Contributions
[ Source: Huawei Technologies Co., Ltd. ] [ AI/Question: Q4/5 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 872 ]
(Rev.1) |
Draft of new version of ITU-T K.114 "Electromagnetic compatibility requirements and measurement methods for digital cellular mobile communication base station equipment"
|
Huawei Technologies Co., Ltd. (China)
|
Q4/5
|
2021-11-17 |
|
[ 685 ]
(Rev.1) |
Draft new Recommendation ITU-T K.PLC_emc : " Electromagnetic compatibility requirements and measurement methods for equipment and installations in outdoor applications using power line communication technology "
|
Huawei Technologies Co., Ltd. (China)
|
Q4/5
|
2020-09-29 |
|
[ 573 ]
(Rev.1) |
"EMC test method guide for integrated or combined equipment with radio function module"
|
Huawei Technologies Co., Ltd. (China)
|
Q4/5
|
2019-09-03 |
|
[ 572 ]
(Rev.1) |
Application information on draft Recommendation ITU-T K.PLC.EMC "Electromagnetic compatibility requirements and measurement methods for outdoor equipment using power line communication technology"
|
Huawei Technologies Co., Ltd. (China)
|
Q4/5
|
2019-09-03 |
|
[ 449 ]
|
Proposed new work item on draft Recommendation ITU-T K.PLC.EMC "Electromagnetic compatibility requirements and measurement methods for outdoor equipment using power line communication technology"
|
Huawei Technologies Co., Ltd. (China)
|
Q4/5
|
2019-04-26 |
|
[ 431 ]
|
5th draft of the new ITU-T Recommendation K.ipe "Electromagnetic compatibility requirements for Information Perception Equipment"
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q4/5
|
2019-04-25 |
|
[ 381 ]
(Rev.1) |
The 3rd Draft new Recommendation ITU-T K.wire-line_emc
|
Huawei Technologies Co., Ltd.
|
Q4/5
|
2018-08-29 |
|
[ 320 ]
(Rev.1) |
4th draft of the new ITU-T Recommendation K.ipe "Electromagnetic compatibility requirements for Information Perception Equipment"
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q4/5
|
2018-08-24 |
|
[ 242 ]
|
Second Draft new Recommendation ITU-T K.wire-line_emc
|
Huawei Technologies Co., Ltd.
|
Q4/5
|
2018-05-03 |
|
[ 140 ]
(Rev.1) |
Second Draft new Recommendation ITU-T K.wire-line_emc
|
Huawei Technologies Co., Ltd.
|
Q4/5
|
2017-10-30 |
Results:10 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):