International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C 

ITU-T SG05

Environment, climate action, circular economy and electromagnetic fields

Study Period 2025

Results:52 total items.
Result page:  1 - 2  - Next Next
Contributions  [ Source: China Unicom ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 681 ]  
 
Proposed modification of work item ITU-T L.EE_dse "Energy efficiency metrics and measurement methods for data storage equipment" and draft for consent     Huawei Technologies Co., Ltd. (China) , China Academy of Information and Communications Technology (CAICT) (China) , China Unicom (China)   Q6/5   2026-10-07
[ 666 ]  
 
Proposal to start new recommendation ITU-T L.AS-HESS-AIDC"Assessment methodology for hybrid energy storage in AI data centers "     China Unicom (China) , State Grid Corporation of China (China)   Q6/5   2026-10-07
[ 662 ]  
 
Proposed new work item on draft ITU-T Supplement L.Sup.AIA-EDC "Application guidance on documenting the coverage of operational energy data for AI agent tasks"     China Unicom (China) , China Information Communication Technologies Group (China)   Q6/5   2026-10-07
[ 654 ]  
 
The fifth draft of Recommendation L.ITLB "Application practices of smart managements of Lithium iron phosphate battery in telecommunication rooms and data centers" -Apply for consent.     China Unicom (China) , China Tower Corporation Limited (China) , Shuangdeng Group Co., Ltd. (Chinashoto) (China)   Q6/5   2026-10-07
[ 632 ]  
 
Consent for L.CP: "Standardized Terminology for computing power and electric power coordination"-modify the whole text     China Unicom (China) , Huawei Technologies Co., Ltd. (China) , Shanghai Power Equipment Research Institute Co., Ltd. (China) , State Grid Corporation of China (China)   Q8/5   2026-10-06
[ 593 ]  
(Rev.1) 
Proposed new work item on ITU-T L.EORI "Framework and requirements for resilience of telecommunication infrastructure against environmental and operational threats"     China Academy of Information and Communications Technology (CAICT) (China) , Agência Nacional de Telecomunicações - ANATEL (Brazil) , China Telecommunications Corporation (China) , China Unicom (China) , Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany) , Orange (France)   Q12/5   2026-10-05
[ 585 ]  
 
Draft Recommendation ITU-T L. MMOC "Multi microgrid scheduling architecture and scenario requirements aiming for reduction of GHG emissions"- Changes to Clauses 7-10     State Grid Corporation of China (China) , China Unicom (China)   Q11/5   2026-10-04
[ 580 ]  
 
Proposal to start new technical report ITU-T LSTR.MWBIO "Assessment of the impact of millimetre-wave communication systems on biodiversity"     State Grid Corporation of China (China) , China Academy of Information and Communications Technology (CAICT) (China) , China Unicom (China)   Q9/5   2026-10-04
[ 579 ]  
 
Updated baseline text of new Recommendation of ITU-T L.REDC_EM "Framework of Energy Management System for Data Centres Using Directly Connected Renewable Energy Sources"     State Grid Corporation of China (China) , China Academy of Information and Communications Technology (CAICT) (China) , China Telecommunications Corporation (China) , China Unicom (China)   Q6/5   2026-10-04
[ 578 ]  
 
Proposed new work item on draft recommendation ITU-T L.GPSM"Guideline for Power Supply Stability Management in AI Data Centers"     State Grid Corporation of China (China) , China Unicom (China) , Xi'an Jiaotong University (China)   Q6/5   2026-10-03
[ 575 ]  
 
Consent for ITU-T L.DSEC "Requirements for energy-efficient management of data storage in data centers"     State Grid Corporation of China (China) , China Mobile Communications Co. Ltd. (China) , China Unicom (China)   Q6/5   2026-10-03
[ 574 ]  
 
6th Modification for L.CU_AI: Proposal to update the whole document     State Grid Corporation of China (China) , China Unicom (China)   Q7/5   2026-10-03
[ 573 ]  
 
Technical Report ITU-T KSTR-emc.uav "Electromagnetic Compatibility (EMC) Test Methods for Civilian Unmanned Aerial Vehicle (UAV) with Cellular Communication Modules" for agreement     State Grid Corporation of China (China) , China Information Communication Technologies Group (China) , China Unicom (China)   Q4/5   2026-10-03
[ 556 ]  
 
Proposal on establishment of new Focus Group "Artificial Intelligence + Energy (FG-AI+E)"     China Academy of Information and Communications Technology (CAICT) (China) , China Information Communication Technologies Group (China) , China Mobile Communications Co. Ltd. (China) , China Southern Power Grid Co., Ltd. (China) , China Telecommunications Corporation (China) , China Tower Corporation Limited (China) , China Unicom (China) , Communications Authority of Kenya (CA) (Kenya) , Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of)) , Huawei Technologies Co., Ltd. (China) , Ministry of Communications and Information Technology (MCIT) (Egypt) , Orange (France) , State Grid Corporation of China (China) , Tanzania Communications Regulatory Authority (TCRA) (Tanzania) , Telefon AB - LM Ericsson (Sweden) , Uganda Communications Commission (UCC) (Uganda) , ZTE Corporation (China)   QALL/5   2026-09-30
[ 554 ]  
 
