Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP4A : Contribuciones : 197 Nuevo -  Busque los documentos de la reunión
   
[197]  Report on the meeting of Working Party 4A (Geneva, 27 April to 5 May 2009)

Formato

Tamaño

Puesta a disposición

English

Word  

143872 octetos 2009-05-29 [197] Annex 23- List of liaison statements to ITU-R Groups

Word  

137216 octetos 2009-05-29 [197] Annex 22- Preliminary working document towards implementation of Resolution 80 (Rev.WRC-07) - Stage 1 of the Working Party 4A work plan

Word  

275968 octetos 2009-05-15 [197] Annex 21- Working document towards the development of draft CPM text on WRC-11 Agenda item 1.13

Word  

210944 octetos 2009-05-15 [197] Annex 20- Revision of the Work Plan for WRC-11 Agenda item 1.13 - Use of the band 21.4-22 GHz for broadcasting-satellite service and associated feeder-link bands in Regions 1 and 3

Word  

103424 octetos 2009-05-29 [197] Annex 19- Executive summary on the status of preparations under WRC-11 Agenda item 1.13

Word  

110080 octetos 2009-05-28 [197] Annex 18- Working document - possible revision of Recommendation ITU-R BO.1785

Word  

590336 octetos 2009-05-28 [197] Annex 17- Working document - Information in consideration of WRC-11 Agenda Item 1.22

Word  

104960 octetos 2009-05-28 [197] Annex 16- Working Document on balancing the existing FSS spectrum allocations in ITU Region 2 and Region 3 in the 10-15 GHz band

Word  

21445120 octetos 2009-05-29 [197] Annex 15- Working document towards a preliminary draft revision of Report ITU-R BO.2071 - System parameters of BSS between 17.3 GHz and 42.5 GHz and associated feeder links

Word  

1366528 octetos 2009-05-18 [197] Annex 14- Working document towards a Preliminary draft revision of Recommendation ITU-R BO.1659 - Mitigation techniques for rain attenuation for broadcasting-satellite service systems in frequency bands between 17.3 GHz and 42.5 GHz

Word  

172032 octetos 2009-05-29 [197] Annex 13- Working document towards a preliminary draft revision of Recommendation ITU-R BO.1776 - Reference power flux-density for the broadcasting-satellite service in the band 21.4-22 GHz in Regions 1 and 3

Word  

297984 octetos 2009-05-29 [197] Annex 12- Working document towards a preliminary draft revision of Recommendation ITU-R S.732 - Method for statistical processing of earth station antenna side-lobe peaks

Word  

729088 octetos 2009-05-15 [197] Annex 11- Working document toward a preliminary draft new Recommendation ITU R [SF].[STATMETH] - Methodology for statistically calculating the interference received by the fixed service from space-to-Earth emissions for frequency bands above about 17 GHz

Word  

413184 octetos 2009-05-18 [197] Annex 10- Working documents towards a preliminary draft new Recommendation and/or Report - C/(N+I) coordination methodology

Word  

196096 octetos 2009-05-18 [197] Annex 09- Working document towards a PDN Recommendation ITU-R BO.[BSS(S) INTERF CRITERIA SAT]

Word  

149504 octetos 2009-05-29 [197] Annex 08- Working document towards a preliminary draft new Recommendation ITU-R BO.[BSS(S) TECH CHAR SAT] - Technical characteristics of broadcasting-satellite service (sound) satellite networks in the band 1 467-1 492 MHz

Word  

3978240 octetos 2009-05-29 [197] Annex 07- Preliminary draft new Report ITU-R S.[ADAP_ARRAY] - An interference reduction technique by adaptive-array earth station antennas for sharing between fixed-satellite service (FSS) and fixed/mobile services

Word  

1215488 octetos 2009-05-18 [197] Annex 06- Modification to preliminary draft new Report ITU-R S.[MAIN LOBE] - Methodology on the modelling of earth station antenna gain in the region of the antenna main lobe and the transition region between the minimum angle of the reference antenna pattern and t

Word  

3672576 octetos 2009-05-11 [197] Annex 05- Preliminary draft new Report ITU-R S.[BWA-FSS] - Studies on compatibility of broadband wireless access (BWA) systems and fixed-satellite service (FSS) networks in the 3 400-4 200 MHz band

Word  

293888 octetos 2009-05-29 [197] Annex 04- Preliminary draft new Report ITU-R S.[GUIDE_PLAN] - Guidelines that maybe used by administrations in the design of their systems for assessing the impact of rain attenuation on the carrier to noise plus interference ratios of the FSS Plan allotments

Word  

13757952 octetos 2009-06-12 [197] Annex 03- Preliminary draft revision of Recommendation ITU-R S.1001-1 - Use of systems in the fixed-satellite service in the event of natural disasters and similar emergencies for warning and relief operations

Word  

17284096 octetos 2009-05-11 [197] Annex 02- Preliminary draft new Recommendation ITU R S.[IMT-PFD] - Methodologies for determining whether an IMT station at a given location operating in the band 3 400-3 600 MHz would transmit without exceeding the power flux-density limits in Nos. 5.430A, 5.432A,

Word  

2361344 octetos 2009-05-29 [197] Annex 01- Preliminary draft new Recommendation ITU-R S.[VEHICLE_E/S] - Methodologies to estimate the off-axis e.i.r.p. levels and to assess the interference towards adjacent satellites resulting from pointing errors of vehicle-mounted earth stations in the 14 GHz f

Word  

343552 octetos 2009-06-12 [197] - Report on the meeting of Working Party 4A (Geneva, 27 April - 5 May 2009)
 

Documento :

UIT-R WP4A  Contribución  197

Título :

Report on the meeting of Working Party 4A (Geneva, 27 April to 5 May 2009)

Recibido en :

2009-05-06

Origen :

Chairman, WP 4A

Disponibilidad :

Restringido a usuarios de TIES [UIT-R]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2009-06-12