International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 5 : Meeting 2018-05-21 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 5  C (2018-05-21) 

ITU-T SG 5

Environment, climate change and circular economy

Study Period 2017

Meeting  from 2018-05-21 to 2018-05-25

held in Switzerland [Geneva]

Other Meetings : 2021-11-30  2021-05-11  2020-10-19  2020-05-11  2019-09-16  2019-05-13  2018-09-11  2018-03-05  2017-11-13  2017-05-15 

Results:62 total items.
Result page:  1 - 2  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 277 ]  
 
Proposed new work item on K.Small - "Small base stations - impact on the overall exposure level"     Argentina   Q3/5   2018-05-09
[ 276 ]  
 
Proposed new work item on K.reflection - "Impact of the metallic structures for the EMF exposure level"     Argentina   Q3/5   2018-05-09
[ 275 ]  
 
Proposed new work item on K.peak - "Comparison between peak and real exposure in the long term considerations"     Argentina   Q3/5   2018-05-09
[ 274 ]  
 
Proposed new work item on ITU-T K.Zones - "Guidance on Determining the Compliance Boundaries (the exclusion zone) of a Live Antenna"     Argentina   Q3/5   2018-05-09
[ 273 ]  
 
Proposed new work item on K.dosimeter - "Personal dosimeters as a device in assessing human exposure to EMF"     Argentina   Q3/5   2018-05-09
[ 272 ]  
(Rev.1) 
IEC 60617 compliance and PoE testing     Bourns Limited   Q2/5   2018-05-08
[ 271 ]  
(Rev.1-2) 
Insulation co-ordination and IEEE 802.3 insulation tests     Bourns Limited   Q2/5   2018-05-08
[ 270 ]  
(Rev.1) 
IP PoE camera systems - Bridging Functional Insulation - implications and system consequences     Bourns Limited   Q2/5, Q1/5   2018-05-08
[ 269 ]  
 
Clarification needed on PoE testing - topics for discussion     Bourns Limited   Q2/5   2018-05-08
[ 268 ]  
(Rev.1) 
Draft ITU-T Recommendation K.Radio.EMC - Electromagnetic Compatibility requirement for radio telecommunication equipment     Nokia Corporation   Q4/5   2018-05-08
[ 267 ]  
 
Referencing Figure 6.7-3 given in the ITU-T K.44     Bourns Limited   Q2/5   2018-05-08
[ 266 ]  
 
Adequate assessment and sensitization on possible human exposure to RF EMF radiation around telecommunications installations     Uganda Communications Commission (UCC)   Q3/5   2018-05-08
[ 265 ]  
(Rev.1) 
Harmonizing EMF Exposure Limits     Office of Electronic Communications , Poland   Q3/5   2018-05-08
[ 264 ]  
(Rev.1-3) 
Some reworked material for K.rcd document     Bourns Limited , China Telecommunications Corporation   Q2/5   2018-05-08
[ 263 ]  
(Rev.1) 
Proposed second draft of K.soft_req "Reliability requirement of particle radiation effect for telecommunication systems"     Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation   Q5/5   2018-05-08
[ 262 ]  
(Rev.1) 
Proposal of third draft of K.soft_mes "Quality estimation methods and application guidelines for mitigation measures based on particle radiation tests"     Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation   Q5/5   2018-05-08
[ 261 ]  
(Rev.1) 
Proposal for the revision of ITU-T Rec. K.21 (07/2017) Resistibility of telecommunication equipment installed in customer premises to overvoltages and overcurrents     Nokia Corporation   Q2/5   2018-05-07
[ 260 ]  
(Rev.1) 
Proposal for the revision of ITU-T Rec. K.45 (07/2017) Resistibility of telecommunication equipment installed in the access and trunk networks to overvoltages and overcurrents     Nokia Corporation   Q2/5   2018-05-07
[ 259 ]  
(Rev.1) 
Proposal for Annex A "Case Study" to supplement TD 366 K.Supp-5G_EMF_Compliance: Electromagnetic field (EMF) compliance assessments for 5G wireless networks     Ministry of Communications , India   Q3/5   2018-05-07
[ 258 ]  
(Rev.1) 
Proposal for Supplement K.BPrac (May 2018)     GSMA   Q3/5   2018-05-07
[ 257 ]  
 
Modified proposal for Appendix II of K.121 on RF-EMF Compliance of Shared Radiocommunications Sites     GSMA   Q3/5   2018-05-07
[ 256 ]  
(Rev.1) 
New version v 7.01 of the software "EMF-estimator"     Orange Polska S.A. , National Institute of Telecommunications , Poland   Q3/5   2018-05-07
[ 255 ]  
(Rev.1) 
Minimum distances to transmitting antennas     Orange Polska S.A.   Q3/5   2018-05-07
[ 254 ]  
(Rev.1) 
Revision of the ITU-T Recommendation K.90     Orange Polska S.A.   Q3/5   2018-05-07
[ 253 ]  
 
