International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 5 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 5  C 

ITU-T SG 5

Environment, climate change and circular economy

Study Period 2017

Results:609 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 309 ]  
(Rev.1) 
Review of IEC 62368-1 varistor requirements for possible inclusion in K.77     Bourns Limited   Q2/5   2018-07-29
[ 308 ]  
(Rev.1) 
Draft ITU-T Recommendation L.SIB "Sustainable and intelligent building services"     Secretaría de Estado para la Sociedad de la Información y la Agenda Digital (Spain)   Q6/5   2018-07-26
[ 307 ]  
 
LTspice simulation of metal oxide varistors, MOVs, and the definition of an MOV     Bourns Limited   Q2/5   2018-07-23
[ 306 ]  
(Rev.1) 
The impact of ICTs in national adaptation and mitigation plans for climate change and the environment     Autorité Nationale de Régulation des Technologies de l'Information et de la Communication (ANRTIC) (Comoros)   Q9/5   2018-07-18
[ 305 ]  
 
Clauses applicable to external circuits in IEC 62368-1 Edition 3     Bourns Limited   Q2/5   2018-07-17
[ 304 ]  
 
EMF Measurement in Sudan     Telecommunications and Post Regulatory Authority (Sudan)   Q3/5   2018-07-17
[ 303 ]  
 
DC power interface surge analysis - tests 7.8 and 7.9 of K.20 and K.21     Bourns Limited   Q2/5   2018-07-13
[ 302 ]  
(Rev.1) 
Re-review of C261 (K.21 contribution)     Bourns Limited   Q2/5   2018-07-06
[ 301 ]  
(Rev.1) 
Re-review of C244 (K.20 contribution)     Bourns Limited   Q2/5   2018-07-06
[ 300 ]  
 
Re-review of C243 (K.44 contribution)     Bourns Limited   Q2/5   2018-07-06
[ 299 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 9: Proposal consolidation of C291 to C298     Bourns Limited   Q2/5   2018-07-05
[ 298 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 8: Updating K.44 for 400 V d.c. powering     Bourns Limited   Q2/5   2018-07-04
[ 297 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 7: Test circuit figure to replace K.44 Figure A.6.6-2, Figure A.6.6-1a and Figure A.6.6-1b.     Bourns Limited   Q2/5   2018-07-03
[ 296 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 6: Review of 7.8 and 7.9 test entries (K.20 and K.21)     Bourns Limited   Q2/5   2018-07-03
[ 295 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 5: Review of DC power feed surge test figures of Table 1b (K.20, K.21 and K.45)     Bourns Limited   Q2/5   2018-07-02
[ 294 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 4: DC power feed tests of Tables 1a and 1b (K.20, K.21 and K.45)     Bourns Limited   Q2/5   2018-07-01
[ 293 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 3: Powering supply configurations     Bourns Limited   Q2/5   2018-06-30
[ 292 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 2: Grid terms review     Bourns Limited   Q2/5   2018-06-30
[ 291 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part1 Background     Bourns Limited   Q2/5   2018-06-29
[ 290 ]  
 
Proposed new work item on Opportunities of the Circular Economy of E-waste management     Rwanda , Senegal   Q7/5   2018-06-28
[ 289 ]  
(Rev.1) 
Proposed new work item on Adequate Assessment and Sensitization on the Impact of Counterfeit Electronics Products on the environment in Africa     Kenya , Rwanda , Tanzania , Uganda   Q7/5   2018-06-28
[ 288 ]  
 
Regional e-waste management strategy for the East African Region     Kenya , Rwanda , Uganda   Q7/5   2018-06-28
[ 287 ]  
 
End of life Management (EoL) management of communications equipment and products     Uganda Communications Commission (UCC)   Q7/5   2018-06-28
[ 286 ]  
 
Social aspects in the management of e-waste     Ministry of Communications and Information Technology (MCIT) (Egypt)   Q7/5   2018-06-28
[ 285 ]  
 
The Role of Policy, Regulations, Standards in E-Waste Management (Case Study Rwanda)     Rwanda   Q7/5   2018-06-28
[ 284 ]  
 
Extended producer responsibility in developing countries and countries with economies in transition     Uganda Communications Commission (UCC)   Q7/5   2018-06-28
[ 283 ]  
 
Smart Technology for Smart & Sustainable Agriculture in the Arab Region     Arab Information and Communication Technology Organization (AICTO)   Q9/5   2018-06-27
[ 282 ]  
 
