Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1610 ]
|
Cable identification using application of a voltage for metallic wire
|
Communication Line Products Association of Japan
|
Q17/15
|
2020-01-11 |
|
[ 1609 ]
|
Maximum Spectral Excursion definition for 25G interfaces
|
ADVA Optical Networking (United Kingdom)
|
Q6/15
|
2020-01-11 |
|
[ 1608 ]
|
G.mtn-prot - APS Protocol
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2020-01-11 |
|
[ 1607 ]
|
MTN Protection Switching Architecture
|
Huawei Technologies Co., Ltd. (China)
|
Q12/15, Q11/15
|
2020-01-11 |
|
[ 1606 ]
|
MTN Linear Protection - Network Objectives
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2020-01-11 |
|
[ 1605 ]
|
Skeleton and text proposal for MTN equipment Recommendation
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2020-01-11 |
|
[ 1604 ]
|
FEC bypass indication mode and FEC degraded SER
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2020-01-11 |
|
[ 1603 ]
|
consolidation of idle block adaptation process and invalid block replacement process
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2020-01-11 |
|
[ 1602 ]
|
Discussion for handling error contamination issue
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2020-01-11 |
|
[ 1601 ]
|
Specification consideration on idle block adaptation at MTN section adaptation
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2020-01-11 |
|
[ 1600 ]
|
Statistical evaluation of block formatting process's impact on MTN path error monitoring
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2020-01-11 |
|
[ 1599 ]
|
Path layer error monitoring mechanism analysis
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2020-01-11 |
|
[ 1598 ]
|
MTN UNI and NNI fault condition processing consideration
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2020-01-11 |
|
[ 1597 ]
|
Discussion and comparison of proposed OAM mechanisms
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2020-01-11 |
|
[ 1596 ]
|
Proposal for the specification of MTN path subnetwork
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2020-01-11 |
|
[ 1595 ]
|
Outline proposal for a draft new recommendation G.mtn architecture
|
Huawei Technologies Co., Ltd. (China)
|
Q12/15
|
2020-01-14 |
|
[ 1594 ]
|
Proposals on WP2/15 restructuring for the next study period
|
Japan
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2020-01-11 |
|
[ 1593 ]
|
L.100-rev 2020 criteria rationale
|
OFS Fitel, LLC (United States)
|
Q16/15
|
2020-01-10 |
|
[ 1592 ]
|
Open Cable budget proposal for Recommendation G.977.1
|
Subcom, LLC (United States)
|
Q8/15
|
2020-01-10 |
|
[ 1591 ]
|
Monitoring Oscillator and Frequency Fault
|
Ciena Canada
|
Q13/15
|
2020-01-10 |
|
[ 1590 ]
|
Timing distribution over G.mtn interfaces
|
Ciena Canada
|
Q13/15
|
2020-01-10 |
|
[ 1589 ]
|
SyncE for PAM4 based interfaces
|
Ciena Canada
|
Q13/15
|
2020-01-10 |
|
[ 1588 ]
|
Specific management of telecommunications
|
Central African Rep.
