Contribuciones  |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 603 ]
|
Liaison statement to Working Parties 5A, 5B, 5C and 5D
|
WP 3K
|
|
2011-11-30 |
|
[ 602 ]
+Ann.1-13 |
Report of the eighth meeting of Working Party 5C (Geneva, 8 - 16 November 2011)
|
Chairman, WP 5C
|
|
2011-11-16 |
|
[ 601 ]
|
Reply liaison statement to Working Party 5C regarding the selection of "tuning ranges" for electronic news gathering ("ENG") equipment
|
WP 5B
|
|
2011-11-16 |
|
[ 600 ]
|
Final List of Participants - Working Party 5C (Geneva, 8-16 November 2011)
|
Director, BR
|
|
2011-11-16 |
|
[ 599 ]
|
List of documents issued
|
BR Study Group Department
|
|
2011-11-07 |
|
[ 598 ]
|
ITU-R Study Group 1 Question to be brought to the attention of Study Groups 4, 5, 6 and 7
|
BR Study Group Department
|
|
2011-11-03 |
|
[ 597 ]
|
Liaison statement response on new revision of Report ITU-R F.2060 - Fixed service use in the IMT transport network
|
ITU-T SG 13
|
|
2011-11-03 |
|
[ 596 ]
|
Preliminary draft new Question ITU-R [FS USE-TRENDS]/5 - Fixed service use and future trends
|
United Kingdom of Great Britain and Northern Ireland
|
|
2011-11-01 |
|
[ 595 ]
|
Sharing and compatibility issues between ENG systems in frequency bands allocated to the fixed and mobile services
|
Free TV Australia Ltd.
|
|
2011-11-01 |
|
[ 594 ]
|
Report on progress of studies for harmonisation of spectrum for electronic news gathering
|
Free TV Australia Ltd.
|
|
2011-11-01 |
|
[ 593 ]
|
Proposed candidate harmonized frequency bands/tuning ranges for cross border deployment of ENG
|
Free TV Australia Ltd.
|
|
2011-11-01 |
|
[ 592 ]
|
Review of the Questions assigned to Working Party 5C
|
Japan
|
|
2011-11-01 |
|
[ 591 ]
|
Draft new Question ITU-R [FS USE-TRENDS]/5 - Fixed service use and future trends
|
Japan
|
|
2011-11-01 |
|
[ 590 ]
|
Proposed modifications to preliminary draft new Recommendation ITU-R F.[71-86 GHz] - Radio-frequency channel arrangements for fixed wireless systems operating in the 71-76 and 81-86 GHz bands
|
Japan
|
|
2011-11-01 |
|
[ 589 ]
|
Draft revision of Report ITU-R F.2107-1 - Characteristics and applications of fixed wireless systems operating in frequency ranges between 57 GHz and 134 GHz
|
Japan
|
|
2011-11-01 |
|
[ 588 ]
|
Proposals for updating of Recommendations ITU-R F.383-8, F.635-6 and F.1099-4
|
Japan
|
247/5
|
2011-11-01 |
|
[ 587 ]
|
Proposed modifications to preliminary draft revision of Recommendation ITU-R F.1336-2 - Reference radiation patterns of omnidirectional, sectoral and other antennas in point-to-multipoint systems for use in sharing studies in the frequency range from 1 GHz to about 70 GHz
|
Japan
|
242/5
|
2011-11-01 |
|
[ 586 ]
|
Future framework for studies on electronic news gathering (ENG) within Working Party 5C
|
Australia
|
|
2011-11-01 |
|
[ 585 ]
|
Proposal for modification of working document towards a preliminary draft new Handbook ITU-R F.[CROSS-BORDER] - Guidance for bilateral/multilateral discussions on use frequency range 29.7 MHz - 43.5 GHz ] by fixed/land mobile systems
|
Russian Federation
|
|
2011-10-28 |
|
[ 584 ]
|
Frequency bands used by the Administration of the Russian Federation to meet its national requirements for electronic news gathering (ENG)
|
Russian Federation
|
|
2011-10-31 |
|
[ 583 ]
|
Draft new Recommendation ITU-R F.[92-95 GHz] - Radio-frequency channel arrangements for fixed service systems operating in the 92-95 GHz range
|
Russian Federation
|
|
2011-10-31 |
|
[ 582 ]
|
Proposal for preliminary draft revision of Recommendation ITU-R F.339-7 - Bandwidths, signal-to-noise ratios and fading allowances in complete systems
|
Canada
|
|
2011-10-29 |
|
[ 581 ]
|
Revision of Recommendation ITU-R F.1245-1 - Mathematical model of average radiation patterns for line-of-sight point-to-point radio-relay system antennas for use in certain coordination studies and interference assessment in the frequency range from 1 GHz to about 70 GHz
|
Canada
|
|
2011-10-29 |
|
[ 580 ]
|
Coexistence between fixed service systems operating in 71-76 GHz, 81-86 GHz and 92-94 GHz bands and passive service systems
|
Canada
|
|
2011-10-29 |
|
[ 579 ]
|
Proposal for a preliminary draft new Report - Reliability calculations for adaptive HF fixed service network
|
Canada
|
|
2011-10-29 |
|
[ 578 ]
|
Preliminary draft new Report ITU-R [SF].[STATMETH] - Example of a possible mathematical implementation of a methodology to use statistical variables as inputs in simulating the interference from FSS and BSS satellites to FS stations in frequency bands above about 17 GHz
|
Finland
|
|
2011-10-28 |
