Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP8F : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP8F  C 

UIT-R WP8F

Sistemas posteriores a las IMT-2000

Resultados :1385 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 435 ]  
 
Reply liaison statement to Working Party 1B and for information to Working Parties 8B, 8D, 8F and 9B - Improving the international spectrum regulatory framework     WP 8A     2005-04-20
[ 434 ]  
 
Refined calculation method of multi-dimensional ERLANG-B formula and its sensitivity analysis for mixed circuit-switched traffic     Japan     2005-04-07
[ 433 ]  
 
Results of WTSA, RAG and CVC relevant to the work of the Working Parties of SG 8     Director, Radiocomunnication Bureau     2005-04-07
[ 432 ]  
 
Response to SG 19 Liaison statement on Trial of Public Access to SG 19 Documentation     TSAG     2005-04-06
[ 431 ]  
 
CPM Chapter 1 Rapporteurs - Structure of Chapter 1 - Mobile, aeronautical mobile, radionavigation, and radiolocation services     CPM Chapter 1 Rapporteurs     2005-03-31
[ 430 ]  
 
Response to the Questionnaire on possible terrestrial candidate frequency bands for the future development of IMT-2000 and systems beyond IMT-2000     Ecuador     2005-03-01
[ 429 ]  
 
Initial response to the "Questionnaire on possible terrestrial candidate frequency bands for the future development of MIT-2000 and systems beyond IMT-2000"     Cameroon (Republic of)     2005-02-14
[ 428 ]  
 
Regional activities for Market and Service     Africa Region Coordinator for Market and Service     2005-02-10
[ 427 ]  
+Ch.1-10 
Chairman's report on the 15th meeting of WP 8F (Geneva, 1-8 February 2005)     Chairman, WP 8F     2005-02-09
[ 426 ]  
(Rev.1) 
Lista final de participantes - Grupo de Trabajo 8F     Director, BR     2005-02-07
[ 425 ]  
 
Activities related to IMT-2000 and systems beyond IMT-2000 in Region 3     Region 3 Rapporteur     2005-02-07
[ 424 ]  
 
List of documents issed     Director, BR     2005-01-31
[ 423 ]  
 
Update on IMT-2000 activities in Region 2     Region 2 Special Rapporteur   229/8   2005-01-28
[ 422 ]  
 
Region 1 Report     Region 1 Rapporteur     2005-01-28
[ 421 ]  
 
Response to the questionnaire on the services and market for the future development of IMT-2000 and systems beyond IMT-2000     Azerbaijani Republic     2005-01-27
[ 420 ]  
 
Regional activities for market and service     Region 3 Coord for Mkt and Serv Asp     2005-01-27
[ 419 ]  
 
Response to the Questionnaire on the services and market for the future development of IMT-2000 and systems beyond IMT-2000     Poland (Republic of)     2005-01-26
[ 418 ]  
 
Response to the questionnaire on the services and market for the future development of IMT-2000 and systems beyond IMT-2000     Malta     2005-01-26
[ 417 ]  
 
Responses to the questionnaire on the services and market for the future development of IMT-2000 and systems beyond IMT-2000     Director, BR     2005-01-26
[ 416 ]  
 
Liaison statement to Working Parties 8A, 8B, 8D and 8F - Improving the international spectrum regulatory framework     Chairman, SG 8     2005-01-26
[ 415 ]  
 
Initial response from the UMTS forum on the Questionnaire on the services and market for the future development of IMT-2000 and systems beyond IMT-2000     UMTS Forum     2005-01-25
[ 414 ]  
 
Response to the Questionnaire on the Services and Market for the future development of IMT-2000 and systems beyond IMT-2000     3G Americas     2005-01-25
[ 413 ]  
 
Response to the Questionnaire on the Services and Market for the future development of IMT-2000 and systems beyond IMT-2000     Estonia (Republic of)     2004-12-30
[ 412 ]  
 
Response to the Questionnaire on the Services and Market for the future development of IMT-2000 and systems beyond IMT-2000     Bulgaria (Republic of)     2004-12-23
[ 411 ]  
 
Response to the Questionnaire on possible terrestrial candidate frequency bands for the future development of IMT-2000 and systems beyond IMT-2000     Slovenia (Republic of)     2005-01-17
[ 410 ]  
 
