Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 148 ]
|
Liaison statement to WP 6S - on the issue of accounting for path blockage in sharing studies
|
WP 9D
|
|
2001-09-19 |
|
[ 147 ]
|
Liaison statement to Task Group 1/7 and Working Party 6S
|
WP 8D
|
|
2001-09-19 |
|
[ 146 ]
|
Liaison statement from WP 4A on the sharing studies requested in Resolution 540 (WRC-2000)
|
WP 4A
|
|
2001-09-19 |
|
[ 145 ]
|
Liaison statement to WP 6S - Draft new Rec. - Methodologies for calculating aggregate epfd produced by multiple non-GSO FSS systems
|
WP 4A
|
|
2001-09-19 |
|
[ 144 ]
|
Reply to liaison statement from WP 6S - Comments on Recommendation ITU-R S.1525 "Impact of Sun interference into a GSO FSS link"
|
WP 4A
|
|
2001-09-19 |
|
[ 143 ]
|
Liaison statement to WP 6S on continous curves of epfd
|
WP 4A
|
|
2001-09-19 |
|
[ 142 ]
|
Liaison statement to WP 6S - Average antenna gain at a fixed elevation angle for consideration in terrestrial and satellite systems sharing studies
|
WP 8A
|
|
2001-09-19 |
|
[ 141 ]
|
Liaison statement to WP 6S- Blockage factors to be considered in sharing and pfd threshold studies in bands shared by terrestrial systems and satellite networks
|
WP 8A
|
|
2001-09-19 |
|
[ 140 ]
|
Liaison statement to WPs 6E and 6S, SG 8 and ITS WPs 8A, 8D and 8F, SG 9, JTG 1-6-8-9 and ITU-T SGs 9, 11, 13 and 16
|
Chairman, WP 6M
|
|
2001-09-19 |
|
[ 139 ]
|
Report of the second meeting of ITU-R Working Party 6S (Geneva, 19-28 September 2001)
|
Chairman, WP 6S
|
|
2001-09-19 |
|
[ 138 ]
|
Liaison statement to Working Parties 6S and 8D - Preliminary draft CPM text for WRC-03 Agenda item 1.37
|
WP 4A
|
|
2001-09-19 |
|
[ 137 ]
|
Liaison statement to WP 6S
|
WP 8F
|
|
2001-09-19 |
|
[ 136 ]
|
Liaison statement to WP 6S for information - Consideration on the allocation to the FSS in the space-to-Earth direction in the frequency band 17.3-17.7 GHz
|
WP 4A
|
|
2001-09-19 |
|
[ 135 ]
|
Liaison statement to Working Parties 6S, 8D and Task Group 1/7 - Measurement of GSO satellite unwanted emissions
|
WP 4A
|
|
2001-09-19 |
|
[ 134 ]
|
Liaison to Working Parties 1A, 6S, 7B, 7C, 8D, Satellite Backlog Action Group and the Radiocommunications Bureau - Development of specifications for automating Article S5 and other provisions of the radio regulations
|
WP 4A
|
|
2001-09-19 |
|
[ 133 ]
+Add.1 |
Liaison Statement to the Special Committee, Working Parties 1A, 6S, 7B, 7C and 8D and Note to the Director, Radiocommunication Bureau
|
WP 4A
|
|
2001-09-19 |
|
[ 132 ]
+Corr.1 |
Liaison statement to Working Parties 6S, 7D, 7E, 8D and Task Group 1/7 - Interference calculations between radio astronomy telescopes and non-GSO satellite systems
|
WP 4A
|
|
2001-09-19 |
|
[ 131 ]
|
Liaison statement to WP 6S and WP 4-9S
|
WP 4A
|
|
2001-09-19 |
|
[ 130 ]
|
Liaison statement to JWP 4-9S, WP 6S and WP 8D and the Special Committee on the current regulatory situation of typical earth stations
|
WP 4A
|
|
2001-09-19 |
|
[ 129 ]
|
Liaison statement to Working Parties 6S, 7D, 7E, 8A and 9D and Task Group 1/7 - CPM text for Agenda item 1.32 (Resolution 128)
|
WP 4A
|
|
2001-09-19 |
|
[ 128 ]
|
Liaison statement to Task Group 1/7, Working Parties 6S, 7C, 7D, 7E, 8D and 9D - Methods under consideration regarding WRC-03 agenda item 1.8.2
|
WP 4A
|
|
2001-09-19 |
|
[ 127 ]
|
Liaison statement to Working Party 6S and the Special Committee
|
Chairman, SG 6
|
|
2001-09-19 |
|
[ 126 ]
|
Proposal for a new category of texts of Study Group 6 to be used as guides to its Recommendations
|
SG 6
|
|
2001-09-19 |
|
[ 125 ]
|
Liaison statement to WP 4A and Special Rapporteur Group 6S/SRG-12 on the preliminary results from the downlink sharing studies requested in Res. 540 (WRC-2000)
|
WP 6S
|
|
2001-09-19 |
|
[ 124 ]
|
Liaison to all WPs of ITU-R SG 6 and to ITU-T SG 15 - Call for proposal for a common file format for the exchange of video material in file format and for the availability of software to manage and display on a computer monitor the video part of a TV or multimedia signal
