Contributions
[ AI/Question: Q13/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1153 ]
|
Proposed process for WP3 questions to reclaim definitions from former Q3/15
|
Nokia USA (United States)
|
Q9/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2018-09-26 |
|
[ 1152 ]
(Rev.1) |
Noise Transfer for Back-to-Back EEC [G.8262, G.8262.1]
|
Microsemi Corporation (United States)
|
Q13/15
|
2018-09-25 |
|
[ 1142 ]
|
Modifications to Appendix IV [G.8271.2]
|
Microsemi Corporation (United States)
|
Q13/15
|
2018-09-25 |
|
[ 1139 ]
|
Noise Gen & Transfer Values [G.8273.4]
|
Microsemi Corporation (United States)
|
Q13/15
|
2018-09-25 |
|
[ 1135 ]
|
Jumping Windows & Transients for Network Observation [G.8271.2]
|
Microsemi Corporation (United States)
|
Q13/15
|
2018-09-25 |
|
[ 1134 ]
|
Use of SyncE for Assisting PTP with Examples [G.8273.4]
|
Microsemi Corporation (United States)
|
Q13/15
|
2018-09-25 |
|
[ 1131 ]
|
Variable Latency in Coherent Optics
|
Juniper Networks (United States)
|
Q13/15
|
2018-09-25 |
|
[ 1111 ]
|
G.8262: SyncE operation over interfaces using 50Gb/s PAM4 lanes
|
Calnex Solutions Limited (United Kingdom)
|
Q13/15
|
2018-09-25 |
|
[ 1097 ]
|
Model of error distribution at time synchronization in paket network in G.8271.1 Appendix X
|
Russian Federation
|
Q13/15
|
2018-09-25 |
|
[ 1095 ]
|
Assumptions for the Discussion of PTP Security
|
Meinberg Funkuhren GmbH & Co.KG (Germany)
|
Q13/15
|
2018-09-25 |
|
[ 1094 ]
|
Proposal to discuss with Q6/15 regarding passthrough clocking by removable transceivers
|
Cisco Systems, Inc. (United States)
|
Q13/15
|
2018-09-25 |
|
[ 1089 ]
(Rev.1) |
G.8273.3 Performance specification for Back to Back testing of Transparent Clock
|
Cisco Systems, Inc. (United States)
|
Q13/15
|
2018-09-25 |
|
[ 1081 ]
|
Background for Wide-Band Jitter Specifications and Relevance for SyncE clients of OTN (G.8251, G.8262, G.8262.1, G.8261)
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2018-09-25 |
|
[ 1079 ]
(Rev.1-2) |
Proposal to Add Jitter and Wander Tolerance Limits for 25G, 200G, and 400G Ethernet Interfaces in G.8251 (G.8251)
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2018-09-25 |
|
[ 1078 ]
|
Proposal to add ESMC Extensions to FlexO Atomic Functions in G.781) (G.781)
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2018-09-25 |
|
[ 1077 ]
|
Additional Simulation Results for Enhanced HRMs, including SyncE Rearrangements (G.8271.1, G.Suppl.sim)
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2018-09-25 |
|
[ 1076 ]
|
Additional Simulation Results for Enhanced HRMs, including SyncE Rearrangements with Mitigation by Turning Off the T-BC Filters (G.8271.1, G.Suppl.sim)
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2018-09-25 |
|
[ 1075 ]
|
Additional Simulation Results, with Measurement Filters, Based on Multiple Replications for Enhanced HRMs (G.8271.1, G.suppl.Sim)
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2018-09-25 |
|
[ 1073 ]
|
Time synchronization solution for OTN fronthaul network
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15, Q11/15
|
2018-09-25 |
|
[ 1064 ]
|
PTP link of cnPRTC
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2018-09-25 |
|
[ 1062 ]
|
Proposal for failure scenarios of fronthaul network [G.8271.1]
|
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Orange (France)
|
Q13/15
|
2018-09-25 |
|
[ 1061 ]
|
Proposal for PTP function of PRTC-B and eRPTC
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Orange (France)
|
Q13/15
|
2018-09-25 |
|
[ 1059 ]
|
Proposal for phase transient and holdover parameters of G.8262.1
