Contribuciones
Número
Título
Origen
AI/Cuestión
Filtro...
136-2/6
205/5
205-/5
205-5/5
209-4/5
212-4/5
215-4/5
230-3/5
238-2/5
240/5
241/5
241-1/5
241-2/5
37-5/5
48-6/5
48-7/5
Borrar filtro
Fecha
[ 494 ]
Geo-location databases as a mitigation technique for RLANs in the 5 350-5 470 MHz band
United Kingdom of Great Britain and Northern Ireland
2014-05-09
[ 493 ]
Proposed modifications to working document towards the draft CPM text for WRC-15 agenda item 1.4
Norway
2014-05-09
[ 492 ]
Proposed modifications to working document toward a preliminary draft new Report ITU-R M.[PPDR] - "Public protection and disaster relief communications"
Motorola Solutions Inc.
2014-05-09
[ 491 ]
Proposal and comment on the draft correspondence group report on N+W Parts of Report ITU-R M.[PPDR]
Motorola Solutions Inc.
2014-05-09
[ 490 ]
Proposal on Part 4 of working document toward a preliminary draft new Report ITU-R M.[PPDR]
Motorola Solutions Inc.
2014-05-09
[ 489 ]
Proposed revisions to working document towards a preliminary draft new Report ITU-R M.[5 MHz COMPAT] - Compatibility analysis of possible amateur systems with fixed/land mobile services in the frequency band 5 250-5 450 kHz
China (People's Republic of)
2014-05-09
[ 488 ]
Proposed revisions to working document towards draft CPM text for WRC-15 agenda item 1.4
China (People's Republic of)
2014-05-09
[ 487 ]
Proposed modification document towards a preliminary draft new Report ITU-R M.[PPDR]
China (People's Republic of)
2014-05-09
[ 486 ]
Proposal on revision to new PPDR Report - Working document toward a preliminary draft new Report ITU-R M.[PPDR] - "Broadband public protection and disaster relief communications"
China (People's Republic of)
2014-05-09
[ 485 ]
System characteristics and deployment information for land mobile systems operating around 406MHz band - WRC-15 agenda item 9.1, issue 9.1.1
China (People's Republic of)
2014-05-09
[ 484 ]
Liaison statement to ITU-R Working Party 5A on the technologies for public protection and disaster relief communications associated with work on WRC-15 agenda item 1.3
Director, BR
2014-05-09
[ 483 ]
Proposed draft liaison statement to Working Paty 1B on spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities
Canada
2014-05-08
[ 482 ]
Working document towards a preliminary draft new Report ITU-R M.[5 MHz COMPAT]
United States of America
2014-05-08
[ 481 ]
(Rev.1)
Characteristics of and protection criteria for mobile systems operating in the frequency range 14.5-15.35 GHz
United States of America
2014-05-08
[ 480 ]
Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.6
United States of America
2014-05-08
[ 479 ]
Proposed liaison reply to Working Party 1B, regarding working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]
United States of America
2014-05-08
[ 478 ]
Working document towards a preliminary draft Report on operational guidelines for the deployment of broadband mobile systems for local coverage in the frequency bands below 6 GHz
United States of America
2014-05-08
[ 477 ]
Proposal to resolve editor's notes in Section 5.2.5 of the preliminary draft new Report ITU-R [LMS.CRS2]
United States of America
2014-05-08
[ 476 ]
Working document towards the draft CPM text for WRC-15 agenda item 1.4
United States of America
2014-05-08
[ 475 ]
Working document towards the preliminary draft CPM text for WRC-15 agenda item 1.3
United States of America
2014-05-08
[ 474 ]
Working document towards a preliminary draft new Report ITU-R M.[PPDR] - "Public protection and disaster relief communications"
United States of America
2014-05-08
[ 473 ]
Review of the Study Group 5 Questions assigned to the Working Parties
Chairman, SG 5
2014-05-08
[ 472 ]
Proposed revisions to the working document towards the preliminary draft CPM text or WRC-15 agenda item 1.3
Motorola Solutions Inc.