|
WP 6Q
|
|
2001-09-19 |
|
[ 123 ]
|
Proposal for the handling of metada inside SG 6
|
Chairman, SG 6
|
|
2001-09-19 |
|
[ 122 ]
(Rev.1) |
Preliminary results from the sharing studies requested in Resolution 540 (WRC-2000)
|
WP 6S
|
|
2001-09-19 |
|
[ 121 ]
|
Second status report - Review of the sharing criteria for the Appendices S30 and S30A bands as mandated by Resolutions 540 (WRC-2000) and 735 (WRC-2000)
|
Special Rapporteur 6S/SRG-12
|
|
2001-09-19 |
|
[ 120 ]
|
Liaison statement to Working Party 6S on band-by-band studies on agenda item 1.8.2 - Preliminary results for BSS sound systems
|
TG 1/7
|
|
2001-09-19 |
|
[ 119 ]
|
Liaison statement to WP's 4A for action and to WP's 6S, 7D and 8D for information
|
TG 1/7
|
|
2001-09-19 |
|
[ 118 ]
|
Liaison statement to WP's 4A, 6S, 7D, 7E and 8D
|
TG 1/7
|
|
2001-09-19 |
|
[ 117 ]
|
Liaison statement to WP's 4A, 6S and 8D - Satellite unwanted emission levels
|
TG 1/7
|
|
2001-09-19 |
|
[ 116 ]
|
Liaison statement to Working Parties 4A, 6S, 8D, 9B and 9D - Measurement bandwidths for levels of unwanted emissions
|
TG 1/7
|
|
2001-09-19 |
|
[ 115 ]
|
List of documents issued
|
BRSGD
|
|
2001-09-19 |
|
[ 114 ]
|
Power flux-density limits and the protection of certain FS applications operating in the 2.5 GHz bands
|
Australia
|
|
2001-09-19 |
|
[ 113 ]
|
Recommendations to be brought to the attention of Study Group 6, Working Parties 6E and 6S
|
Chairman, SG 6
|
|
2001-09-19 |
|
[ 112 ]
|
Working Document towards a Recommendation on availability performance objectives for digital multiprogramme systems
|
United States of America
|
|
2001-09-19 |
|
[ 111 ]
|
Blockage factors to be considered in sharing and PFD threshold studies in bands shared by terrestrial systems and satellite networks
|
United States of America
|
|
2001-09-19 |
|
[ 110 ]
|
Proposal for a PDN on methodologies for calculating aggregate epfd down produced by multiple non-GSO FSS systems
|
United States of America
|
|
2001-09-19 |
|
[ 109 ]
|
Proposed CPM text on the use of the 2 630-2 655 MHz band by GSO BSS (Sound) systems
|
France
|
|
2001-09-19 |
|
[ 108 ]
|
Interference between BSS feeder-link transmitting earth stations and HDFSS receiving earth stations in the band 17.3-17.7 GHz
|
France
|
|
2001-09-19 |
|
[ 107 ]
|
Initial considerations on the regulatory aspects of HEO satellite systems (WRC-03 Agenda item 1.37)
|
France
|
|
2001-09-19 |
|
[ 106 ]
|
Interference analysis concerning transmitting BSS satellites in Region 2 interfering with receiving BSS feeder link satellites in Regions 1 and 3 in the 17.3 to 17.8 GHz
|
United States of America
|
|
2001-09-19 |
|
[ 105 ]
|
Considerations on the possible allocation of the band 17.3-17.7 GHz to the fixed-satellite service (space-to-Earth)
|
France
|
|
2001-09-19 |
|
[ 104 ]
|
Current regulatory situation of HD-FSS earth stations in bands shared with equal rights between FSS and terrestrial services or space service operating in the opposite direction of transmission
|
France
|
|
2001-09-19 |
|
[ 103 ]
|
Draft new Recommendation on power flux density values to protect the BSS in the 11.7-12.7 GHz band from interference caused by inter-regional GSO FSS systems
|
United States of America
|
|
2001-09-19 |
|
[ 102 ]
|
Coordination of transmitting terrestrial stations or transmitting FSS earth stations with BSS earth stations: Comparison of Annex 3 to Appendix S30 and Appendix S7 methodologies
|
France
|
|
2001-09-19 |
|
[ 101 ]
|
Proposed draft revision to Recommendation ITU-R BO.1373
|
United States of America
|
|
2001-09-19 |
|
[ 100 ]
|
Proposed reply from Working Party 6S to Liaison Statements from Working Party 4A and Working Party 4-9S
|
United States of America
|
|
2001-09-19 |
|
[ 99 ]
(Rev.1) |
Review and organization of work - Meeting 19-28 September 2001
|
Chairman, WP 6S
|
|
2001-09-19 |
Resultados :348 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):