|
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q13/15
|
2018-09-25 |
|
[ 1057 ]
|
Clock source selection with SSM and eSSM [G.781]
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2018-09-25 |
|
[ 1053 ]
|
The effect of time accuracy caused by optical module latency
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15, Q13/15, Q11/15
|
2018-09-25 |
|
[ 1052 ]
|
Proposal of T-BC class C specification
|
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q13/15
|
2018-09-25 |
|
[ 1039 ]
|
The considerations on the distributed time synchronization (DTS) and cnPRTC
|
China Mobile Communications Corporation
|
Q13/15
|
2018-09-25 |
|
[ 989 ]
|
Relative Time Error limit between GNSS receivers [G.8272]
|
ADVA Optical Networking (United Kingdom)
|
Q13/15
|
2018-09-25 |
|
[ 977 ]
|
1PPS performance
|
Microsemi Corporation (United States)
|
Q13/15
|
2018-09-25 |
|
[ 976 ]
(Rev.1) |
GNSS relative time error
|
Microsemi Corporation (United States)
|
Q13/15
|
2018-09-25 |
|
[ 975 ]
|
G.8273.1 clauses
|
Microsemi Corporation (United States)
|
Q13/15
|
2018-09-25 |
|
[ 974 ]
|
G.8275 cnPRTC appendix
|
Microsemi Corporation (United States)
|
Q13/15
|
2018-09-25 |
|
[ 973 ]
|
Proposal of functional diagram for SyncOAM
|
ZTE Corporation (China)
|
Q13/15
|
2018-09-25 |
|
[ 972 ]
|
T-BC time error specification
|
ZTE Corporation (China)
|
Q13/15
|
2018-09-25 |
|
[ 971 ]
|
Satellite common-view for monitoring
|
China Mobile Communications Corporation
,
ZTE Corporation (China)
|
Q13/15
|
2018-09-25 |
|
[ 970 ]
|
Proposed texts for G.Suppl.SyncOAM
|
China Mobile Communications Corporation
,
ZTE Corporation (China)
|
Q13/15
|
2018-09-25 |
|
[ 966 ]
|
Simulation of Least squares method applied in BC noise transfer testing
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q13/15
|
2018-09-25 |
|
[ 965 ]
|
Verification of Least squares method applied in BC noise transfer testing
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q13/15
|
2018-09-25 |
|
[ 956 ]
(Rev.1) |
Main idea of Least squares method applied in BC noise transfer testing
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q13/15
|
2018-09-25 |
|
[ 939 ]
|
Requirement for higher accuracy 1pps [G.703]
|
Nokia USA (United States)
|
Q13/15, Q11/15
|
2018-09-24 |
|
[ 938 ]
(Rev.1) |
Clarification on quality levels and clock class mapping specified in G.8265.1
|
Cisco Systems, Inc. (United States)
|
Q13/15
|
2018-09-24 |
|
[ 936 ]
(Rev.1) |
Latency parameters to consider for timestamping units
|
Cisco Systems, Inc. (United States)
|
Q13/15
|
2018-09-24 |
|
[ 934 ]
|
G.8275 Fronthaul Architectures
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 933 ]
|
G.8271 Synchronization requirements for Inter-operator TDD operation
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 932 ]
|
G.8271: GNSS extended status message
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 931 ]
|
Measurement of Relative Time Error (TER) : G.8271.1 Appendix XI
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 930 ]
|
Text modification to G.8271.1 Appendix VII
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 929 ]
|
Fronthaul Architectures and Network Budgeting, G.8271.1 Appendix
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 928 ]
|
G.8272: Refinement of duplicated text in Appendix I (I.1) and Clause 6.1.
|
Orange (France)
|
Q13/15
|
2018-09-24 |
|
[ 927 ]
|
G.8271 Table II.2: 5G Phase and Time requirements update
|
Orange (France)
|
Q13/15
|
2018-09-24 |
Results:86 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):