The first draft revision of ITU-T K.47 " Protection of telecommunication lines against direct lightning flashes"     China Unicom (China) , China Information Communication Technologies Group (China)   Q1/5   2026-09-30
[ 538 ]  
 
The first draft of L.Suppl.CFA_BSE to ITU-T L.1410"Guidelines for Carbon Footprint Assessment of 5G Base Station Equipment"     China Unicom; ZTE Corporation   Q9/5   2026-05-28
[ 537 ]  
 
The first draft of L.PS_AI "Distributed Power Supply Architecture for AI Scenarios"     China Unicom; China Mobile Communications Group Co.,Ltd   Q6/5   2026-05-28
[ 475 ]  
(Rev.1) 
Proposed new work item on draft new Recommendation ITU-T L.HESS-AIDC"General Requirements for Hybrid energy storage for AI data centers"     China Unicom , State Grid Corporation of China   Q6/5   2026-05-27
[ 467 ]  
(Rev.1) 
The forth draft of L.ITLB "Application practices of smart managements of Lithium iron phosphate battery in telecommunication rooms and data centers" -Changes to Scope, References,Definitions, Section 6, Section 7, Section 8 and Section 9.     China Tower Corporation Limited , China Unicom , Shuangdeng Group Co., Ltd. (Chinashoto)   Q6/5   2026-05-27
[ 463 ]  
 
The 3rd modification for ITU-T L.DSEC "Requirements for data storage energy efficiency management of in data centers"-modification for clause 9     China Unicom , State Grid Corporation of China   Q6/5   2026-05-27
[ 455 ]  
 
4th Modification for ITU-T L.CU_AI "Guidelines for Circular Utilization of Artificial Intelligence Computing Power Resources"- updating clause 8     China Unicom , State Grid Corporation of China   Q7/5   2026-05-26
[ 450 ]  
 
Proposed new work item on draft recommendation ITU-T L.AIHA"Quality qualification and health assessment for reused AI computing power"     China Academy of Information and Communications Technology (CAICT) , China Unicom , State Grid Corporation of China , Wuhan University (China)   Q7/5   2026-05-26
[ 448 ]  
 
Proposed new work item on draft Recommendation ITU-T L.PT_sharing "Low-cost pole and tower sharing for telecommunication adapting to climate change"     China Telecommunications Corporation , China Tower Corporation Limited , China Unicom , State Grid Corporation of China   Q12/5   2026-05-26
[ 439 ]  
 
Proposed new work item on draft Recommendation ITU-T L.Scheduling_Computing&Electric "Requirements for computing power and electric power coordination scheduling strategies for climate change mitigation"     China Academy of Information and Communications Technology (CAICT) , China Unicom , State Grid Corporation of China   Q11/5   2026-05-26
[ 433 ]  
 
Second modification of L.CP "Standardized Terminology for Computing power resources and Grid Power resources Coordination"     China Unicom , State Grid Corporation of China   Q8/5   2026-05-26
[ 432 ]  
 
Draft Technical Report ITU-T L.TR_ECEM-SN "Energy consumption and efficiency metrics for operators of 5G networks in shared network scenario" - Changes to sections 8 and 9     China Information Communication Technologies Group , China Telecommunications Corporation , China Unicom   Q6/5   2026-05-26
[ 430 ]  
(Rev.1) 
Consent for ITU-T L.IEDL "Energy saving strategy for deep learning computing"- modifications to appendix     China Academy of Information and Communications Technology (CAICT) , China Telecommunications Corporation , China Unicom   Q6/5   2026-05-26
[ 423 ]  
(Rev.1) 
Draft Recommendation ITU-T L. MMOC "Multi microgrid scheduling architecture and scenario requirements aiming for reduction of GHG emissions"- Changes to Clause 7     China Unicom , State Grid Corporation of China   Q11/5   2026-05-26
[ 401 ]  
 
Fourth draft K.Suppl.tov "Protection of ICT equipment with DC power supply against temporary overvoltage (TOV) "     China Unicom , ZTE Corporation (China)   Q2/5   2026-05-25
[ 319 ]  
(Rev.1) 
Draft Recommendation ITU-T L.DSEC "Requirements for data storage energy efficiency management of in data centers"Changes to clause 9     China Unicom , State Grid Corporation of China   Q6/5   2025-10-16
[ 318 ]  
 
The third draft of L.ITLB "Application practices of smart managements of Lithium iron phosphate battery in telecommunication rooms and data centers"     China Tower Corporation Limited , China Unicom , Shuangdeng Group Co., Ltd. (Chinashoto)   Q6/5   2025-10-16
[ 316 ]  
(Rev.1) 
Draft recommendation ITU-T L.IEDL "Energy saving strategy for deep learning computing"- changes to clauses 6,7,8     China Institute of Communications , China Unicom , State Grid Corporation of China   Q6/5   2025-10-16
[ 313 ]  
 
