Contributions
[ AI/Question: Q4/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 394 ]
|
G.mgfast: Framing Issues
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2017-06-06 |
|
[ 393 ]
|
Considerations on the convergence of access and in-home systems
|
Maxlinear Inc (United States)
|
Q4/15, Q18/15
|
2017-06-06 |
|
[ 392 ]
|
G.fast: Additional cDTA Emulation Results
|
ADTRAN (United States)
|
Q4/15
|
2017-06-06 |
|
[ 391 ]
|
Proposed working text for DO-based DTA Appendix
|
Intel Corporation (United States)
|
Q4/15
|
2017-06-06 |
|
[ 390 ]
|
G.vector: Annex A: Optional value for the extended clipping limit of error sample reporting
|
Nokia Corporation
|
Q4/15
|
2017-06-06 |
|
[ 386 ]
|
G.Fast: cross-layer DTA control based on the state of traffic priority queues
|
ZTE Corporation (China)
|
Q4/15
|
2017-06-06 |
|
[ 385 ]
(Rev.1-2) |
G.mgfast: BT Requirements vision
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2017-06-06 |
|
[ 384 ]
|
G.fast: On propagation of common mode noise from electrical mains supply
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2017-06-06 |
|
[ 382 ]
|
G.fast: optimized vectoring method for high-frequency band
|
ZTE Corporation (China)
,
ASSIA Inc.
|
Q4/15
|
2017-06-06 |
|
[ 381 ]
|
G.fast: Comments on INM
|
Broadcom Corporation (United States)
|
Q4/15
|
2017-06-06 |
|
[ 380 ]
|
G.fast: G.mgfast: Requirements for weighted coherent transmission pre-combining (WCTP)
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2017-06-06 |
|
[ 379 ]
|
G.fast: Comments on RMCR
|
Broadcom Corporation (United States)
|
Q4/15
|
2017-06-06 |
|
[ 378 ]
|
G.vector: Annex A: MREFPSD control parameter
|
Nokia Corporation
|
Q4/15
|
2017-06-06 |
|
[ 377 ]
|
G.vdsl: LR-VDSL Symbol definitions and alignment
|
Broadcom Corporation (United States)
|
Q4/15
|
2017-06-06 |
|
[ 374 ]
|
G.vector: Annex A: Proposed updates to TIGAVRESP command
|
Nokia Corporation
|
Q4/15
|
2017-06-06 |
|
[ 373 ]
|
G.vector: Annex A: Valid values of F_sub_TIGAV and number of TIGAV bands
|
Nokia Corporation
|
Q4/15
|
2017-06-06 |
|
[ 372 ]
|
G.vector: Annex A: Proposed updates to Annex A working text
|
Nokia Corporation
|
Q4/15
|
2017-06-06 |
|
[ 370 ]
|
G.mgfast: Full Duplex over coax
|
Nokia Corporation
|
Q4/15
|
2017-06-06 |
|
[ 368 ]
|
G.mgfast: A technology fulfilling future requirements
|
Nokia Corporation
|
Q4/15
|
2017-06-06 |
|
[ 364 ]
|
G.mgfast: On the scope of the G.mgfast project
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2017-06-06 |
|
[ 361 ]
|
On the G.mgfast routing topologies
|
Intel Corporation (United States)
|
Q4/15
|
2017-06-06 |
|
[ 360 ]
|
Proposed bandwidth for G.mgfast
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
AT&T, Inc. (United States)
,
Intel Corporation (United States)
,
Sckipio Technologies S.I. Ltd. (Israel)
|
Q4/15
|
2017-06-06 |
|
[ 351 ]
(Rev.1) |
G.fast: On controls for the optimisation of vectoring
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2017-06-06 |
|
[ 349 ]
|
G.fast: G.mgfast: On slicing in G.fast and G.mgfast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2017-06-06 |
|
[ 321 ]
|
Proposed text changes in Annex A of G.993.5 (error clipping)
|
Intel Corporation (United States)
|
Q4/15
|
2017-06-06 |
|
[ 320 ]
|
Update of the working text for RMCR
|
Intel Corporation (United States)
|
Q4/15
|
2017-06-06 |
|
[ 319 ]
|
Comments on Annex W to G.9701
|
Broadcom Corporation (United States)
,
Intel Corporation (United States)
,
Nokia Corporation
,
Sckipio Technologies S.I. Ltd. (Israel)
