International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:222 total items.
Result page:  1 - 2 - 3 - 4 - 5  - Next Next
Contributions  [ AI/Question: Q9/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2191 ]  
 
Ring port forwarding state     Alcatel-Lucent USA Inc.   Q9/15, Q14/15, Q10/15   2016-09-06
[ 2190 ]  
 
Review of, and comments on draft G.Sup-ELPDNI     Alcatel-Lucent USA Inc.   Q9/15   2016-09-06
[ 2165 ]  
(Rev.1) 
ODU SMP Operations Considerations     Huawei Technologies Co., Ltd.   Q9/15, Q14/15   2016-09-06
[ 2164 ]  
 
Considerations on 'Lockout of Protection (LoP)' for G.odusmp     China Unicom , Huawei Technologies Co., Ltd.   Q9/15   2016-09-06
[ 2141 ]  
 
Comments on Table 9-1/G.8021     NEC Corporation , Huawei Technologies Co., Ltd.   Q9/15, Q14/15, Q10/15   2016-09-06
[ 2140 ]  
 
Comments to the latest draft of G.Sup-ELPDNI     Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co., Ltd.   Q9/15   2016-09-06
[ 2139 ]  
 
Use of bridges and selectors in the latest draft of G.Sup-ELPDNI     Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co., Ltd.   Q9/15   2016-09-06
[ 2134 ]  
 
Comments on Draft New Recommendation G.808     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2016-09-06
[ 2132 ]  
 
Comments on Draft Amendment 1 to Recommendation G.8032 (08/2015)     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2016-09-06
[ 2108 ]  
 
Comments on draft G.8131 Amd.2 (TD575/PLEN)     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2016-09-06
[ 2107 ]  
 
Proposed modification to Clause 9.1.3.1 (EDNI message) of G.Sup-ELPDNI     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2016-09-06
[ 2098 ]  
 
Proposed text for MPLS-TP Shared Ring Protection (G.8132)     China Mobile Communications Corporation , Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co., Ltd.   Q9/15   2016-09-06
[ 2060 ]  
(Rev.1-3) 
Calling for Fundamental Solution for Cascaded and Nested Protection of Multiple OTN Domains for Future OTN Network     China Unicom   Q9/15   2016-09-05
[ 2059 ]  
 
Solution for Avoiding Sympathetic Switching in ODUk SNC/S Protected Domains     China Unicom , Huawei Technologies Co., Ltd.   Q9/15   2016-09-05
[ 2052 ]  
 
Requirement of clarify optical layer parameter for some new use cases     China Unicom   Q9/15, Q6/15   2016-09-05
[ 2010 ]  
 
Protection switching performance     Intel Corporation   Q9/15, Q11/15   2016-09-05
[ 1960 ]  
 
2-byte vs 4-byte APS protocol for ODU SMP     Alcatel-Lucent USA Inc.   Q9/15   2016-09-02
[ 1948 ]  
 
Proposal to update clause 11 "OTN survivability techniques" in G.872     ZTE Corporation   Q9/15, Q12/15, Q11/15   2016-09-02
[ 1916 ]  
 
Use of a Persistency Filter in ODUk SNC/S Protected Domains     Alcatel-Lucent International   Q9/15   2016-09-01
[ 1913 ]  
 
OTN connections and protected connections     Huawei Technologies Co., Ltd.   Q9/15, Q12/15, Q11/15   2016-09-01
[ 1904 ]  
(Rev.1) 
Proposed modifications to draft new Recommendation G.808     Coriant GmbH & Co. KG   Q9/15   2016-08-31
[ 1902 ]  
 
Proposed updates to G.873.1 Appendix III     Coriant GmbH & Co. KG   Q9/15   2016-08-31
[ 1901 ]  
 
Modelling media layer protection using the new G.872 model     Coriant GmbH & Co. KG   Q9/15, Q12/15, Q11/15   2016-08-31
[ 1849 ]  
(Rev.1) 
Proposal for MDSP compromise     ADVA Optical Networking , Alcatel-Lucent USA Inc. , Cisco Systems, Inc.   Q9/15   2016-02-02
[ 1794 ]  
 