Third draft K.Suppl.tov "Protection of ICT equipment with DC power supply against temporary overvoltage (TOV)"     China Information Communication Technologies Group , China Unicom , ZTE Corporation (China)   Q2/5   2025-10-16
[ 312 ]  
 
Proposed new work item on draft Recommendation ITU-T L.CP "Standardized Terminology for Computing power resources and Grid Power resources Coordination"     China Unicom , State Grid Corporation of China , State Grid Zhejiang Electric Power Co., Ltd. Research Institute (China)   Q8/5   2025-10-16
[ 309 ]  
 
The draft Recommendation ITU-T L.SE_MI "Smart Energy Solutions for Manufacturing Industry" for Clause 8 part one     China Academy of Information and Communications Technology , China Unicom , State Grid Corporation of China   Q11/5   2025-10-16
[ 305 ]  
 
Updated of draft Recommendation ITU-T L.Energy_sav_Cloud & Edge: "Energy saving design for Data Centre considering harmonization of Cloud and Edge" for Clause 6     China Academy of Information and Communications Technology , China Unicom   Q6/5   2025-10-16
[ 303 ]  
 
Draft new Technical Report ITU-T L.TR.GECA-DC "Specifications of green electricity consumption accounting for data centers"     China Academy of Information and Communications Technology , China Unicom , State Grid Corporation of China   Q11/5   2025-10-16
[ 301 ]  
 
Proposed new work item on Technical Report ITU-T K.TR_emc.uav "Electromagnetic Compatibility (EMC) Test Methods for Civilian UAV with Cellular Communication Modules"     China Information Communication Technologies Group , China Unicom , State Grid Corporation of China   Q4/5   2025-10-16
[ 300 ]  
 
Proposed new work item on Draft Recommendation ITU-T L.CU_AI "Guidelines for Circular Utilization of Computing Power Resources for AI"     China Academy of Information and Communications Technology , China Unicom , State Grid Corporation of China   Q7/5   2025-10-16
[ 289 ]  
(Rev.1) 
Proposed new work item on draft Recommendation ITU-T L.Env_storage "Environmental Impact Assessment Guideline for Data Storage Devices"     China Information Communication Technologies Group , China Unicom , State Grid Corporation of China   Q9/5   2025-10-16
[ 284 ]  
 
Draft Recommendation ITU-T L. MMOC "Multi microgrid scheduling architecture and scenario requirements aiming for reduction of GHG emissions" Changes to clause 7     China Information Communication Technologies Group , China Unicom , State Grid Corporation of China   Q11/5   2025-10-16
[ 268 ]  
 
Proposed new work item on technical report ITU-T L.TR_ECEM-SN "Energy consumption and efficiency metrics for operators of 5G networks in shared network scenario"     China Information Communication Technologies Group , China Telecommunications Corporation , China Unicom   Q6/5   2025-10-16
[ 261 ]  
 
Proposed a new work item on draft Recommendation ITU-T K. pofc " Practical guidance on the protection of optical fibre cables"     China Unicom   Q1/5   2025-10-16
[ 251 ]  
 
Proposed new work item on technical report L. TR_PET_DC "Application of power electronic transformers for reducing energy consumption and carbon emissions in data centers"     China Telecommunications Corporation , China Unicom   Q6/5   2025-10-15
[ 176 ]  
 
Proposed new work item on draft recommendation ITU-T L.DSEC "Requirements for data storage energy consumption control in data centers"     China Information Communication Technologies Group , China Unicom , State Grid Corporation of China   Q6/5   2025-05-21
[ 172 ]  
 
Proposed new work item on draft Recommendation ITU-T L. MMOC "Multi microgrid scheduling architecture and scenario requirements with low-carbon emissions as the goal"     China Information Communication Technologies Group , China Unicom , State Grid Corporation of China   Q11/5   2025-05-21
[ 167 ]  
 
Proposed new work item on technical report L. TR_750VDC "Up to 750 VDC power feeding systems for data centre and telecommunication room"     China Unicom , Ministry of Industry and Information Technology (MIIT) (China)   Q6/5   2025-05-21
[ 153 ]  
(Rev.1) 
The revised draft about K.pids "Practical guidance for protection of the indoor distribution system for mobile communication in large-scale physical buildings"     China Unicom   Q1/5   2025-05-21
[ 132 ]  
(Rev.1) 
Second draft of K.Suppl.tov "Protection of ICT equipment with DC power supply against temporary overvoltage (TOV)"     China Unicom , ZTE Corporation (China)   Q2/5   2025-05-21
[ 104 ]  
(Rev.1) 
The updated draft of L.WHR "Specification for waste heat reuse in telecommunication rooms and data centers" for consent     China Mobile Communications Co. Ltd. , China Unicom   Q11/5   2025-05-20
Results:52 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2026-10-26