,
Telefon AB - LM Ericsson
2014-05-08
[ 471 ]
Proposed modifications to working document towards the draft CPM text for WRC-15 agenda item 1.4
Netherlands (Kingdom of the)
2014-05-08
[ 470 ]
Proposed modifications to working document towards a preliminary draft new Report ITU-R M.[PPDR] - "Public protection and disaster relief communications"
Israel (State of)
2014-05-08
[ 469 ]
Studies on WRC-15 agenda item 1.16 in particular a compatibility with mobile service for which 160 MHz band is allocated on a primary basis
Russian Federation
2014-05-08
[ 468 ]
Proposals on update of working document towards a preliminary draft new Report ITU-R M.[5 MHz COMPAT] - Compatibility analysis of possible amateur systems with fixed, land mobile, maritime mobile and radiolocation services in the frequency band 5 250-5 450 kHz and the aeronautical mobile service in an adjacent band
Russian Federation
2014-05-08
[ 467 ]
Proposals on update of working document towards the draft CPM text for WRC-15 agenda item 1.4
Russian Federation
2014-05-08
[ 466 ]
Working document towards revision of Resolution 646 for broadband mobile public protection and disaster relief (PPDR) under WRC15 agenda item 1.3
Israel (State of)
2014-05-05
[ 465 ]
An examination of possible mitigation techniques to address sharing between EESS (active) and RLANS in the band 5 350-5 470 MHz
Canada
2014-05-01
[ 464 ]
Proposed draft reply liaison statement to Working Party 1B - WRC-15 agenda item 9.1, issue 9.1.7
Canada
2014-05-01
[ 463 ]
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5C, 5D, ITU-T Study Group 15 Question 1 and ITU-T Study Group 13 Question 15 - Access technology for broadband telecommunications including IMT, for developing countries
ITU-D SG 2
2014-04-29
[ 462 ]
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, Joint Task Group 4-5-6-7 and the Special Committee as responsible Groups for WRC-15 agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2., 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)
World Meteorological Organization
2014-04-28
[ 461 ]
Liaison statement on new versions of the Access Network Transport (ANT) standardization overview and work plan
ITU-T SG 15
2014-04-22
[ 460 ]
Liaison statement on considerations on wired telecommunication systems being developed under G.fast
ITU-T SG 15
2014-04-22
[ 459 ]
Liaison statement to Working Party 5A - Working document toward a preliminary draft new Report ITU-R M.[ITS_USAGE] - The usage of Intelligent Transport Systems in ITU-R member countries
Asia-Pacific Telecommunity
2014-04-16
[ 458 ]
Liaison statement to ITU-R Working Party 5A - The proposed revision of Recommendation ITU-R M.2015 (Frequency arrangements for public protection and disaster relief radiocommunication systems in UHF bands in accordance with Resolution 646 (Rev. WRC-12)) and the proposed revision of Recommendation ITU-R M.2009 (Radio interface standards for use by public protection and disaster...
Asia-Pacific Telecommunity
2014-04-16
[ 457 ]
Report
CG on Rep. M.[PPDR]
2014-04-15
[ 456 ]
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4B, 4C, 5A, 5C and 5D) - Development of draft new Recommendation on main functionalities of consumer receivers for worldwide broadcasting roaming
WP 6A
2014-04-11
[ 455 ]
Liaison statement to Working Party 1A - Copy to Working Parties 1C, 5A, 5B, 5C and ITU-T Study Group 5 - Recommendations ITU-T K.60 and K.mhn - Coexistence of wired and wireless communication systems
WP 6A
2014-04-10
[ 454 ]
Liaison statement to Working Party 5A (copy for information to Working Parties 5C and 5D) - The use of mobile broadband networks for Electronic news gathering (ENG) applications in the mobile service
WP 6A
2014-04-10
[ 453 ]
Liaison statement on IoT-Roadmap, IoT-work program, contacts and invitation to participate in IoT-GSI events
ITU-T JCA-IoT
2014-04-09
[ 452 ]
Liaison statement on fixed service backhaul networks for IMT and other terrestrial mobile broadband systems
ITU-T SG 13
2014-04-07
[ 451 ]
Liaison statement to Working Party 5A - WRC-15 agenda item 9.1, issue 9.1.1
WP 4C
2014-03-24
[ 450 ]
Liaison statement to Working Parties 3M, 4A, 4B 5A, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10
WP 4C
2014-03-24
[ 449 ]
Liaison statement to Working Parties 3M, 4A, 4B 5A, 5B, 5C and 7B - WRC-15 agenda item 1.9.2
WP 4C
2014-03-24
[ 448 ]
Reply liaison statement to Working Party 5C (copy to Working Parties 5A and 7B for information) WRC-15 agenda item 1.9.1
WP 4A
2014-03-07
[ 447 ]
Liaison statement to Working Party 5A - WRC-15 agenda item 1.6
WP 4A
2014-03-07
[ 446 ]
Liaison statement to Working Parties 5A, 5B and 7C - Possible mitigation techniques to address interference to EESS (active) and radiodetermination from the potential use of the frequency band 5 350-5 470 MHz by RLANs
JTG 4-5-6-7
2014-03-07
[ 445 ]
Liaison Statement/r on the ITU-T G.fast physical layer specification (ITU-T G.9701) (reply to ITU-R Liaison Statement 21)
ITU-T SG 15
2014-03-03
Resultados :744 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
- Siguiente
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):