Comparison of accreditation standards for e-waste recyclers     Ministry of Communications and Information Technology (MCIT) (Egypt) , Palestine Technical University Kadoorie (State of Palestine) , Sudan   Q7/5   2018-06-27
[ 281 ]  
 
Proposed new work item on Sustainable management of batteries resulting from ICT equipment Sustainable management of batteries resulting from ICT equipment     Kenya , Ministry of Communications and Information Technology (MCIT) (Egypt) , Palestine Technical University Kadoorie (State of Palestine) , Sudan , Uganda Communications Commission (UCC)   Q7/5   2018-06-27
[ 280 ]  
 
Experimental Pilot Plant on e-Waste for Smart Cities based on the circular economy     Argentina   Q7/5   2018-06-26
[ 279 ]  
 
Electromagnetic field measurements to assess human exposure for 5G (IMT 2020) base station     Agencia Nacional del Espectro (ANE) (Colombia)   Q3/5   2018-06-26
[ 278 ]  
 
Integration of K-series ITU T Recommendations for the regulation of compliance with electromagnetic field exposure levels in the Republic of Colombia     Agencia Nacional del Espectro (ANE) (Colombia)   Q3/5   2018-06-26
[ 277 ]  
 
Proposed new work item on K.Small - "Small base stations - impact on the overall exposure level"     Argentina   Q3/5   2018-05-09
[ 276 ]  
 
Proposed new work item on K.reflection - "Impact of the metallic structures for the EMF exposure level"     Argentina   Q3/5   2018-05-09
[ 275 ]  
 
Proposed new work item on K.peak - "Comparison between peak and real exposure in the long term considerations"     Argentina   Q3/5   2018-05-09
[ 274 ]  
 
Proposed new work item on ITU-T K.Zones - "Guidance on Determining the Compliance Boundaries (the exclusion zone) of a Live Antenna"     Argentina   Q3/5   2018-05-09
[ 273 ]  
 
Proposed new work item on K.dosimeter - "Personal dosimeters as a device in assessing human exposure to EMF"     Argentina   Q3/5   2018-05-09
[ 272 ]  
(Rev.1) 
IEC 60617 compliance and PoE testing     Bourns Limited   Q2/5   2018-05-08
[ 271 ]  
(Rev.1-2) 
Insulation co-ordination and IEEE 802.3 insulation tests     Bourns Limited   Q2/5   2018-05-08
[ 270 ]  
(Rev.1) 
IP PoE camera systems - Bridging Functional Insulation - implications and system consequences     Bourns Limited   Q2/5, Q1/5   2018-05-08
[ 269 ]  
 
Clarification needed on PoE testing - topics for discussion     Bourns Limited   Q2/5   2018-05-08
[ 268 ]  
(Rev.1) 
Draft ITU-T Recommendation K.Radio.EMC - Electromagnetic Compatibility requirement for radio telecommunication equipment     Nokia Corporation   Q4/5   2018-05-08
[ 267 ]  
 
Referencing Figure 6.7-3 given in the ITU-T K.44     Bourns Limited   Q2/5   2018-05-08
[ 266 ]  
 
Adequate assessment and sensitization on possible human exposure to RF EMF radiation around telecommunications installations     Uganda Communications Commission (UCC)   Q3/5   2018-05-08
[ 265 ]  
(Rev.1) 
Harmonizing EMF Exposure Limits     Office of Electronic Communications , Poland   Q3/5   2018-05-08
[ 264 ]  
(Rev.1-3) 
Some reworked material for K.rcd document     Bourns Limited , China Telecommunications Corporation   Q2/5   2018-05-08
[ 263 ]  
(Rev.1) 
Proposed second draft of K.soft_req "Reliability requirement of particle radiation effect for telecommunication systems"     Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation   Q5/5   2018-05-08
[ 262 ]  
(Rev.1) 
Proposal of third draft of K.soft_mes "Quality estimation methods and application guidelines for mitigation measures based on particle radiation tests"     Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation   Q5/5   2018-05-08
[ 261 ]  
(Rev.1) 
Proposal for the revision of ITU-T Rec. K.21 (07/2017) Resistibility of telecommunication equipment installed in customer premises to overvoltages and overcurrents     Nokia Corporation   Q2/5   2018-05-07
[ 260 ]  
(Rev.1) 
Proposal for the revision of ITU-T Rec. K.45 (07/2017) Resistibility of telecommunication equipment installed in the access and trunk networks to overvoltages and overcurrents     Nokia Corporation   Q2/5   2018-05-07
Results:609 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2020-03-30