Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP4A : Contribuciones : 861 Nuevo -  Busque los documentos de la reunión
   
[861]  Proposed modifications to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing study between earth stations in motion operating with geostationary FSS networks and MS stations in the frequency band 27.5-29.5 GHz

Formato

Tamaño

Puesta a disposición

English

Word  

475834 octetos 2019-06-19 [861] 
 

Documento :

UIT-R WP4A  Contribución  861

Título :

Proposed modifications to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing study between earth stations in motion operating with geostationary FSS networks and MS stations in the frequency band 27.5-29.5 GHz

Recibido en :

2019-06-18

Origen :

China (People's Republic of)

AI/Cuestión :

AI1.5

Disponibilidad :

Restringido a usuarios de TIES [UIT-R]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2019-06-20