International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2017-06-19 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2017-06-19) 

ITU-T SG 15

Transport, access and home

Study Period 2017

Meeting  from 2017-06-19 to 2017-06-30

held in Switzerland [Geneva]

Other Meetings : 2021-12-06  2021-04-12  2020-09-07  2020-01-27  2019-07-01  2018-10-08  2018-01-29 

Results:15 total items.
Contributions  [ Source: Nokia Corporation ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 390 ]  
 
G.vector: Annex A: Optional value for the extended clipping limit of error sample reporting     Nokia Corporation   Q4/15   2017-06-06
[ 378 ]  
 
G.vector: Annex A: MREFPSD control parameter     Nokia Corporation   Q4/15   2017-06-06
[ 374 ]  
 
G.vector: Annex A: Proposed updates to TIGAVRESP command     Nokia Corporation   Q4/15   2017-06-06
[ 373 ]  
 
G.vector: Annex A: Valid values of F_sub_TIGAV and number of TIGAV bands     Nokia Corporation   Q4/15   2017-06-06
[ 372 ]  
 
G.vector: Annex A: Proposed updates to Annex A working text     Nokia Corporation   Q4/15   2017-06-06
[ 370 ]  
 
G.mgfast: Full Duplex over coax     Nokia Corporation   Q4/15   2017-06-06
[ 368 ]  
 
G.mgfast: A technology fulfilling future requirements     Nokia Corporation   Q4/15   2017-06-06
[ 348 ]  
(Rev.1) 
GNSS document introduction     Nokia Corporation   Q13/15   2017-06-06
[ 319 ]  
 
Comments on Annex W to G.9701     Broadcom Corporation (United States) , Intel Corporation (United States) , Nokia Corporation , Sckipio Technologies S.I. Ltd. (Israel)   Q4/15   2017-06-06
[ 300 ]  
 
APTS scenarios in 8271.2 and 8273.4     Nokia Corporation   Q13/15   2017-06-06
[ 265 ]  
 
Flush Logic in G.8032     Huawei Technologies Co., Ltd. (China) , Nokia Corporation   Q9/15   2017-06-06
[ 260 ]  
 
Cable delay effects and correction in a GNSS receiver     Nokia Corporation   Q13/15   2017-06-06
[ 243 ]  
(Rev.1) 
Effect of thermal ramps on phase accuracy for APTS and PTS implementations     Nokia Corporation   Q13/15   2017-06-06
[ 133 ]  
 
G.vdsl: Support of eoc datagram     Nokia Corporation   Q4/15   2017-06-05
[ 20 ]  
 
Ice and Snow affecting GNSS antenna     Nokia Corporation , Orange (France)   Q13/15   2017-05-30
Results:15 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-27