Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP3K : Contribuciones : 29 Nuevo -  Busque los documentos de la reunión
   
[29]  Report on the meeting of Working Party 3K (Geneva, 18 - 27 June 2012)

Formato

Tamaño

Puesta a disposición

English

Word  

60926 octetos 2012-09-13 [29] Annex 10- List of output documents

Word  

4498994 octetos 2012-09-13 [29] Annex 09- Items retained from the Chairman's report for the meeting of Working Party 3K (Geneva, 17-26 october 2011)

Word  

64052 octetos 2012-07-04 [29] Annex 08- Propagation data and prediction method required for the design of land-mobile to land-mobile telecommunication systems

Word  

2827450 octetos 2012-07-04 [29] Annex 07- Preliminary draft revision of Recommendation ITU-R P.1411 - Propagation data and prediction methods for the planning of short-range outdoor radiocommunication systems and radio local area networks in the frequency range 300 MHz to 100 GHz

Word  

86583 octetos 2012-07-04 [29] Annex 06- Preliminary draft revision of Recommendation ITU-R P.1238-7 - Propagation data and prediction methods for the planning of indoor radiocommunication systems and radio local area networks in the frequency range 900 MHz to 100 GHz

Word  

3428880 octetos 2012-07-04 [29] Annex 05- A possible approach for the working document toward preliminary draft revision of Recommendation ITU-R P.1546 - Method for point-to-area predictions for terrestrial services in the frequency range 30 MHz to 3 000 MHz

Word  

64811 octetos 2012-07-05 [29] Annex 04- List of Correspondence Group members

Word  

50325 octetos 2012-07-04 [29] Annex 03- Editorial corrections to Recommendation ITU-R P.1546-4

Word  

107886 octetos 2012-07-04 [29] Annex 02- Documents to be carried forward to the next meeting of Working Party 3K: Recommendation ITU-R P.1546

Word  

55820 octetos 2012-07-04 [29] Annex 01- Proposed editorial corrections in Recommendation ITU-R P.1812-2

Word  

101026 octetos 2012-09-13 [29] - Report on the meeting of Working Party 3K (Geneva, 18-27 June 2012)
 

Documento :

UIT-R WP3K  Contribución  29

Título :

Report on the meeting of Working Party 3K (Geneva, 18 - 27 June 2012)

Recibido en :

2012-07-04

Origen :

Chairman, WP 3K

Disponibilidad :

Restringido a usuarios de TIES [UIT-R]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2012-09-13