International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2018-10-08 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2018-10-08) 

ITU-T SG 15

Transport, access and home

Study Period 2017

Meeting  from 2018-10-08 to 2018-10-19

held in Switzerland [Geneva]

Other Meetings : 2021-12-06  2021-04-12  2020-09-07  2020-01-27  2019-07-01  2018-01-29  2017-06-19 

Results:14 total items.
Contributions  [ Source: Orange (France) ]  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1062 ]  
 
Proposal for failure scenarios of fronthaul network [G.8271.1]     Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , Orange (France)   Q13/15   2018-09-25
[ 1061 ]  
 
Proposal for PTP function of PRTC-B and eRPTC     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , Orange (France)   Q13/15   2018-09-25
[ 934 ]  
 
G.8275 Fronthaul Architectures     Orange (France)   Q13/15   2018-09-24
[ 933 ]  
 
G.8271 Synchronization requirements for Inter-operator TDD operation     Orange (France)   Q13/15   2018-09-24
[ 932 ]  
 
G.8271: GNSS extended status message     Orange (France)   Q13/15   2018-09-24
[ 931 ]  
 
Measurement of Relative Time Error (TER) : G.8271.1 Appendix XI     Orange (France)   Q13/15   2018-09-24
[ 930 ]  
 
Text modification to G.8271.1 Appendix VII     Orange (France)   Q13/15   2018-09-24
[ 929 ]  
 
Fronthaul Architectures and Network Budgeting, G.8271.1 Appendix     Orange (France)   Q13/15   2018-09-24
[ 928 ]  
 
G.8272: Refinement of duplicated text in Appendix I (I.1) and Clause 6.1.     Orange (France)   Q13/15   2018-09-24
[ 927 ]  
 
G.8271 Table II.2: 5G Phase and Time requirements update     Orange (France)   Q13/15   2018-09-24
[ 926 ]  
(Rev.1) 
G.8271.1 Appendix: Phase and Time sync requirements for fronthaul transport     Orange (France)   Q13/15   2018-09-24
[ 925 ]  
 
G.8271: Synchronization requirements for E-UTRA-NR Dual Connectivity     Orange (France) , Huawei Technologies Co., Ltd. (China)   Q13/15   2018-09-24
[ 810 ]  
 
Defining relative time error [G.8260]     Calnex Solutions Limited (United Kingdom) , Nokia Corporation (Finland) , Orange (France)   Q13/15   2018-09-20
[ 749 ]  
(Rev.1) 
T-BC Class C/D performance specification for G.8273.2     A1 Telekom Austria AG , China Mobile Communications Corporation , Deutsche Telekom AG (Germany) , Orange (France)   Q13/15   2018-09-02
Results:14 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-3