International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Meeting 2024-06-17 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C (2024-06-17) 

ITU-T SG05

EMF, environment, climate action, sustainable digitalization, and circular economy

Study Period 2022

Meeting  from 2024-06-17 to 2024-06-21

held in Poland [Wroclaw]

Other Meetings : 2023-11-13  2023-06-13  2023-02-09  2022-12-05  2022-10-17  2022-06-21 

Results:10 total items.
Contributions  [ AI/Question: Q3/5 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 486 ]  
 
Proposal of updating for draft Recommendation ITU-T K.AI-EMF on "EMF evaluation method using artificial intelligence in vicinity of 5G NR base station"  
To be verified by TSB
 
Korea (Rep. of)   Q3/5   2024-05-30
[ 484 ]  
(Rev.1) 
Proposal to update Recommendation ITU-T K.83 - "Monitoring of electromagnetic field levels"  
To be verified by TSB
 
Korea (Rep. of)   Q3/5   2024-05-30
[ 477 ]  
 
Proposal of the modification of the Term of References of Q3/5 "Human exposure to electromagnetic fields (EMFs) due to digital technologies"  
To be verified by TSB
 
Orange Polska S.A. (Poland)   Q3/5   2024-05-28
[ 476 ]  
 
Input draft Supplement ITU-T K.Suppl.MethDataEMF on "Guidance on Methodologies for EMF Measurements and Assessments and Mitigating Public Concerns Regarding Human Exposure from EMF around Telecommunications Installations"  
To be verified by TSB
 
National Communications Authority (NCA) (Ghana) , Tanzania Communications Regulatory Authority (TCRA) , Uganda Communications Commission (UCC)   Q3/5   2024-05-27
[ 472 ]  
 
Information to be included in ITU-T Recommendation K.Reflection "Impact of the metallic structures for the EMF exposure level".  
To be verified by TSB
 
Orange Polska S.A. (Poland)   Q3/5   2024-05-23
[ 471 ]  
 
Final Draft of ITU-T Recommendation K.peak  
To be verified by TSB
 
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))   Q3/5   2024-05-23
[ 470 ]  
 
Proposal of the draft new Recommendation ITU-T K.peak "Comparison between peak and real exposure in the long-term considerations"  
To be verified by TSB
 
Orange Polska S.A. (Poland)   Q3/5   2024-05-20
[ 468 ]  
(Rev.1) 
Proposal of the revision of the A.1 justification of the Recommendation ITU-T K.peaks "Comparison between peak and real exposure in the long-term considerations"     Orange Polska S.A. (Poland)   Q3/5   2024-05-04
[ 467 ]  
 
Proposal of new work item - the revision of the Recommendation ITU-T K.91 "Guidance for assessment, evaluation and monitoring of human exposure to radio frequency electromagnetic fields".     Orange Polska S.A. (Poland)   Q3/5   2024-05-04
[ 466 ]  
 
Proposal of new work item - the revision of the Recommendation ITU-T K.100 "Measurement of radio frequency electromagnetic fields to determine compliance with human exposure limits when a base station is put into service".     Orange Polska S.A. (Poland)   Q3/5   2024-05-04
Results:10 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-30