Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP4A : Contribuciones : 242 Nuevo -  Busque los documentos de la reunión
   
[242]  Report on the meeting of Working Party 4A (Geneva, 2-10 May 2013)

Formato

Tamaño

Puesta a disposición

English

Word  

53381 octetos 2013-05-31 [242] Annex 36- List of liaison statements to ITU-R Groups

Word  

63239 octetos 2013-05-27 [242] Annex 35- Note to the Director, Radiocommunication Bureau - Examination under § 2.2 of Annex 4 of RR Appendix 30B - Over protection of grid points at locations with low gain of the satellite antenna

Word  

64449 octetos 2013-05-24 [242] Annex 34- Elements for future discussion and development related to WRC-15 Agenda item 9.1, Issue 9.1.2

Word  

525896 octetos 2013-05-24 [242] Annex 33- Possible option on overhauling the radio regulation regime governing space services - WRC-15 Agenda item 7

Word  

156061 octetos 2013-05-23 [242] Annex 32- Possible elements for the Director's Report related to the experience in the application of the radio regulatory procedures and other related matters - Review of the provisions associated with the use of the band 15.4-15.7 GHz by the FSS (Earth-to-space and space-to-Earth)

Word  

55130 octetos 2013-05-23 [242] Annex 31- Working document - Draft CPM text on WRC-15 Agenda item 9.1, Issue 9.1.5

Word  

1178955 octetos 2013-05-22 [242] Annex 30- Working document - Draft CPM text On WRC-15 Agenda item 9.1, Issue 9.1.2

Word  

48166 octetos 2013-05-22 [242] Annex 29- Working document - Work plan for WRC-15 Agenda item 9.1, Issue 9.1.2

Word  

68348 octetos 2013-05-22 [242] Annex 28- Working document - Draft CPM text for WRC-15 Agenda item 1.9.1

Word  

46573 octetos 2013-05-22 [242] Annex 27- Working document - Work plan for WRC-15 Agenda item 1.9.1

Word  

59904 octetos 2013-05-22 [242] Annex 26- Working document - Draft CPM text on WRC-15 Agenda item 1.8

Word  

48272 octetos 2013-05-22 [242] Annex 25- Working document - Work plan for WRC-15 Agenda item 1.8

Word  

86181 octetos 2013-05-16 [242] Annex 24- Working document - Draft CPM text on WRC-15 Agenda item 1.7

Word  

45893 octetos 2013-05-22 [242] Annex 23- Working document - Work plan for WRC-15 Agenda item 1.7

Word  

75732 octetos 2013-05-22 [242] Annex 22- Working document - Outline and preliminary material for the draft CPM Report to WRC-15 for Agenda item 1.6.1 and 1.6.2

Word  

48707 octetos 2013-05-22 [242] Annex 21- Working document - Work plan for WRC-15 Agenda item 1.6

Word  

11141012 octetos 2013-05-16 [242] Annex 20- Working document - [Some elements of a] working document towards a preliminary draft new Report ITU-R S.[ESV] on the interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on terrestrial co-frequency stations

Word  

302168 octetos 2013-05-28 [242] Annex 19- Working document towards a preliminary draft new [guideline recommendation, with the condition thereto,] ITU-R S.[GSO FSS E/S in 29.5-30.0/19.7-20.2 GHz]- Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 19.7-20.2 GHz and 29.5-30.0 GHz

Word  

46395 octetos 2013-05-24 [242] Annex 18- Working Document-Technical and operational studies towards developing elements to be included in Report ITU-R S.2223 regarding earth stations on mobile platforms in the 17.3-19.7 and 27.5-29.5 GHz bands of the geostationary satellite orbit fixed-satellite service

Word  

60603 octetos 2013-05-22 [242] Annex 17- Working document on framework for a preliminary draft new possible guideline Rcommendation, and conditions thereto, or Report ITU-R S.[FSS-Ref_for_UAS] - WRC-15 Agenda item 1.5

