International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Transport, access and home

Study Period 2017

Results:25 total items.
Contributions  [ AI/Question: Q7/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1882 ]  
 
Consideration on adding the SOP into the optical monitoring parameter section in G.697     Huawei Technologies Co., Ltd. (China)   Q7/15, Q6/15   2020-01-14
[ 1880 ]  
 
Consideration on the definition of port isolation in G.671 and G.672     Huawei Technologies Co., Ltd. (China)   Q7/15, Q6/15   2020-01-14
[ 1834 ]  
 
Consideration on delay asymmetry for synchronization     China Mobile Communications Corporation , ZTE Corporation (China)   Q7/15, Q6/15, Q13/15   2020-01-14
[ 1824 ]  
 
Performance parameter of optical component and performance monitoring parameters     Nokia Shanghai Bell Co. Ltd. (China)   Q7/15, Q6/15, Q14/15   2020-01-14
[ 1807 ]  
 
Modification of asymmetry compensation for use of different wavelengths in G.8271     China Information Communication Technologies Group   Q7/15, Q6/15, Q13/15   2020-01-14
[ 1805 ]  
(Rev.1) 
Transmission asymmetry delay compensation for bidirectional module     China Information Communication Technologies Group   Q7/15, Q6/15, Q14/15, Q13/15   2020-01-14
[ 1753 ]  
 
information and considerations about the development of the OA     ZTE Corporation (China)   Q7/15   2020-01-14
[ 1669 ]  
 
Clarification on the use of G.807     Infinera Corporation (United States) , Nokia USA (United States) , ZTE Corporation (China)   Q7/15, Q6/15, Q14/15, Q12/15, Q11/15   2020-01-13
[ 1642 ]  
 
Chinese proposals on WP2/15 restructuring for the next study period     Ministry of Industry and Information Technology (MIIT) (China) , China Information Communication Technologies Group , China Unicom , Hengtong Optic-electric Co., Ltd. (China) , Huawei Technologies Co., Ltd. (China) , Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)   Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15   2020-01-13
[ 1641 ]  
 
Work scope and supporting data for revision of ITU-T L.400     Ministry of Industry and Information Technology (MIIT) (China)   Q7/15   2020-01-13
[ 1594 ]  
 
Proposals on WP2/15 restructuring for the next study period     Japan   Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15   2020-01-11
[ 1538 ]  
 
Proposals on WP2/15 restructuring for the next Study Period 2021-2024     Italy   Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15   2019-12-19
[ 1402 ]  
 
Requirement of device in co-fiber transmission system of QKD and WDM     China Telecommunications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) (China) , QuantumCTek Co., Ltd. (China)   Q7/15   2019-06-18
[ 1371 ]  
 
Parameters requirement of Devices using in Coexistence transmission of QKD system with classical WDM system     China Unicom   Q7/15   2019-06-18
[ 1272 ]  
 
Proposal to revise the fusion splice insertion loss of single-mode fibre in ITU-T Rec. L.400 and ITU-T Rec. G.671     Ministry of Industry and Information Technology (MIIT) (China)   Q7/15   2019-06-17
[ 1207 ]  
 
Include channel asymmetric group delay as parameter in G.672     ADVA Optical Networking (United Kingdom) , Deutsche Telekom AG (Germany) , Hellenic Telecommunications Organization S.A. (OTE) (Greece) , Orange Polska S.A. (Poland)   Q7/15   2019-06-14
[ 1071 ]  
(Rev.1) 
Parameters that impact media latency and differential delay     ZTE Corporation (China)   Q7/15, Q6/15, Q5/15, Q14/15   2018-09-25
[ 957 ]  
 
Proposed new work item on L. pdwd "Passive dense WDM devices"     China Unicom , Ministry of Industry and Information Technology (MIIT) (China)   Q7/15, Q16/15   2018-09-25
[ 755 ]  
 
Include latency as parameter in Recommendations     ADVA Optical Networking (United Kingdom) , Deutsche Telekom AG (Germany) , Orange Polska S.A. (Poland) , Telefon AB - LM Ericsson (Sweden)   Q7/15, Q6/15, Q13/15, Q11/15   2018-09-10
[ 663 ]  
 
Discussion on the MD-ROADM configuration     Huawei Technologies Co., Ltd. (China)   Q7/15   2018-01-16
[ 642 ]  
 
Requirements of improving standardization for optical cross connect (OXC)     China Mobile Communications Corporation   Q7/15   2018-01-16
[ 543 ]  
(Rev.1) 
Clarifications on link and network asymmetry compensation     Telefon AB - LM Ericsson (Sweden)   Q7/15, Q6/15, Q13/15, Q11/15   2018-01-15
[ 246 ]  
 
Proposal to enhance flexible grid related content in draft revised G.672     Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q7/15   2017-06-06
[ 106 ]  
 
Proposal for ROADM related parameters in G.672     FiberHome Technologies Group (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q7/15   2017-06-05
[ 9 ]  
 
Rational for change in attenuation requirements in draft new Recommendation L.fmc     CommScope Connectivity Belgium BVBA   Q7/15   2017-05-11
Results:25 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-1