International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2021-04-12 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2021-04-12) 

ITU-T SG 15

Transport, access and home

Study Period 2017

Meeting  from 2021-04-12 to 2021-04-23

held in E-Meeting

Other Meetings : 2021-12-06  2020-09-07  2020-01-27  2019-07-01  2018-10-08  2018-01-29  2017-06-19 

Results:52 total items.
Result page:  1 - 2  - Next Next
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2599 ]  
 
Appendix on Equipment/Network Analysis/Budget [G.8273.4]     Microchip Technology Inc. (United States)   Q13/15   2021-03-30
[ 2597 ]  
 
PTP Unsupported Ingress clockClass [G.8275.1, G.8275.2]     Microchip Technology Inc. (United States)   Q13/15   2021-03-30
[ 2596 ]  
 
PTP Connection Monitoring [G.8275.1, G.8275.2]     Microchip Technology Inc. (United States)   Q13/15   2021-03-30
[ 2593 ]  
 
Status of IPv6 for PTP     Telefon AB - LM Ericsson (Sweden)   Q13/15   2021-03-30
[ 2538 ]  
 
G.8273.4: Appendix on Testing PTP Noise Tolerance of APTS and PTS Clocks     Calnex Solutions plc. (United Kingdom)   Q13/15   2021-03-30
[ 2537 ]  
(Rev.1) 
G.8273.2: Appendix on Testing PTP Noise Tolerance of T-BC and T-TSC Clocks     Calnex Solutions plc. (United Kingdom)   Q13/15   2021-03-30
[ 2536 ]  
 
The role of "end application" in the context of 5G Industrial IIoT Systems     Orange (France)   Q13/15   2021-03-30
[ 2534 ]  
 
Clock synchronisation service performance requirements for 5G Systems     Huawei Technologies Co., Ltd. (China) , Orange (France)   Q13/15   2021-03-30
[ 2532 ]  
 
Performance requirements for G. 8273.2 when SyncE is lost and PTP continues: Further discussion     Orange (France)   Q13/15   2021-03-30
[ 2521 ]  
(Rev.1) 
Use case of FlexE over OTN [G.8271]     China Unicom , Huawei Technologies Co., Ltd. (China)   Q13/15   2021-03-30
[ 2501 ]  
 
Further considerations on the port actions after PTSF event     China Information Communication Technologies Group   Q13/15   2021-03-30
[ 2500 ]  
 
MTM PTP Profile and Stepness     Meinberg Funkuhren GmbH & Co.KG (Germany)   Q13/15   2021-03-30
[ 2499 ]  
 
Consideration on handling undefined clockClass values in G.8275.1 Amd2 and G.8275.2 Amd2     NEC Corporation (Japan)   Q13/15   2021-03-30
[ 2495 ]  
 
G.8275 common IEEE-1588-2019 appendix     Microchip Technology Inc. (United States)   Q13/15   2021-03-30
[ 2494 ]  
(Rev.1) 
High accuracy Class A (5ns) link performance     Microchip Technology Inc. (United States)   Q13/15   2021-03-30
[ 2485 ]  
 
Client synchronization through a FlexE or G.mtn network     Microchip Technology Inc. (United States)   Q13/15, Q11/15   2021-03-29
[ 2477 ]  
 
Cascaded T-TC clocks chain noise generation test results     Nokia Corporation (Finland)   Q13/15   2021-03-29
[ 2475 ]  
 
Removing FFS for IWF in Appendix [G.8275]     Nokia Corporation (Finland)   Q13/15   2021-03-29
[ 2467 ]  
 
cnPRTC Equipment Specification: G.8272.2     Deutsche Telekom AG (Germany)   Q13/15   2021-03-29
[ 2458 ]  
 
T-BC-A and T-TSC-A as grandmaster clock with holdover support from PTP     Nokia Corporation (Finland)   Q13/15   2021-03-29
[ 2457 ]  
 
PTP profile/domain IWF     Nokia Corporation (Finland)   Q13/15   2021-03-29
[ 2443 ]  
 