Word  

1269588 octetos 2013-07-24 [242] Annex 16- Working document - Technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7

Word  

173512 octetos 2013-05-22 [242] Annex 15- Working document - Information related to WRC-15 Agenda item 9.1, Issue 9.1.2 - Size of the coordination arc for triggering coordination under RR No. 9.7 in the 29.5-30.0 GHz/19.7-20.2 GHz bands

Word  

111546 octetos 2013-05-22 [242] Annex 14- Working document - Possible revision of Recommendation ITU-R S.1432-1 and development of long-term and short term interference criteria

Word  

49296 octetos 2013-05-22 [242] Annex 13- Working Document - Draft liaison statement to the Working Party of the Special Committee

Word  

48860 octetos 2013-05-27 [242] Annex 12- Working document - Consequences for late notification under RR No. 11.49

Word  

53203 octetos 2013-05-24 [242] Annex 11- Working document towards a preliminary draft revision of Report ITU-R S.2261 (annex - esomps ON VESSELS)- Guidelines that could be used by Administrations wishing to license ESOMPs mounted on vessels and operating in non-GSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services

Word  

47975 octetos 2013-05-24 [242] Annex 10- Working document towards a preliminary draft revision of Report ITU-R S.2261 (Annex - [AIRBORNE] ESOMPs) - Guidelines that could be used by Administrations wishing to license [airborne] ESOMPs operating in non-GSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services

Word  

85986 octetos 2013-05-22 [242] Annex 09- Working document towards a Preliminary draft revision of Report ITU-R BO.2007-1 - Considerations for the introduction of broadcasting-satellite service high-definition television systems

Word  

9287915 octetos 2013-05-16 [242] Annex 08- Working document towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHz COMPATIBILITY] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)

Word  

86330 octetos 2013-05-22 [242] Annex 07- Working document towards a preliminary draft new Report ITU-R S.[FSS.DEPLOYMENT] - Fixed-satellite service parameters and deployment in the 10-17 GHz band for the GSO fixed-satellite service

Word  

6457244 octetos 2013-05-16 [242] Annex 06- Working document towards a Preliminary Draft New Report ITU-R S.[R2R3.FSS]- Assessment on use of spectrum in the 13-17 GHz range for Working document towards a Preliminary Draft New Report ITU-R S.[R2R3.FSS]- Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3

Word  

6532999 octetos 2013-05-16 [242] Annex 05- Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the GSO fixed-satellite service in Region 1

Word  

57886 octetos 2013-05-22 [242] Annex 04- Working document towards a preliminary draft new Recommendation ITU-R S.[ALT.RAD.PTTRN] - Alternative reference radiation pattern of earth station antennas in the fixed satellite service for use in coordination and interference assessment in the frequency range from 2 to 31 GHz

Word  

1309292 octetos 2013-05-22 [242] Annex 03- Working document towards a preliminary draft new Recommendation ITU R BO.[IMPR_BSS_REF_ANT_DIAG]- Improved BSS receiving earth stations reference antenna radiation pattern for RR Appendix 30 Regions 1 and 3 networks

Word  

51566 octetos 2013-05-22 [242] Annex 02- Working document towards a preliminary draft new Recommendation ITU-R SF.[AREA COORD] - Possible methodology for frequency sharing between ubiquitously deployed earth stations of the fixed-satellite service and terrestrial services in adjacent areas

Word  

3588055 octetos 2013-05-31 [242] Annex 01- Preliminary draft revision of Recommendation ITU-R S.1503-1 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite system networks with limits contained in Article 22 of the Radio Regulations

Word  

208306 octetos 2013-06-03 [242] - Report on the meeting of Working Party 4A (Geneva, 2-10 May 2013)
 

Documento :

UIT-R WP4A  Contribución  242

Título :

Report on the meeting of Working Party 4A (Geneva, 2-10 May 2013)

Recibido en :

2013-05-10

Origen :

Chairman, WP 4A

Disponibilidad :

Restringido a usuarios de TIES [UIT-R]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2013-07-24