|
[ 577 ]
|
Draft liaison statement to Working Party 4A - Statistical methodology for assessing the interference of the satellite services on a fixed service deployment above 17 GHz [STATEMETH]
|
Finland
|
|
2011-10-28 |
|
[ 576 ]
|
Preliminary draft new Report ITU-R F.[FS/PASSIVE - 70-80 GHz] - Coexistence between fixed service operating in 71-76 GHz, 81-86 GHz and 92-94 GHz bands and the Radio astronomy service allocated on a primary basis in 76-77.5 GHz and 79-94 GHz
|
France
|
|
2011-10-28 |
|
[ 575 ]
|
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Handbook on "Propagation information for the prediction of interference and coordination distance"
|
SG 3
|
|
2011-10-31 |
|
[ 574 ]
|
Working document towards a draft new Report ITU-R F.[FS-SDR] on the impact of sotware defined radio (SDR) and cognitive radio systems (CRS) on the fixed service
|
United States of America
|
|
2011-10-26 |
|
[ 573 ]
|
Amendments to the preliminary draft new Report ITU-R F.[HAPS MODELLING] - Interference analysis modelling for sharing between HAPS gateway links in the fixed service and other systems/services in the range 5 850 - 7 075 MHz
|
United States of America
|
|
2011-10-26 |
|
[ 572 ]
|
Comments on PDNR ITU-R [SF].[STATMETH]
|
United States of America
|
|
2011-10-26 |
|
[ 571 ]
|
Proposed revisions to Annex 18 to Working Party 5C Chairman's Report
|
United States of America
|
|
2011-10-26 |
|
[ 570 ]
|
Discussion on working document towards a preliminary draft revision of Report ITU-R F.2060 - Fixed service use in the IMT transport network
|
United States of America
|
|
2011-10-26 |
|
[ 569 ]
|
Draft revisions to Recommendations ITU-R F.1247-2, ITU-R F.1249-2 and ITU-R F.1509-1
|
United States of America
|
|
2011-10-26 |
|
[ 568 ]
|
Liaison statement to Working Party 5C - Status of studies in support of WRC-12 Agenda item 1.5
|
WP 7D
|
|
2011-10-27 |
|
[ 567 ]
|
Preliminary draft new Report ITU-R F.[HAPS MODELLING] - Interference analysis modelling for sharing between HAPS gateway links in the fixed service and other systems/services in the range 5 850-7 075 MHz
|
Korea (Republic of)
|
|
2011-10-26 |
|
[ 566 ]
|
Proposed revision of draft new Recommendation ITU-R F.[71-86 GHZ] - Radio-frequency block arrangements for fixed wireless systems operating in the 71-76 and 81-86 GHz bands
|
Korea (Republic of)
|
247/5
|
2011-10-26 |
|
[ 565 ]
|
Proposal for revision of Recommendation ITU-R F.386-8 - Radio-frequency channel arrangements for fixed wireless systems operating in the 8 GHz (7 725 to 8 500 MHz) band
|
Sweden
|
|
2011-10-25 |
|
[ 564 ]
|
Liaison statement to Working Party 5C - Consideration of draft revision of Recommendation ITU-R F.758-4
|
WP 3M
|
|
2011-10-26 |
|
[ 563 ]
|
Liaison statement to Working Party 5C - Preliminary draft new Report ITU-R F.[HAPS MODELLING] - Interference analysis modelling for sharing between HAPS gateway links in the fixed service and other systems/services in the range 5 850-7 075 MHz
|
WP 3M
|
|
2011-10-26 |
|
[ 562 ]
|
Liaison statement to Working Party 5C - Proposed adaptive systems tutorial Handbook
|
WP 3L
|
|
2011-10-26 |
|
[ 561 ]
|
Liaison statement to Working Party 5C - Outline of proposed Handbook on terrestrial radiocommunications at frequencies below about 30 MHz
|
WP 3L
|
|
2011-10-26 |
|
[ 560 ]
|
Liaison statement to Working Party 5C - Radio noise in the HF band
|
WP 3L
|
|
2011-10-26 |
|
[ 559 ]
|
Liaison statement to Working Party 5C - On Agenda item 1.5 studies - Harmonization of spectrum for use by terrestrial electronic news gathering systems
|
WP 5D
|
|
2011-10-21 |
|
[ 558 ]
|
Liaison response to Working Party 5C and ITU-T Study Groups 13 and 15, on "Revision of Report ITU-R F.2060 - Fixed service use in the IMT transport network"
|
WP 5D
|
|
2011-10-21 |
|
[ 557 ]
|
Liaison Statement to ITU-R Working Party 5C (copy to Working Parties 5A and 5D for information) - Access technology for broadband telecommunications including IMT, for developing countries
|
ITU-D SG2
|
|
2011-10-21 |
|
[ 556 ]
|
Proposed revision to Report ITU-R F.[FS/PASSIVE - 70-80 GHZ]
|
France
|
|
2011-10-17 |
|
[ 555 ]
|
Liaison statement to Working Party 5C - Proposed revisions to Recommendation ITU-R F.758
|
WP 7B
|
|
2011-10-13 |
|
[ 554 ]
|
Liaison statement to Working Party 5C - In response to Working Party 5C liaison regarding development of Recommendations ITU-R SA.1275-3 and ITU-R SA.1276-3
|
WP 7B
|
|
2011-10-13 |
Resultados :603 documentos Resultados :
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13
- Siguiente

|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):