parties 5A and 5C on infrastructure sharing (copy to Working Parties 4C and 5C) - Innovative regulatory tools to support enhanced shared use of the spectrum     WP 1B   208-1/1   2016-06-13
[ 58 ]  
 
Liaison statement to Working Party 5D (copied for information to Task Group 5/1) - Propagation advice in support of agenda item 1.13: input requested from Working Party 5D     Chairmen, SG 3, WP 3J, WP 3K and WP 3M   AI1.13   2016-06-01
[ 57 ]  
 
Liaison statement to Working Parties 4A, 4C, 5B and 5C (copied for information to Working parties 1B, 3J, 3K, 3M and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16     WP 5A   AI1.16   2016-05-25
[ 56 ]  
 
Liaison response to ITU-T SG 17 (copy to Working Parties 4A, 4B, 4C and 5D) - Network security requirements for Public Protection and Disaster Relief and Emergency Communication     WP 5A     2016-05-25
[ 55 ]  
 
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7     WP 5A   AI1.7   2016-05-25
[ 54 ]  
 
Liaison statement to Working Party 7B (copied for information to Working Parties 3M, 4C, 5B, 5C, 5D and 6A) - Technical characteristics for WRC-19 agenda item 1.3     WP 5A   AI1.3   2016-05-25
[ 53 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Preparation for WRC-19 agenda item 1.13     TG 5/1   AI1.13   2016-05-25
[ 52 ]  
 
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5B and 6A) - WRC-19 agenda item 1.7     WP 5C   AI1.7   2016-05-24
[ 51 ]  
 
Liaison statement requesting technical characteristics for WRC-19 agenda item 1.9.2 from Working Parties 4C, 5A, 5C, 6A, 7B and 7D (copy to Working Parties 1A and 3M for information)     WP 5B     2016-05-23
[ 50 ]  
 
Liaison statement to Working Parties 3K & 3M (copy for information to Working Parties 5A, 5C, 5D, 4A, 4C, 7B and 7D) - Questions for Working Parties 3K and 3M on ITU-R propagation Recommendations used by Working Party 5B     WP 5B     2016-05-23
[ 49 ]  
 
Liaison statement to Working Party 4C - Introduction of additional mobile-satellite service systems into the Global Maritime Distress Safety System (GMDSS)     WP 5B     2016-05-23
[ 48 ]  
 
Liaison statement to ITU-R Working Parties 3M, 4A, 4C, 5A, 5D, 7B, 7C and 7D (for information to Task Group 5/1) - WRC-19 agenda item 1.14     WP 5C   AI1.14   2016-05-20
[ 47 ]  
 
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5C and 6A) - WRC-19 agenda item 1.7     WP 5B   AI1.7   2016-05-20
[ 46 ]  
 
Liaison statement to Telecommunication Standardization Advisory Group and ITU-R Working Party 4C     WP 5B     2016-05-18
[ 45 ]  
 
Liaison statement on Recommendation ITU-T K.106 (K.mhn)     ITU-T SG 5     2016-05-13
[ 44 ]  
 
Liaison statement to WP 5C concerning WRC-19 agenda item 1.14 - (copy to WP 4A, WP 4C, WP 5A, WP 5D, WP 7D, WP 3M for information)     WP 7B   AI1.14   2016-04-12
[ 43 ]  
+Ann.1-15 
Report on the meeting of Working Party 4C (Geneva, 6-12 April 2016)     Chairman, WP 4C     2016-04-12
[ 42 ]  
 
Final list of participants - Working Party 4C (Geneva, 6-12 April 2016)     Director, BR     2016-04-12
[ 41 ]  
 
Liaison statement to Working Party 5A (Working Parties 4A, 4C, 5B, and 5C copied for information) - Information pertaining to EESS (active) in the 5 GHz range to be considered under WRC-19 agenda item 1.16     WP 7C   AI1.16   2016-04-11
[ 40 ]  
 
Liaison statement to Working Party 5C for WRC-19 agenda item 1.14 sharing studies (copy to Working Parties 4A, 4C, 5A, 5D, 7D, 3M)     WP 7C   AI1.14   2016-04-11
[ 39 ]  
 
Liaison statement to Working Parties 3K and 3M (for action) and Study Group 5 and Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7C (for information)     WP 7D     2016-04-11
[ 38 ]  
 
Liaison statement to Working Parties 4C and 5B (copy to the Joint IMO/ITU Experts Group) - Compatibility of the radio astronomy service with satellite-provided global maritime distress and safety systems (WRC-19 AI 1.8)     WP 7D   AI1.8   2016-04-08
[ 37 ]  
 
Liaison statement requesting technical characteristics for WRC-19 agenda item 1.3 from Working Parties 4C, 5A, 5B, 5C, 5D and 6A (copy to Working Party 3M for information)     WP 7B     2016-04-07
[ 36 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C and 6A concerning WRC-19 agenda item 1.7 (copy for information to Working Party 1A, Working Party 3M and Working Party 4B) - WRC-19 agenda item 1.7     WP 7B   AI1.7   2016-04-07
[ 35 ]  
 
Liaison statement to Working Party 4C regarding WRC-19 agenda item 1.2 (copy to Working Parties 3M and 5A for information)     WP 7B     2016-04-07
[ 34 ]  
 
List of documents issued (Documents 4C/1 - 4C/34)     BR Study Groups Department     2016-04-05
[ 33 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties     Chairman, CCV     2016-04-01
[ 32 ]  
 
Proposed revisions to preliminary draft new Report ITU-R M.[ADS-MSS]     Inmarsat Plc.     2016-03-30
[ 31 ]  
 
Proposed updates to the coexistence and compatibility between the satellite and terrestrial components of IMT in the 2 GHz band     Inmarsat Plc.   201-1/4   2016-03-30
[ 30 ]  
 
Technical measures to ensure coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-2 518 MHz     Inmarsat Plc.     2016-03-30
[ 29 ]  
 
Agenda item 1.2 (WRC-19)     France     2016-03-30
[ 28 ]  
 
Draft liaison statement to Working Party 7C regarding preliminary draft new Recommendation ITU-R RS.[EESS_RNSS_METH]     France     2016-03-30
[ 27 ]  
 
Reply to liaison statement to ITU-T Study Group 9 - Coexistence of wired telecommunications and RNSS systems     France     2016-03-30
[ 26 ]  
 
[Preliminary] draft new Report ITU-R M.[ADS-MSS] - Use of existing mobile-satellite service systems for aircraft tracking     France     2016-03-30
[ 25 ]  
 
Protection criterion for MSS Earth Stations in the 1 518-1 525 MHz band     France     2016-03-30
Resultados :474 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2021-01-11