Suggestions for the preliminary draft new Report on SDR     Canada     2005-01-25
[ 409 ]  
 
2 500-2 690 MHz frequency arrangements     Canada     2005-01-25
[ 408 ]  
 
Comments on spectrum estimation methodology     Canada     2005-01-25
[ 407 ]  
 
On sharing requirements and issues related to the deployment of IMT-2000 systems in the 2 500-2 690 MHz band and OFDM-based broadband systems     Canada     2005-01-24
[ 406 ]  
 
Shortened version of guidelines on smooth transition of existing mobile networks to IMT-2000 for developing countries     CDMA Development Group (CDG)     2005-01-24
[ 405 ]  
 
Estimation of IP packet size statistics for evolved and new services in IMT-2000 and systems beyond IMT-2000     Germany (Federal Republic of)     2005-01-24
[ 404 ]  
 
Information about the planned European response to the WP 8F Questionnaire on future mobile services and markets from 2010 onwards (CACE/326)     Germany (Federal Republic of)     2005-01-24
[ 403 ]  
 
Shortened version of "Guidelines on the smooth transition of existing mobile networks to IMT-2000 for developing countries"     Cingular Wireless , Nokia Corporation     2005-01-24
[ 402 ]  
 
Input to the ITU-R "Questionnaire on the services and market for the future development of IMT-2000 and systems beyond IMT-2000" from winner project     France Telecom , Nokia     2005-01-24
[ 401 ]  
 
Trial of public access to Study Group 19 documentation     ITU-T SG 19     2005-01-24
[ 400 ]  
 
Initial response to Question 4 of the "Questionnaire on the services and market for the future development of IMT-2000 and systems beyond IMT-2000"     Intel Corp.     2005-01-24
[ 399 ]  
 
Extended and amended sensitivity analysis of the algorithm for calculation of the system capacity required to fulfill mean delay and delay percentile requirements     Germany (Federal Republic of)   229/8   2005-01-24
[ 398 ]  
 
Report on activities in Europe (11/2004 - 02/2005)     Regional coordinator for Europe on Market services     2005-01-24
[ 397 ]  
 
Draft initial response to the ITU-R candidate bands questionnaire     United Kingdom of Great Britain and Northern Ireland     2005-01-24
[ 396 ]  
 
Need for clarity and consistency of presentation within IMT.METH     United Kingdom of Great Britain and Northern Ireland     2005-01-24
[ 395 ]  
 
Comments on Speccalc     United Kingdom of Great Britain and Northern Ireland     2005-01-24
[ 394 ]  
 
Proposed modification of working document towards methodology for calculation of spectrum requirements for the future development of IMT-2000 and systems beyond IMT-2000 from the year 2010 onwards     Korea (Republic of)     2005-01-21
[ 393 ]  
 
Proposed method of market data analysys     Korea (Republic of)   229/8   2005-01-21
[ 392 ]  
 
Considerations on technology related paramenters for spectral efficiency calculation and spectrum requirements calculation     Korea (Republic of)     2005-01-21
[ 391 ]  
 
Responses to the Questionnaire on possible terrestrial candidate frequency bands for the future development of IMT-2000 and systems beyond IMT-2000     Korea (Republic of)     2005-01-21
[ 390 ]  
 
Initial submission of updated material on IMT-2000 CDMA DS and IMT-2000 CDMA TDD     Siemens , Ericsson , MOTOROLA, Inc. , Nokia , TELECOM ITALIA S.p.A.     2005-01-21
[ 389 ]  
 
Proposed modifications to the working document towards preliminary draft new Report [IMT.SDR]     Japan   230/8   2005-01-21
[ 388 ]  
 
Proposed modifications to working document towards preliminary draft new Report [IMT.RAD ASPECTS]     Japan   229/8   2005-01-21
[ 387 ]  
 
Proposed modifications to the radio parameter set for preliminary draft new Report [IMT.RAD ASPECTS] and usage of radio parameters in spectrum calculation methodology     Japan   229/8   2005-01-21
[ 386 ]  
 
Working document towards a draft new Report [IMT.SURVEY]     Japan   229/8   2005-01-21
Resultados :1385 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2020-12-18