Comparison of controlled and uncontrolled exposure levels     Orange Polska S.A.   Q3/5   2018-05-07
[ 252 ]  
(Rev.1) 
Comparison of measurements of the exposure levels in countries with different exposure limits     Orange , Orange Polska S.A.   Q3/5   2018-05-07
[ 251 ]  
 
Exposure levels in the vicinity of the collocated base stations     Orange Polska S.A.   Q3/5   2018-05-07
[ 250 ]  
(Rev.1) 
Comments and proposed changes to K 44     Cisco Systems, Inc.   Q2/5   2018-05-07
[ 249 ]  
 
Proposal for the revision of K.123 "Electromagnetic compatibility requirements for electrical equipment in telecommunication facilities"     Nippon Telegraph and Telephone Corporation (NTT)   Q4/5   2018-05-07
[ 248 ]  
 
Proposal about resistibility level of internal Ethernet port     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-05-07
[ 247 ]  
 
Proposed revision of K.44 for definition of "Intra-system port"     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-05-07
[ 246 ]  
 
Comments and re-proposals on K.vss "Lightning protection and Earthing of Video Surveillance System"     Nippon Telegraph and Telephone Corporation (NTT)   Q1/5   2018-05-07
[ 245 ]  
(Rev.1) 
The fourth draft of K.psp "Protection of small-size telecommunication installations with poor earthing conditions"     China Unicom   Q1/5   2018-05-06
[ 244 ]  
(Rev.1) 
Proposal for the revision of ITU-T Rec. K.20 (07/2017) Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents     Nokia Corporation   Q2/5   2018-05-03
[ 243 ]  
(Rev.1) 
Proposals to revise K.44 (2017) Resistibility tests for telecommunication equipment exposed to overvoltagesand overcurrents - Basic Recommendation     Nokia Corporation   Q2/5   2018-05-03
[ 242 ]  
 
Second Draft new Recommendation ITU-T K.wire-line_emc     Huawei Technologies Co., Ltd.   Q4/5   2018-05-03
[ 241 ]  
(Rev.1-2) 
The proposal of Mains power contact test for outdoor UTP/STP Ethernet in ITU-T K.20/K.21/K.45     Huawei Technologies Co., Ltd.   Q2/5   2018-05-03
[ 240 ]  
 
Proposal to add a new Appendix to give some examples for protection GPS system against lightning in ITU-T K.112     Huawei Technologies Co., Ltd.   Q1/5   2018-05-03
[ 239 ]  
(Rev.1) 
Proposal for Appendix II of K.121 on the Shared Radiocommunications Site     Electronics and Telecommunications Research Institute (ETRI) , Korea (Rep. of) , Ministry of Science and ICT   Q3/5   2018-05-03
[ 238 ]  
(Rev.1) 
Proposal for some issues regarding the Technical Report on 5G and EMF     Electronics and Telecommunications Research Institute (ETRI) , Korea (Rep. of) , Ministry of Science and ICT   Q3/5   2018-05-03
[ 237 ]  
 
Proposed text for K.121 Annex on Guidance on environmental management for shared sites     China Telecommunications Corporation   Q3/5   2018-05-02
[ 236 ]  
(Rev.1) 
3rd draft of the new ITU-T Recommendation K.ipe "Electromagnetic compatibility requirements for Information Perception Equipment".     China Telecommunications Corporation , Beijing University of Posts and Telecommunications   Q4/5   2018-05-02
[ 235 ]  
 
Proposed second draft of new Recommendation K.spdsafe "Guidance on safety relating to the use of surge protective devices and surge protective components in customer building and access network"     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-04-27
[ 234 ]  
 
Comments on use of terms of insulation and isolation     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-04-27
[ 233 ]  
 
Study of the desirability of easing the overvoltage resistibility requirement for STP Ethernet ports in K.20 and K.21     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-04-26
[ 232 ]  
(Rev.1) 
A Study on necessity of overvoltage test of USB port in K.20 and K.21 (in the case of connecting USB device which is supplied power by an AC adapter)     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2018-04-26
[ 231 ]  
 
K.45 cable length of 6 meters or less are exempt from testing     ADTRAN   Q2/5   2018-04-23
[ 230 ]  
(Rev.1) 
Review of IEC 62305-4     Littelfuse UK Ltd.   Q1/5   2018-04-19
[ 229 ]  
 
K.20 internal cable length of 10 meters or less are exempt from testing.     ADTRAN   Q2/5   2018-04-19
[ 228 ]  
(Rev.1) 
Bridging Ethernet functional insulation     Bourns Limited   Q2/5   2018-04-19
Results:62 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-26