Cascaded and nested protection     China Unicom , Huawei Technologies Co., Ltd.   Q9/15, Q11/15   2016-02-02
[ 1790 ]  
 
Test result for multi-domain nested protection     China Unicom   Q9/15   2016-02-02
[ 1788 ]  
 
Test result for multi-domain cascaded protection     China Unicom   Q9/15   2016-02-02
[ 1765 ]  
(Rev.1) 
Proposal of adding PW linear protection to G.8131     Electronics and Telecommunications Research Institute (ETRI) , Telecom Italia S.p.A.   Q9/15   2016-02-02
[ 1760 ]  
 
Reviews and proposed actions on TD438/WP3 (LS/i/r on request for clarification on IEEE STD 802.1AX)     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2016-02-02
[ 1758 ]  
 
DNI protection method in G.MDSP     ZTE Corporation   Q9/15   2016-02-02
[ 1738 ]  
 
Physical and logical node in G.MDSP     FiberHome Technologies Group   Q9/15   2016-02-02
[ 1737 ]  
(Rev.1) 
ERP consideration in G.MDSP     FiberHome Technologies Group   Q9/15   2016-02-02
[ 1736 ]  
 
Protection method for DNI scenario in G.mdsp     FiberHome Technologies Group   Q9/15   2016-02-02
[ 1735 ]  
(Rev.1) 
Proposals for Interconnection use case in Appendix I of G.MDSP     FiberHome Technologies Group   Q9/15   2016-02-02
[ 1715 ]  
 
Proposed Text to update Node Behavior in G.otnsmp     China Unicom , Huawei Technologies Co., Ltd.   Q9/15   2016-02-01
[ 1707 ]  
 
A solution for OTN DNI scenario in G.mdsp (SP#5)     Huawei Technologies Co., Ltd.   Q9/15   2016-02-01
[ 1706 ]  
 
A solution for Ethernet DNI scenario in G.mdsp (SP#4)     Huawei Technologies Co., Ltd.   Q9/15   2016-02-01
[ 1704 ]  
 
Proposed APS Encoding Format in G.otnsmp     Huawei Technologies Co., Ltd.   Q9/15   2016-02-01
[ 1689 ]  
 
Consideration of ERP Management in G.Sup52     FiberHome Technologies Group   Q9/15, Q14/15   2016-02-01
[ 1684 ]  
 
ERP Management Requirements of G.8032     FiberHome Technologies Group   Q9/15, Q14/15   2016-02-01
[ 1641 ]  
 
Requirement of evaluation of optical layer protection     China Unicom   Q9/15   2016-02-01
[ 1638 ]  
 
Comments on Reference model for centralized recovery     China Unicom   Q9/15, Q14/15, Q12/15   2016-02-01
[ 1635 ]  
 
Proposal of requirements for protection scheme in C 1632     Bharti Airtel Limited , China Unicom , Huawei Technologies Co., Ltd.   Q9/15   2016-02-01
[ 1632 ]  
 
Proposal of initial a new standardization for Port-based protection in OTN network     Bharti Airtel Limited , China Unicom , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Q9/15   2016-02-01
[ 1630 ]  
 
Proposal to restart working on G.8132 aligned with MPLS working group, IETF     China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q9/15   2016-02-01
[ 1629 ]  
 
Proposal on draft outline of Recommendation G.8132     China Mobile Communications Corporation   Q9/15   2016-02-01
[ 1625 ]  
 
Proposal on Hold-off timer     Electronics and Telecommunications Research Institute (ETRI) , ZTE Corporation   Q9/15   2016-02-01
[ 1623 ]  
 
Proposed texts for G.808.3     ZTE Corporation   Q9/15   2016-02-01
[ 1609 ]  
 
Proposals about centralized recovery for SDN controlled transport network     China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Q9/15, Q14/15, Q12/15   2016-02-01
[ 1601 ]  
 
Proposal to the centralized restoration for G.asdtn and HRM     Ministry of Industry and Information Technology (MIIT)   Q9/15, Q14/15, Q12/15   2016-02-01
Results:222 total items.
Result page:  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-26