International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 2 : Meeting 2022-05-16 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 2  TD-PLEN (2022-05-16) 

ITU-T SG 2

Operational aspects

Study Period 2022

Meeting  from 2022-05-16 to 2022-05-20

held in Switzerland [Geneva]

Other Meetings : 2024-06-19  2024-03-11  2023-11-08  2023-03-13  [ 2022-05-16 ] 

Results:19 total items.
Temporary Documents  (PLEN)  [ AI/Question: Q5/2 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 109-PLEN ]  
 
Revised baselline text for M.rfmls: Management Requirements for Federated Machine Learning Systems     Editor, M.rfmls   Q5/2   2022-05-18
[ 108-PLEN ]  
 
Revised baseline text for M.rrsp: Requirements for robot-based on-site smart patrol of telecommunication network     Editor, M.rrsp   Q5/2   2022-05-18
[ 89-PLEN ]  
 
Revised baseline text for M.rmbs: Requirements for management of blockchain system     Editor, M.rmbs   Q5/2   2022-05-17
[ 88-PLEN ]  
 
Revised baseline text for M.rla-AI: Requirements for Log Analysis in telecom management with AI     Editor, M.rla-AI   Q5/2   2022-05-17
[ 87-PLEN ]  
 
Revised baseline text for M.rmnoc-AI: Requirements for the management of network operation cost within AITOM in telecom operational aspects     Editor, M.rmnoc-AI   Q5/2   2022-05-17
[ 83-PLEN ]  
 
Proposed new work item: Requirements for Optical Distribution Frame (ODF) On-Site Smart Maintenance     Rapporteur, Q5/2   Q5/2   2022-05-17
[ 82-PLEN ]  
(Rev.1) 
Proposed new work item M.rcpnm: Requirements for Computing Power Network Management     Rapporteur, Q5/2   Q5/2   2022-05-17
[ 81-PLEN ]  
 
Proposed new work item M.rsmca: Requirements for smart maintenance of cell antenna     Rapporteur, Q5/2   Q5/2   2022-05-17
[ 80-PLEN ]  
 
Proposed new work item M.rsca : Requirements for smart comprehensive analysis with AITOM     Rapporteur, Q5/2   Q5/2   2022-05-17
[ 79-PLEN ]  
(Rev.1-2) 
Revised baseline text for M.3382 (M.rwop-AI): "Requirements for work orders processing in telecom management with AI" (for consent)     Editor, M.rwop-AI   Q5/2   2022-05-17
[ 53-PLEN ]  
 
Meeting Report of Q5/2 (16 March 2022)     Rapporteur, Q5/2   Q5/2   2022-03-21
[ 52-PLEN ]  
 
Revised baseline text for M.rmnoc-AI: "Requirements for the management of network operation cost within AITOM in telecom operational aspects"     Editor, M.rmnoc-AI   Q5/2   2022-03-21
[ 44-PLEN ]  
 
Revised baseline text for M.rla-AI "Requirements for Log Analysis with AI-enhanced Management System" (output of Q5/2 e-meeting, 22 February 2022)     Editor, rla-AI   Q5/2   2022-03-21
[ 43-PLEN ]  
 
Meeting Report for Question 5/2 (virtual, 22 February 2022)     Rapporteur, Q5/2   Q5/2   2022-03-21
[ 31-PLEN ]  
(Rev.1-2) 
Telecommunications management and OAM project plan     Rapporteur, Q5/2   Q5/2   2022-03-21
[ 30-PLEN ]  
(Rev.1-4) 
Draft report for the Question 5/2 meeting (Geneva, 16-20 May 2022)     Rapporteur, Q5/2   Q5/2   2022-03-21
[ 29-PLEN ]  
(Rev.1) 
Draft report for the Working Party 2/2 meeting (Geneva, 16-20 May 2022)     Chairman, WP2/2   Q7/2, Q6/2, Q5/2   2022-03-21
[ 28-PLEN ]  
(Rev.1) 
Draft agenda for the Question 5/2, 6/2 and 7/2 meetings, including Working Party 2/2 (Geneva, 16-20 May 2022)     Chairman, WP2/2   Q7/2, Q6/2, Q5/2   2022-03-21
[ 17-PLEN ]  
(Rev.1) 
Work Programme for Question 5/2     TSB   Q5/2   2022-03-15
Results:19 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2025-7-23