|
Q4/15
|
2017-06-06 |
|
[ 318 ]
|
Support of INM functionality (G.9701 Amd 4)
|
Intel Corporation (United States)
|
Q4/15
|
2017-06-06 |
|
[ 317 ]
|
Update of the working text for INM
|
Intel Corporation (United States)
|
Q4/15
|
2017-06-06 |
|
[ 316 ]
|
Proposed corrigendum to G.998.4
|
Intel Corporation (United States)
|
Q4/15
|
2017-06-06 |
|
[ 315 ]
|
G.994.1 handshake for Annex B of G.993.5
|
Intel Corporation (United States)
|
Q4/15
|
2017-06-06 |
|
[ 313 ]
|
Proposed text changes in Annex B of G.993.5 (TX signals)
|
Intel Corporation (United States)
|
Q4/15
|
2017-06-06 |
|
[ 312 ]
(Rev.1) |
Proposed text changes in Annex A of G.993.5 (TIGAV/TIGAVRESP)
|
Intel Corporation (United States)
|
Q4/15
|
2017-06-06 |
|
[ 311 ]
|
Proposed text changes in Annex A of G.993.5 (TIGAV procedure)
|
Intel Corporation (United States)
|
Q4/15
|
2017-06-06 |
|
[ 308 ]
|
G.fast: optimized vectoring method for high-frequency band
Duplicate of C382
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
ZTE Corporation (China)
|
Q4/15
|
2017-06-06 |
|
[ 299 ]
|
G.fast: optimized vectoring method for high-frequency band
Duplicate of C382
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
ZTE Corporation (China)
|
Q4/15
|
2017-06-06 |
|
[ 298 ]
|
G.fast: optimized vectoring method for high-frequency band
Duplicate of C382
|
ZTE Corporation (China)
,
ZTE Corporation (China)
|
Q4/15
|
2017-06-06 |
|
[ 297 ]
|
G.fast: optimized vectoring method for high-frequency band
Duplicate of C382
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
ZTE Corporation (China)
|
Q4/15
|
2017-06-06 |
|
[ 296 ]
|
G.fast: optimized vectoring method for high-frequency band
Duplicate of C382
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
ZTE Corporation (China)
|
Q4/15
|
2017-06-06 |
|
[ 293 ]
|
G.fast: optimized vectoring method for high-frequency band
Duplicate of C382
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
ZTE Corporation (China)
|
Q4/15
|
2017-06-06 |
|
[ 288 ]
|
G.fast: cDTA working text
|
ADTRAN (United States)
,
Sckipio Technologies S.I. Ltd. (Israel)
|
Q4/15
|
2017-06-06 |
|
[ 287 ]
|
G.fast: Proposal for an Improved cDTA Framework
|
ADTRAN (United States)
,
Sckipio Technologies S.I. Ltd. (Israel)
|
Q4/15
|
2017-06-06 |
|
[ 281 ]
|
G.fast: Comparing different proposals to implement DTA for environments with crosstalk (a.k.a Coordinated DTA)
|
Sckipio Technologies S.I. Ltd. (Israel)
|
Q4/15
|
2017-06-06 |
|
[ 280 ]
|
G.fast: Proposed clarification to G.9701 (corrigendum) to address the BBF's liaison to Q4/15 titled "Seeking clarification on interaction of FRA and SRA operations in G.fast"
|
Sckipio Technologies S.I. Ltd. (Israel)
|
Q4/15
|
2017-06-06 |
|
[ 247 ]
|
G.mgfast: Simulation of Aggregate Data Rate of CAT5e & CAT6 Cables
|
Huawei Technologies Co., Ltd. (China)
,
CAICT
,
MITT
|
Q4/15
|
2017-06-06 |
|
[ 245 ]
|
G.mgfast: Channel Measurements of CAT5e & CAT6 Cables
|
Huawei Technologies Co., Ltd. (China)
,
CAICT
,
MITT
|
Q4/15
|
2017-06-06 |
|
[ 193 ]
(Rev.1) |
G.vdsl: Proposed changes in Annex D and main body for LR-VDSL
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2017-06-05 |
|
[ 192 ]
(Rev.1) |
LR-VDSL2 upstream PSD
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2017-06-05 |
|
[ 189 ]
|
G.fast: Triggering Criteria for RMCR
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 188 ]
|
G.fast: Improving RMCR
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
Results:66 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):