Documentos Temporales  |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 74 ]
|
Summary of proposed revisions to ITU-R P.452
|
WP 3M
|
|
2006-10-03 |
|
[ 73 ]
|
Liaison statement to Working Parties 1A, 1C, 4A, 4-9S, 6E, 7B, 8A, 8B, 8F, 9A and 9D - Spreadsheet implementation of the clear-air portion of Recommendation ITU-R P.452-12
|
WP 3M
|
|
2006-10-03 |
|
[ 72 ]
|
Further work for the combined rain and wet snow attenuation prediction method
|
Annex to Chairman's Report
|
|
2005-10-07 |
|
[ 71 ]
|
Revision of tables included in the SG 3 databank concerning statistics of cloud cover and propagation at optical wavelengths.
|
Annex to WP 3M, Chairman's Report
|
|
2005-10-06 |
|
[ 70 ]
|
Status of Databanks
|
Annex XX to WP Chairman's Report
|
|
2005-10-06 |
|
[ 69 ]
|
Working document towards a preliminary draft new Recommendation - Prediction methods for the design of free space optical links
|
WPs 3J and 3M
|
|
2005-10-06 |
|
[ 68 ]
|
Working document towards a preliminary draft new Recommendation - Propagation data required for the design of free space optical links
|
WPs 3J and 3M
|
|
2005-10-06 |
|
[ 67 ]
|
Recommendation ITU-R P.618 - Proposed modifications and future work
|
WP 3M
|
|
2005-10-06 |
|
[ 66 ]
|
Update of the validation examples for Study Group 3 Earth-space propagation prediction methods
|
WPs 3M and 3J
|
228/3
|
2005-10-06 |
|
[ 65 ]
|
Proposed revision to Recommendation ITU-R P.682-1 - Propagation data required for the design of Earth-space aeronautical mobile telecommunication systems
|
WP 3M
|
|
2005-10-06 |
|
[ 64 ]
|
Working document towards proposed revisions to Recommendation ITU-R P.681-6 - Propagation data required for the design of Earth-space land mobile telecommunication systems
|
WP 3M
|
|
2005-10-06 |
|
[ 63 ]
|
Liaison statement to WP 9B - Fixed service application using frequency bands above 3 000 GHz
|
WPs 3J and 3M
|
|
2005-10-06 |
|
[ 62 ]
|
Liaison statement to Working Party 7C - Radio propagation characteristics for radiosonde systems
|
WP 3M
|
|
2005-10-05 |
|
[ 61 ]
|
Liaison statement to Working Parties 1A and 8B - Compatibility studies between aeronautical mobile telemetry systems and systems operating under primary radiocommunication services in 4 500-4 800 MHz and 5 925-6 700 MHz bands identified as candidates for further study
|
WP 3M
|
|
2005-10-04 |
|
[ 60 ]
|
Working document towards a revision of Recommendation ITU-R P.452-12
|
WP 3M Annex XX to WP 3M Chairman's Report
|
|
2005-10-04 |
|
[ 59 ]
|
Liaison statement to Working Party 9A - Impact of Recommendation ITU-R P.837-4 on FS link design using rain attenuation calculations in Recommendation ITU-R P.530-10
|
WP 3J and 3M
|
|
2005-10-04 |
|
[ 58 ]
|
Liaison statement to Working Party 9A concerning impact of Recommendation ITU-R P.530-11 on FS link design for small fade depths
|
WG 3M1
|
|
2005-10-04 |
|
[ 57 ]
(Rev.1) |
Proposed modifications to Recommendation ITU-R P.530-11 - Propagation data and prediction methods required for the design of terrestrial line-of-sight systems
|
WP 3M
|
204/3
|
2005-10-03 |
|
[ 56 ]
|
Liaison statement to Working Party 7C - Preliminary draft new recommendation for deriving rain scatter interference into links of satellites and other elevated platforms
|
WP 3M
|
|
2005-10-03 |
|
[ 55 ]
|
Liaison statement to Working Party 4-9S - Rain scatter interference
|
WP 3M
|
|
2005-10-03 |
|
[ 54 ]
(Rev.1-2) |
Annex to WP 3M Chairman's Report - Considerations on testing of methods for predicting rain attenuation
|
WP 3M
|
|
2005-10-03 |
Resultados :21 documentos
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):