|
Q17/15
|
2020-01-10 |
|
[ 1587 ]
|
Detailed explanation on the request for assistance from ITU-T
|
Ministère des Postes, des Télécommunications et de l'Economie Numérique (Guinea)
|
QALL/15
|
2020-01-10 |
|
[ 1586 ]
|
Proposal to specify oFEC for FlexO-LR 450 km application
|
Acacia Communications, Inc (United States)
|
Q11/15
|
2020-01-10 |
|
[ 1585 ]
|
Draft new recommendation for Requirements for Fibre Optic Network Terminal Box: L.font
|
Ministry of Communications (India)
,
Sterlite Optical Technologies Ltd (India)
|
Q16/15
|
2020-01-10 |
|
[ 1584 ]
|
Proposal to include a new Appendix to the Draft New Recommendation ITU-T L.oha "Optical fibre cables for in-home applications"
|
Ministry of Communications (India)
,
Sterlite Optical Technologies Ltd (India)
|
Q16/15
|
2020-01-10 |
|
[ 1583 ]
|
Proposal on new Technical Report for "Optical fibre and cable for space division multiplexing transmission"
|
Communication Line Products Association of Japan
,
KDDI Corporation (Japan)
,
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q5/15
|
2020-01-10 |
|
[ 1582 ]
|
Proposed modification to Appendix III of Recommendation G.650.1
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q5/15
|
2020-01-10 |
|
[ 1581 ]
|
Modification proposal on draft new Recommendation G.977.1
|
Communication Line Products Association of Japan
,
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q8/15
|
2020-01-10 |
|
[ 1580 ]
|
Proposal of update of GNSS-TR
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q13/15
|
2020-01-10 |
|
[ 1579 ]
|
Proposal of methods of PRTC time error measurement assuming non-ideal GNSS signal reception environments
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q13/15
|
2020-01-10 |
|
[ 1578 ]
|
Proposal of revised Appendix of TDD interference in G.8271
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q13/15
|
2020-01-10 |
|
[ 1577 ]
|
Consideration of cascaded T-TC media converters on G.8273.3 Amd2
|
NEC Corporation (Japan)
|
Q13/15
|
2020-01-10 |
|
[ 1576 ]
|
Relative cost analysis to determine the number of TWDM channels in G.9804 series
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/15
|
2020-01-10 |
|
[ 1575 ]
|
Proposal for ComTC Clause 19
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2020-01-10 |
|
[ 1574 ]
|
Proposal for ComTC Clause 18
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2020-01-10 |
|
[ 1573 ]
|
Proposal for ComTC Clause 17
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2020-01-10 |
|
[ 1572 ]
|
Proposal for ComTC Clause 16
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2020-01-10 |
|
[ 1571 ]
|
A proposal of structure revision of Clause 7 of G Suppl.55
|
National Institute of Information and Communications Technology (NICT) (Japan)
|
Q2/15
|
2020-01-10 |
|
[ 1570 ]
|
Proposed guideline and criteria for making new cable Recommendation in Q16
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q16/15
|
2020-01-10 |
|
[ 1569 ]
|
Proposed modifications to draft L.tifm
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q17/15
|
2020-01-10 |
|
[ 1568 ]
|
Cable identification using reflectometry-based optical vibration sensing
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q17/15
|
2020-01-10 |
|
[ 1567 ]
|
Proposal for ComTC Clause 14
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2020-01-10 |
|
[ 1566 ]
|
Withdrawn
Reposted as TD209/WP2
|
N/A
|
|
2020-01-09 |
|
[ 1565 ]
|
Considerations on the Cluster of Base Station Network Reference model and on the related network performance measurements [G.8271.1]
|
Telefon AB - LM Ericsson (Sweden)
|
Q13/15
|
2020-01-08 |
|
[ 1564 ]
|
IEEE1588-2019 [G.8275.1, G.8275.2, G.8265.1]
|
Telefon AB - LM Ericsson (Sweden)
|
Q13/15
|
2020-01-08 |
|
[ 1563 ]
|
Enhanced Synchronization Accuracy metrics TLV [G.8275.1]
|
Telefon AB - LM Ericsson (Sweden)
|
Q13/15
|
2020-01-08 |
|
[ 1562 ]
|
Addressing less stringent requirements with G.8275.2 [G.8271, G8271.2, G.8275.2]
|
Telefon AB - LM Ericsson (Sweden)
|
Q13/15
|
2020-01-08 |
|
[ 1561 ]
|
Proposal for OTNsec Operational Data Plane Model and Terminology
|
Cisco Systems, Inc. (United States)
|
Q11/15
|
2020-01-08 |
Results:2858 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48 -
49 -
50 -
51 -
52 -
53 -
54 -
55 -
56 -
57 -
58
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):