International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:67 total items.
Result page:  Previous -  1 - 2
Contributions  [ Source: Ericsson ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 442 ]  
 
Data Dictionary Updates for G.8152_v0.05 Sections 1.1-1.6     Telefon AB - LM Ericsson   Q14/15   2014-02-23
[ 362 ]  
(Rev.1) 
10 Gbit/s signal transmission at 50 GHz channel spacing in seeded DWDM system     Ericsson-LG   Q6/15   2013-06-18
[ 352 ]  
 
Proposal to add OTU0 frame format into G.709     Electronics and Telecommunications Research Institute (ETRI) , Ericsson-LG , SK Telecom   Q11/15   2013-06-18
[ 345 ]  
 
Spectral excursion and wavelength tuning granularity parameter values to G.989.2     Electronics and Telecommunications Research Institute (ETRI) , Ericsson-LG   Q2/15   2013-06-18
[ 344 ]  
(Rev.1) 
Parameter specifications proposal for NRZ 2.5G application codes in G.698.3     Electronics and Telecommunications Research Institute (ETRI) , Ericsson-LG   Q6/15   2013-06-18
[ 331 ]  
 
G.698.3 considerations to add OTU0 frame format into G.709     Electronics and Telecommunications Research Institute (ETRI) , Ericsson-LG , SK Telecom   Q11/15   2013-06-18
[ 297 ]  
 
Requirements for multichannel CWDM systems with multi sub-channel interface     Ericsson-LG , SK Telecom   Q6/15   2013-06-17
[ 296 ]  
 
Revision of network limits in G.8271.1     Calnex Solutions Limited , Huawei Technologies Co. Ltd. , Telefon AB - LM Ericsson   Q13/15   2013-06-17
[ 295 ]  
(Rev.1) 
Mitigation of time error due to SyncE transients in G.8273.2     Telefon AB - LM Ericsson   Q13/15   2013-06-17
[ 294 ]  
 
Coexistence of different profiles in G.8275     Telefon AB - LM Ericsson   Q13/15   2013-06-17
[ 209 ]  
 
Further clarification about application scenarios of new Metro DWDM     China Unicom , China Telecom , Ericsson , Fiberhome , Nokia Siemens Networks   Q6/15   2013-06-17
[ 177 ]  
 
Upstream inter-channel crosstalk impairment of TWDM-PON     Electronics and Telecommunications Research Institute (ETRI) , Ericsson-LG   Q2/15   2013-06-17
[ 174 ]  
(Rev.1-2) 
Eye mask for Proposed 200 GHz spaced 2.5 Gbps G.698.3 application code     Electronics and Telecommunications Research Institute (ETRI) , Ericsson-LG   Q6/15   2013-06-17
[ 101 ]  
 
G.metro scope proposal     ADVA Optical Networking , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Ericsson-LG , Italy , Nokia Siemens Networks GmbH & Co. KG , Telefon AB - LM Ericsson   Q6/15   2013-06-14
[ 45 ]  
 
Optical transceiver performance for the new CWDM applications with multi sub-channel interface     Ericsson-LG , SK Telecom   Q6/15   2013-06-13
[ 27 ]  
 
B100G - Power Saving     Telefon AB - LM Ericsson   Q6/15, Q11/15   2013-06-05
[ 26 ]  
 
Including Non-Orthogonal SCM in G.Sup.39     Telefon AB - LM Ericsson   Q6/15   2013-06-04
Results:67 total items.
Result page:  Previous -  1 - 2  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-10