International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2021-12-06 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2021-12-06) 

ITU-T SG 15

Transport, access and home

Study Period 2017

Meeting  from 2021-12-06 to 2021-12-17

held in E-Meeting

Other Meetings : 2021-04-12  2020-09-07  2020-01-27  2019-07-01  2018-10-08  2018-01-29  2017-06-19 

Results:45 total items.
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2861 ]  
 
Appendix on Equipment/Network Analysis/Budget [G.8273.4]     Microchip Technology Inc. (United States)   Q13/15   2021-11-23
[ 2859 ]  
 
PTP Connection Monitoring with portDS.networkMonitor [G.8275.1]     Microchip Technology Inc. (United States)   Q13/15   2021-11-23
[ 2840 ]  
 
T-BC transients [G.8273.2]     Nokia Corporation (Finland)   Q13/15   2021-11-23
[ 2839 ]  
 
Application of Alternate Master to Monitoring Use Cases     Nokia USA (United States)   Q13/15   2021-11-23
[ 2837 ]  
 
Network Limits considerations [G.8271.2]     Nokia Corporation (Finland)   Q13/15   2021-11-23
[ 2835 ]  
 
Inclusion of interfering traffic in PTP performance testing [G.8273]     Calnex Solutions plc. (United Kingdom) , Nokia USA (United States)   Q13/15   2021-11-23
[ 2833 ]  
 
Maximum Inter-Message Interval [G.8275.2]     Nokia Corporation (Finland)   Q13/15   2021-11-23
[ 2831 ]  
 
Maximum Inter-Message Interval [G.8275.1]     Nokia Corporation (Finland)   Q13/15   2021-11-23
[ 2829 ]  
 
State diagram study ITU-T G.8275.1.     Orange (France)   Q13/15   2021-11-23
[ 2824 ]  
 
PTP Monitoring with Alternate Master     Nokia Corporation (Finland)   Q13/15   2021-11-23
[ 2803 ]  
 
Results of time error generation testing of T-BCs with FlexE-based interfaces     Calnex Solutions plc. (United Kingdom) , China Telecommunications Corporation   Q13/15   2021-11-23
[ 2802 ]  
 
G.8273.2: Appendix on Testing PTP Noise Tolerance of T-BC and T-TSC Clocks     Calnex Solutions plc. (United Kingdom)   Q13/15   2021-11-23
[ 2787 ]  
(Rev.1) 
Reply to 3GPP Liaison/ Ref: 3GPP TSG SA2-2106786-LS02)     China Unicom , Huawei Technologies Co., Ltd. (China) , Orange (France)   Q13/15   2021-11-23
[ 2786 ]  
 
Proposals for PTP Pac in G.7721     ZTE Corporation (China)   Q14/15, Q13/15   2021-11-23
[ 2785 ]  
 
Proposals for PTP Sync Pac in G.7721     ZTE Corporation (China)   Q14/15, Q13/15   2021-11-23
[ 2784 ]  
 
G.8271: 900 ns for end-to-end 5G Systems     Orange (France) , Huawei Technologies Co., Ltd. (China)   Q13/15   2021-11-23
[ 2782 ]  
 
G. 8275.1 T-BC ClockClass values corresponding to "holdover" during a "free-run".     Orange (France) , Huawei Technologies Co., Ltd. (China)   Q13/15   2021-11-23
[ 2780 ]  
 
Proposal for NE Sync Pac in G.7721     ZTE Corporation (China)   Q14/15, Q13/15   2021-11-23
[ 2779 ]  
 
Attributes for physical layer frequency synchronization [G.781]     China Mobile Communications Co. Ltd. , ZTE Corporation (China)   Q13/15   2021-11-23
[ 2775 ]  
 
Considerations on PRTC deployment scenarios     China Information Communication Technologies Group   Q13/15   2021-11-23
[ 2774 ]  
 
Further considerations on monitoring function and restoration of the PTSF port     China Information Communication Technologies Group   Q13/15   2021-11-23
[ 2766 ]  
 
Proposal on the text of G.7721.1     China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany)   Q14/15, Q13/15   2021-11-23
[ 2763 ]  
 
PTP Announce Message Delay times     China Mobile Communications Co. Ltd.   Q13/15   2021-11-23
[ 2756 ]  
 
Proposal on timestamp generation for MTN     China Mobile Communications Co. Ltd.   Q13/15, Q11/15   2021-11-23
[ 2737 ]  
 
Proposed a new work item on a new PTP profile for accuracy path selection (G. 8275.x)     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q13/15   2021-11-23
[ 2722 ]  
 
EEC output from T-BC-P / T-TSC-P clock model     Ciena Canada   Q13/15   2021-11-22
[ 2716 ]  
 
Requirement on satellite common view system     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q13/15   2021-11-22
[ 2711 ]  
 
Proposed updates to the YANG model in G.7721.1 v0.03     China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany)   Q14/15, Q13/15   2021-11-22
[ 2710 ]  
 
Proposed updates to the UML model in G.7721.1 v0.03     China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany)   Q14/15, Q13/15   2021-11-22
[ 2671 ]  
 
PTSF restoration [G.8275.1]     Huawei Technologies Co., Ltd. (China)   Q13/15   2021-11-22
[ 2670 ]  
 
PRTC and ePRTC attributes Appendix [G.8275.1]     China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , Orange (France)   Q13/15   2021-11-22
[ 2669 ]  
 
Time error monitor [G.8275.1]     China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2021-11-22
[ 2668 ]  
 
G.781.1 Clauses 9.2.1 and 9.2.2     China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China)   Q13/15   2021-11-22
[ 2667 ]  
 
IEEE 802.3cx message timestamp point     China Unicom , Huawei Technologies Co., Ltd. (China)   Q13/15   2021-11-22
[ 2666 ]  
 
Some further analysis of OSU timing     China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q13/15, Q11/15   2021-11-22
[ 2661 ]  
 
Time network with multiple time transfer methods [G.8275]     China Unicom , Orange (France)   Q13/15   2021-11-22
[ 2660 ]  
 
For G8273.2, G.8262.1 oscillators actual holdover data     Epson America Inc. (United States)   Q13/15   2021-11-22
[ 2656 ]  
 
A.1 text for G.8272.2     Microchip Technology Inc. (United States)   Q13/15   2021-11-21
[ 2634 ]  
 
Consideration on the synchronization scheme for CBR over OSU     China Telecommunications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) (China)   Q13/15, Q11/15   2021-11-19
[ 2625 ]  
 
Continuous timescales in Telecom     Telefon AB - LM Ericsson (Sweden)   Q14/15, Q13/15   2021-11-18
[ 2617 ]  
 
Usage of PTP enhanced accuracy TLV     Telefon AB - LM Ericsson (Sweden)   Q13/15   2021-11-12
[ 2616 ]  
 
High Accuracy Time Stamping on ethernet interface considerations     Telefon AB - LM Ericsson (Sweden)   Q13/15   2021-11-12
[ 2612 ]  
 
Draft text for PTP over MTN in G.8275.1     Ciena Canada   Q13/15   2021-11-10
[ 2611 ]  
 
IPv6 in Telecom Profiles [G.8265.1, G.8275.2]     Telefon AB - LM Ericsson (Sweden)   Q13/15   2021-11-09
[ 2607 ]  
 
Optical Clocks, ePRTC and cnPRTC architecture     Deutsche Telekom AG (Germany) , Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q13/15   2021-10-15
Results:45 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-29