Test method of ePRC     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q13/15   2021-03-29
[ 2442 ]  
(Rev.1) 
Should syncUncertain trigger exclusion from BMCA     Nokia USA (United States)   Q13/15   2021-03-29
[ 2441 ]  
 
PTSF tracking     Nokia USA (United States)   Q13/15   2021-03-29
[ 2440 ]  
 
Proposal for G.781.1 SD-t Trail Termination Source Function     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q13/15   2021-03-29
[ 2439 ]  
 
Proposal for G.781.1 SD-t Layer to TRef Adaptation Source Function     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q13/15   2021-03-29
[ 2438 ]  
 
Minor correction of MTN sync message channel for G.mtn-sync draft     China Mobile Communications Corporation   Q13/15   2021-03-29
[ 2437 ]  
 
Proposal on MTN synchronization architecture     China Mobile Communications Corporation   Q13/15   2021-03-29
[ 2436 ]  
 
Timestamp generation for MTN     China Mobile Communications Corporation   Q13/15, Q11/15   2021-03-29
[ 2435 ]  
 
Proposal on synchronization over MTN Group     China Mobile Communications Corporation   Q13/15, Q11/15   2021-03-29
[ 2427 ]  
 
Attributes of physical layer frequency synchronization [G.781]     ZTE Corporation (China)   Q13/15   2021-03-29
[ 2423 ]  
 
OSU HRM consideration     China Information Communication Technologies Group , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q13/15, Q11/15   2021-03-29
[ 2421 ]  
 
Analysis and consideration of OSU clock     China Information Communication Technologies Group , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q13/15, Q11/15   2021-03-29
[ 2418 ]  
 
G.8251 Modification [G.8251]     China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2021-03-29
[ 2415 ]  
 
G.8275: Time error monitor     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q13/15   2021-03-29
[ 2414 ]  
 
New Phase/Time requirement     China Mobile Communications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , Orange (France)   Q13/15   2021-03-29
[ 2411 ]  
 
Dataset of physical layer clocks of G.781     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2021-03-29
[ 2408 ]  
 
Proposal for SD-t and NS-p Adaptation model of G.781.1     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q13/15   2021-03-29
[ 2407 ]  
 
Proposal for Figure 1 of G.781.1     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q13/15   2021-03-29
[ 2404 ]  
 
Proposal for Clause 8.6.2 of G.781.1     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q13/15   2021-03-29
[ 2401 ]  
 
Proposal for Clause 8.5 of G.781.1     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q13/15   2021-03-29
[ 2398 ]  
 
Initial proposal for SyncPHY UML and YANG Model in G.7721.1     Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany)   Q14/15, Q13/15   2021-03-29
[ 2397 ]  
 
Initial proposal for PTP UML and YANG Model in G.7721.1     Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany)   Q14/15, Q13/15   2021-03-29
[ 2396 ]  
 
YANG modelling issues for augmenting RFC8575     Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany)   Q14/15, Q13/15   2021-03-29
[ 2369 ]  
 
Future technical issues of high-accuracy frequency synchronization based on next-generation atomic clock     Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q13/15   2021-03-29
[ 2344 ]  
 
Timing loop performance analysis in frequency synchronization network     Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2021-03-27
[ 2293 ]  
 
PTP profiles sync and delay response timeout attribute, appendix describing consideration on what value to use     Telefon AB - LM Ericsson (Sweden)   Q13/15   2021-03-25
[ 2292 ]  
 
PTP profiles sync and delay response timeout attribute range     Telefon AB - LM Ericsson (Sweden)   Q13/15   2021-03-25
[ 2291 ]  
 
PTP profiles sync and delay response timeout attribute datatype     Telefon AB - LM Ericsson (Sweden)   Q13/15   2021-03-25
[ 2290 ]  
 
PTP profile G.8265.1 portDS.AnnounceReceiptTimeout     Telefon AB - LM Ericsson (Sweden)   Q13/15   2021-03-25
Results:52 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-29